Ted Pella, Inc. Insight
Non-Refrigerated Warehouse in California, CA · 1679 Insight Place, Redding · 96003
At a glance
Ted Pella, Inc. Insight is a 59,300-square-foot non-refrigerated warehouse at 1679 Insight Place, Redding in Redding, California, built in 2003. In its 2024 California benchmarking disclosure it reported an ENERGY STAR score of 69 out of 100 (grade C), a site energy-use intensity of 28.6 kBtu/ft² and 103 tCO₂e of greenhouse-gas emissions. That score is higher than 38% of the 2,227 scored non-refrigerated warehouse buildings in California.
AB 802 (Public Resources Code §25402.10) · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | 69 (band C) |
| Site EUI | 28.6 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 103 tCO₂e |
| GHG intensity | 1.7 kgCO₂e/ft² |
| Electricity | 82,448 kWh |
| Natural gas | 5,607 therms |
| Gross floor area | 59,300 sq ft |
| Source record | california:33619352:2024 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2024latest | 69 | 28.6 kBtu/ft² | 103 tCO₂e | |
| 2023 | — | 33.8 kBtu/ft² | 114 tCO₂e |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 1679 Insight Place, Redding
- City
- California
- State
- California
- ZIP
- 96003
- Coordinates
- 40.63348, -122.38607
Within ~1 km
Nearby benchmarked buildings
- Seco Manufacturingscore —
Manufacturing/Industrial Plant · 81,565 sq ft
See also: most efficient in California · biggest emitters
How does Ted Pella, Inc. Insight compare with other non-refrigerated warehouse buildings in California?
The latest disclosures cover 2,867 non-refrigerated warehouse buildings in California, out of 40,029 buildings citywide. Ted Pella, Inc. Insight's ENERGY STAR score of 69 compares with an average of 68 across the 2,227 that report a score; it scores higher than 38% of them and lower than 61%. Its site EUI of 28.6 kBtu/ft² is about 32% above the average of 21.7 kBtu/ft² — it uses more energy per square foot than the typical building in that group. Its emissions intensity of 1.7 kgCO₂e/ft² is about 24% above the group average of 1.4 kgCO₂e/ft².
At 59,300 sq ft, it is about 66% below the average floor area of 173,929 sq ft for those buildings. It was built in 2003, 15 years later than the group's average year built (1988). Across all 24 jurisdictions BuildingCensus covers, the 4,723 non-refrigerated warehouse buildings average an ENERGY STAR score of 66 and a site EUI of 26.0 kBtu/ft².
How has Ted Pella, Inc. Insight's energy performance changed over time?
BuildingCensus holds 2 California disclosures for Ted Pella, Inc. Insight, covering report years 2023–2024. Site EUI moved from 33.8 kBtu/ft² (2023) to 28.6 kBtu/ft² (2024), a 15% decrease. Reported emissions went from 114 tCO₂e to 103 tCO₂e over the same span (down 10%).
What does an ENERGY STAR score of 69 mean?
ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 69 means the building performs better than about 69% of its national peers. BuildingCensus bands the score into report-card grades; 69 falls in band C — below median (55–69). It sits 6 points below 75, the threshold for ENERGY STAR certification. In California, 65% of scored buildings are at 75 or above.
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Ted Pella, Inc. Insight's 28.6 kBtu/ft² across 59,300 sq ft works out to about 1.7 billion Btu (497 MWh-equivalent) in 2024. The disclosure also reports 82,448 kWh of electricity and 5,607 therms of natural gas for the year.
Which law requires Ted Pella, Inc. Insight to report its energy use?
Ted Pella, Inc. Insight reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:33619352:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More non-refrigerated warehouse buildings in California
- 2880 N Ontario St, Burbank, Ca 91504, Usa· 59,291 sq ft · score 1 (D)
- Lift - Del Amo· 59,286 sq ft · score 97 (A)
- 2301 Raymer· 58,981 sq ft · EUI 4.5 kBtu/ft²
- Gentry Watts No. 2· 58,968 sq ft · score 77 (B)
- Gentry Watts No. 2· 58,968 sq ft · score 78 (B)
- Chino Industrial Bldg 1· 58,964 sq ft · score 74 (B)
- Non-Refrigerated Warehouse buildings in California· 2,867 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is Ted Pella, Inc. Insight's energy grade?
Ted Pella, Inc. Insight scores 69 out of 100 on ENERGY STAR — band C, below median (55–69) — in its 2024 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.
How much energy does Ted Pella, Inc. Insight use?
Its 2024 site energy-use intensity was 28.6 kBtu/ft² across 59,300 sq ft, including 82,448 kWh of electricity and 5,607 therms of natural gas.
What are Ted Pella, Inc. Insight's carbon emissions?
Ted Pella, Inc. Insight reported 103 tCO₂e of greenhouse-gas emissions (1.7 kgCO₂e/ft²) for 2024.
Where is Ted Pella, Inc. Insight?
Ted Pella, Inc. Insight is at 1679 Insight Place, Redding, in Redding, California 96003. Its coordinates are 40.63348, -122.38607 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is Ted Pella, Inc. Insight and when was it built?
Ted Pella, Inc. Insight has 59,300 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 2003 as its year built. It is classed as non-refrigerated warehouse.
Is Ted Pella, Inc. Insight covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Ted Pella, Inc. Insight, Redding, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/ted-pella-inc-insight-a4680198 (data as of July 9, 2026).