BuildingCensus
–

Pfizer Cb10

Laboratory in California, CA · 10555 Science Center Drive, San Diego · 92121

At a glance

Pfizer Cb10 is a 127,506-square-foot laboratory building at 10555 Science Center Drive, San Diego in San Diego, California, built in 1998. In its 2024 California benchmarking disclosure it reported a site energy-use intensity of 82.0 kBtu/ft² and 608 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2024
Site EUI
82.0
kBtu/ft²
GHG emissions
608
tCO₂e
GHG intensity
4.8
kgCO₂e/ft²
Floor area
127,506
sq ft
Year built
1998
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

AB 802 (Public Resources Code §25402.10) · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI82.0 kBtu/ft²
Source EUI—
GHG emissions608 tCO₂e
GHG intensity4.8 kgCO₂e/ft²
Electricity1,160,397 kWh
Gross floor area127,506 sq ft
Source recordcalifornia:10906569:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest—82.0 kBtu/ft²608 tCO₂e
2022—165.1 kBtu/ft²1,285 tCO₂e
2019—114.9 kBtu/ft²895 tCO₂e

Compliance context

AB 802 (Public Resources Code §25402.10)

AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
10555 Science Center Drive, San Diego
State
California
ZIP
92121
Coordinates
32.89621, -117.22949

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in California · biggest emitters

How does Pfizer Cb10 compare with other laboratory buildings in California?

The latest disclosures cover 308 laboratory buildings in California, out of 40,029 buildings citywide. Its site EUI of 82.0 kBtu/ft² is about half of the average of 181.8 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 4.8 kgCO₂e/ft² is about 57% below the group average of 11.1 kgCO₂e/ft².

At 127,506 sq ft, it is roughly in line with the average floor area of 121,485 sq ft for those buildings. It was built in 1998, 6 years later than the group's average year built (1992). Across all 24 jurisdictions BuildingCensus covers, the 795 laboratory buildings average an ENERGY STAR score of 29 and a site EUI of 231.7 kBtu/ft².

How has Pfizer Cb10's energy performance changed over time?

BuildingCensus holds 3 California disclosures for Pfizer Cb10, covering report years 2019, 2022, 2024. Site EUI moved from 114.9 kBtu/ft² (2019) to 82.0 kBtu/ft² (2024), a 29% decrease. Reported emissions went from 895 tCO₂e to 608 tCO₂e over the same span (down 32%).

What does a site EUI of 82.0 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Pfizer Cb10's 82.0 kBtu/ft² across 127,506 sq ft works out to about 10.5 billion Btu (3,064 MWh-equivalent) in 2024. The disclosure also reports 1,160,397 kWh of electricity for the year.

Which law requires Pfizer Cb10 to report its energy use?

Pfizer Cb10 reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:10906569:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

More laboratory buildings in California

Frequently asked questions

What is Pfizer Cb10's energy grade?

Pfizer Cb10 did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 82.0 kBtu/ft².

How much energy does Pfizer Cb10 use?

Its 2024 site energy-use intensity was 82.0 kBtu/ft² across 127,506 sq ft, including 1,160,397 kWh of electricity.

What are Pfizer Cb10's carbon emissions?

Pfizer Cb10 reported 608 tCO₂e of greenhouse-gas emissions (4.8 kgCO₂e/ft²) for 2024.

Where is Pfizer Cb10?

Pfizer Cb10 is at 10555 Science Center Drive, San Diego, in San Diego, California 92121. Its coordinates are 32.89621, -117.22949 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.

How big is Pfizer Cb10 and when was it built?

Pfizer Cb10 has 127,506 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1998 as its year built. It is classed as laboratory.

Is Pfizer Cb10 covered by AB 802 (Public Resources Code §25402.10)?

Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).

Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Pfizer Cb10, San Diego, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/pfizer-cb10-bd5dc6e8 (data as of July 9, 2026).