BuildingCensus
–

Police Building - Fremont

Police Station in California, CA · 2000 Stevenson Blvd., Fremont · 94537

At a glance

Police Building - Fremont is a 84,355-square-foot police station at 2000 Stevenson Blvd., Fremont in Fremont, California, built in 1996. In its 2022 California benchmarking disclosure it reported a site energy-use intensity of 89.9 kBtu/ft² and 452 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2022
Site EUI
89.9
kBtu/ft²
GHG emissions
452
tCO₂e
GHG intensity
5.4
kgCO₂e/ft²
Floor area
84,355
sq ft
Year built
1996
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

AB 802 (Public Resources Code §25402.10) · reporting year 2022

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI89.9 kBtu/ft²
Source EUI—
GHG emissions452 tCO₂e
GHG intensity5.4 kgCO₂e/ft²
Electricity732,709 kWh
Natural gas52,815 therms
Gross floor area84,355 sq ft
Source recordcalifornia:27291619:2022

Compliance context

AB 802 (Public Resources Code §25402.10)

AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
2000 Stevenson Blvd., Fremont
State
California
ZIP
94537
Coordinates
37.55277, -121.96909

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in California · biggest emitters

How does Police Building - Fremont compare with other police station buildings in California?

The latest disclosures cover 68 police station buildings in California, out of 40,029 buildings citywide. Its site EUI of 89.9 kBtu/ft² is about 10% above the average of 81.5 kBtu/ft² — it uses more energy per square foot than the typical building in that group. Its emissions intensity of 5.4 kgCO₂e/ft² is roughly in line with the group average of 5.2 kgCO₂e/ft².

At 84,355 sq ft, it is roughly in line with the average floor area of 82,281 sq ft for those buildings. It was built in 1996, 8 years later than the group's average year built (1989).

What does a site EUI of 89.9 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Police Building - Fremont's 89.9 kBtu/ft² across 84,355 sq ft works out to about 7.6 billion Btu (2,223 MWh-equivalent) in 2022. The disclosure also reports 732,709 kWh of electricity and 52,815 therms of natural gas for the year.

Which law requires Police Building - Fremont to report its energy use?

Police Building - Fremont reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2022 disclosure (source record california:27291619:2022). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

More police station buildings in California

Frequently asked questions

What is Police Building - Fremont's energy grade?

Police Building - Fremont did not report an ENERGY STAR score in its 2022 disclosure, but its site energy-use intensity was 89.9 kBtu/ft².

How much energy does Police Building - Fremont use?

Its 2022 site energy-use intensity was 89.9 kBtu/ft² across 84,355 sq ft, including 732,709 kWh of electricity and 52,815 therms of natural gas.

What are Police Building - Fremont's carbon emissions?

Police Building - Fremont reported 452 tCO₂e of greenhouse-gas emissions (5.4 kgCO₂e/ft²) for 2022.

Where is Police Building - Fremont?

Police Building - Fremont is at 2000 Stevenson Blvd., Fremont, in Fremont, California 94537. Its coordinates are 37.55277, -121.96909 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.

How big is Police Building - Fremont and when was it built?

Police Building - Fremont has 84,355 sq ft of gross floor area, as reported in its 2022 disclosure. The disclosure lists 1996 as its year built. It is classed as police station.

Is Police Building - Fremont covered by AB 802 (Public Resources Code §25402.10)?

Yes — it appears in the 2022 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).

Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Police Building - Fremont, Fremont, California — 2022 benchmarking disclosure”, https://buildingcensus.com/buildings/california/police-building-fremont-160cb860 (data as of July 9, 2026).