BuildingCensus
–

Mb Hospital Parking

Parking in California, CA · 1835 Owens St, San Francisco · 94158

At a glance

Mb Hospital Parking is a 223,905-square-foot parking building at 1835 Owens St, San Francisco in San Francisco, California, built in 2013. In its 2023 California benchmarking disclosure it reported a site energy-use intensity of 7.9 kBtu/ft² and 66 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2023
Site EUI
7.9
kBtu/ft²
GHG emissions
66
tCO₂e
GHG intensity
0.3
kgCO₂e/ft²
Floor area
223,905
sq ft
Year built
2013
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

AB 802 (Public Resources Code §25402.10) · reporting year 2023

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI7.9 kBtu/ft²
Source EUI—
GHG emissions66 tCO₂e
GHG intensity0.3 kgCO₂e/ft²
Electricity270,952 kWh
Gross floor area223,905 sq ft
Source recordcalifornia:6863796:2023

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2023latest—7.9 kBtu/ft²66 tCO₂e
2022—7.2 kBtu/ft²52 tCO₂e
2020—9.8 kBtu/ft²82 tCO₂e
2019—6.8 kBtu/ft²39 tCO₂e
2018—5.2 kBtu/ft²82 tCO₂e

Compliance context

AB 802 (Public Resources Code §25402.10)

AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
1835 Owens St, San Francisco
State
California
ZIP
94158
Coordinates
37.76597, -122.39212

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in California · biggest emitters

How does Mb Hospital Parking compare with other parking buildings in California?

The latest disclosures cover 440 parking buildings in California, out of 40,029 buildings citywide. Its site EUI of 7.9 kBtu/ft² is about 76% below the average of 32.8 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.3 kgCO₂e/ft² is about 86% below the group average of 2.1 kgCO₂e/ft².

At 223,905 sq ft, it is roughly in line with the average floor area of 238,274 sq ft for those buildings. It was built in 2013, 24 years later than the group's average year built (1990). Across all 24 jurisdictions BuildingCensus covers, the 1,071 parking buildings average an ENERGY STAR score of 67 and a site EUI of 40.3 kBtu/ft².

How has Mb Hospital Parking's energy performance changed over time?

BuildingCensus holds 5 California disclosures for Mb Hospital Parking, covering report years 2018, 2019, 2020, 2022, 2023. Site EUI moved from 5.2 kBtu/ft² (2018) to 7.9 kBtu/ft² (2023), an 52% increase. Reported emissions went from 82 tCO₂e to 66 tCO₂e over the same span (down 20%).

What does a site EUI of 7.9 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Mb Hospital Parking's 7.9 kBtu/ft² across 223,905 sq ft works out to about 1.8 billion Btu (518 MWh-equivalent) in 2023. The disclosure also reports 270,952 kWh of electricity for the year.

Which law requires Mb Hospital Parking to report its energy use?

Mb Hospital Parking reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2023 disclosure (source record california:6863796:2023). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

More parking buildings in California

Frequently asked questions

What is Mb Hospital Parking's energy grade?

Mb Hospital Parking did not report an ENERGY STAR score in its 2023 disclosure, but its site energy-use intensity was 7.9 kBtu/ft².

How much energy does Mb Hospital Parking use?

Its 2023 site energy-use intensity was 7.9 kBtu/ft² across 223,905 sq ft, including 270,952 kWh of electricity.

What are Mb Hospital Parking's carbon emissions?

Mb Hospital Parking reported 66 tCO₂e of greenhouse-gas emissions (0.3 kgCO₂e/ft²) for 2023.

Where is Mb Hospital Parking?

Mb Hospital Parking is at 1835 Owens St, San Francisco, in San Francisco, California 94158. Its coordinates are 37.76597, -122.39212 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.

How big is Mb Hospital Parking and when was it built?

Mb Hospital Parking has 223,905 sq ft of gross floor area, as reported in its 2023 disclosure. The disclosure lists 2013 as its year built. It is classed as parking.

Is Mb Hospital Parking covered by AB 802 (Public Resources Code §25402.10)?

Yes — it appears in the 2023 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).

Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Mb Hospital Parking, San Francisco, California — 2023 benchmarking disclosure”, https://buildingcensus.com/buildings/california/mb-hospital-parking-814836ab (data as of July 9, 2026).