Ups Menlo Park Camen
Distribution Center in California, CA · 1355 Adams Drive, Menlo Park · 94025
At a glance
Ups Menlo Park Camen is a 152,067-square-foot distribution center at 1355 Adams Drive, Menlo Park in Menlo Park, California, built in 1958. In its 2024 California benchmarking disclosure it reported an ENERGY STAR score of 96 out of 100 (grade A), a site energy-use intensity of 7.5 kBtu/ft² and 58 tCO₂e of greenhouse-gas emissions. That score is higher than 81% of the 2,485 scored distribution center buildings in California.
AB 802 (Public Resources Code §25402.10) · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | 96 (band A) |
| Site EUI | 7.5 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 58 tCO₂e |
| GHG intensity | 0.4 kgCO₂e/ft² |
| Electricity | 85,854 kWh |
| Natural gas | 7,223 therms |
| Gross floor area | 152,067 sq ft |
| Source record | california:17250414:2024 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2024latest | 96 | +6 | 7.5 kBtu/ft² | 58 tCO₂e |
| 2023 | 90 | +5 | 11.3 kBtu/ft² | 106 tCO₂e |
| 2022 | 85 | -4 | 14.0 kBtu/ft² | 128 tCO₂e |
| 2021 | 89 | ±0 | 11.7 kBtu/ft² | 99 tCO₂e |
| 2020 | 89 | 11.3 kBtu/ft² | 92 tCO₂e |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 1355 Adams Drive, Menlo Park
- City
- California
- State
- California
- ZIP
- 94025
- Coordinates
- 37.47750, -122.14289
Within ~1 km
Nearby benchmarked buildings
See also: most efficient in California · biggest emitters
How does Ups Menlo Park Camen compare with other distribution center buildings in California?
The latest disclosures cover 3,121 distribution center buildings in California, out of 40,029 buildings citywide. Ups Menlo Park Camen's ENERGY STAR score of 96 compares with an average of 67 across the 2,485 that report a score; it scores higher than 81% of them and lower than 16%. Its site EUI of 7.5 kBtu/ft² is about 62% below the average of 19.8 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.4 kgCO₂e/ft² is about 71% below the group average of 1.3 kgCO₂e/ft².
At 152,067 sq ft, it is about 36% below the average floor area of 238,298 sq ft for those buildings. It was built in 1958, 36 years earlier than the group's average year built (1994). Across all 24 jurisdictions BuildingCensus covers, the 4,082 distribution center buildings average an ENERGY STAR score of 65 and a site EUI of 24.2 kBtu/ft².
How has Ups Menlo Park Camen's energy performance changed over time?
BuildingCensus holds 5 California disclosures for Ups Menlo Park Camen, covering report years 2020–2024. Its ENERGY STAR score went from 89 in 2020 to 96 in 2024 (+7 points). Site EUI moved from 11.3 kBtu/ft² (2020) to 7.5 kBtu/ft² (2024), a 34% decrease. Reported emissions went from 92 tCO₂e to 58 tCO₂e over the same span (down 37%).
What does an ENERGY STAR score of 96 mean?
ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 96 means the building performs better than about 96% of its national peers. BuildingCensus bands the score into report-card grades; 96 falls in band A — high performer (85–100). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In California, 65% of scored buildings are at 75 or above.
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Ups Menlo Park Camen's 7.5 kBtu/ft² across 152,067 sq ft works out to about 1.1 billion Btu (334 MWh-equivalent) in 2024. The disclosure also reports 85,854 kWh of electricity and 7,223 therms of natural gas for the year.
Which law requires Ups Menlo Park Camen to report its energy use?
Ups Menlo Park Camen reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:17250414:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More distribution center buildings in California
- 3395 E. North Ave.· 151,200 sq ft · score 89 (A)
- 1204 North Miller St. (Anaheim Concourse Ph I)· 151,181 sq ft · score 77 (B)
- 1202 North Miller St. (Anaheim Concourse Ph I)· 151,181 sq ft · score 76 (B)
- Sba03206 - North San Jose 20· 150,808 sq ft · score 44 (D)
- 411 Garnet Ave, Palm Springs, Ca 92262, Usa· 150,560 sq ft · score 52 (D)
- Glp Mid-Counties Logistics Center· 150,548 sq ft · EUI 1.3 kBtu/ft²
- Distribution Center buildings in California· 3,121 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is Ups Menlo Park Camen's energy grade?
Ups Menlo Park Camen scores 96 out of 100 on ENERGY STAR — band A, high performer (85–100) — in its 2024 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.
How much energy does Ups Menlo Park Camen use?
Its 2024 site energy-use intensity was 7.5 kBtu/ft² across 152,067 sq ft, including 85,854 kWh of electricity and 7,223 therms of natural gas.
What are Ups Menlo Park Camen's carbon emissions?
Ups Menlo Park Camen reported 58 tCO₂e of greenhouse-gas emissions (0.4 kgCO₂e/ft²) for 2024.
Where is Ups Menlo Park Camen?
Ups Menlo Park Camen is at 1355 Adams Drive, Menlo Park, in Menlo Park, California 94025. Its coordinates are 37.47750, -122.14289 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is Ups Menlo Park Camen and when was it built?
Ups Menlo Park Camen has 152,067 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1958 as its year built. It is classed as distribution center.
Is Ups Menlo Park Camen covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Ups Menlo Park Camen, Menlo Park, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/ups-menlo-park-camen-f21a9435 (data as of July 9, 2026).