BuildingCensus
A

Ups Menlo Park Camen

Distribution Center in California, CA · 1355 Adams Drive, Menlo Park · 94025

At a glance

Ups Menlo Park Camen is a 152,067-square-foot distribution center at 1355 Adams Drive, Menlo Park in Menlo Park, California, built in 1958. In its 2024 California benchmarking disclosure it reported an ENERGY STAR score of 96 out of 100 (grade A), a site energy-use intensity of 7.5 kBtu/ft² and 58 tCO₂e of greenhouse-gas emissions. That score is higher than 81% of the 2,485 scored distribution center buildings in California.

ENERGY STAR score
96
band A · 2024
Site EUI
7.5
kBtu/ft²
GHG emissions
58
tCO₂e
GHG intensity
0.4
kgCO₂e/ft²
Floor area
152,067
sq ft
Year built
1958
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

AB 802 (Public Resources Code §25402.10) · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score96 (band A)
Site EUI7.5 kBtu/ft²
Source EUI—
GHG emissions58 tCO₂e
GHG intensity0.4 kgCO₂e/ft²
Electricity85,854 kWh
Natural gas7,223 therms
Gross floor area152,067 sq ft
Source recordcalifornia:17250414:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest96+67.5 kBtu/ft²58 tCO₂e
202390+511.3 kBtu/ft²106 tCO₂e
202285-414.0 kBtu/ft²128 tCO₂e
202189±011.7 kBtu/ft²99 tCO₂e
20208911.3 kBtu/ft²92 tCO₂e

Compliance context

AB 802 (Public Resources Code §25402.10)

AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
1355 Adams Drive, Menlo Park
State
California
ZIP
94025
Coordinates
37.47750, -122.14289

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in California · biggest emitters

How does Ups Menlo Park Camen compare with other distribution center buildings in California?

The latest disclosures cover 3,121 distribution center buildings in California, out of 40,029 buildings citywide. Ups Menlo Park Camen's ENERGY STAR score of 96 compares with an average of 67 across the 2,485 that report a score; it scores higher than 81% of them and lower than 16%. Its site EUI of 7.5 kBtu/ft² is about 62% below the average of 19.8 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.4 kgCO₂e/ft² is about 71% below the group average of 1.3 kgCO₂e/ft².

At 152,067 sq ft, it is about 36% below the average floor area of 238,298 sq ft for those buildings. It was built in 1958, 36 years earlier than the group's average year built (1994). Across all 24 jurisdictions BuildingCensus covers, the 4,082 distribution center buildings average an ENERGY STAR score of 65 and a site EUI of 24.2 kBtu/ft².

How has Ups Menlo Park Camen's energy performance changed over time?

BuildingCensus holds 5 California disclosures for Ups Menlo Park Camen, covering report years 2020–2024. Its ENERGY STAR score went from 89 in 2020 to 96 in 2024 (+7 points). Site EUI moved from 11.3 kBtu/ft² (2020) to 7.5 kBtu/ft² (2024), a 34% decrease. Reported emissions went from 92 tCO₂e to 58 tCO₂e over the same span (down 37%).

What does an ENERGY STAR score of 96 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 96 means the building performs better than about 96% of its national peers. BuildingCensus bands the score into report-card grades; 96 falls in band A — high performer (85–100). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In California, 65% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Ups Menlo Park Camen's 7.5 kBtu/ft² across 152,067 sq ft works out to about 1.1 billion Btu (334 MWh-equivalent) in 2024. The disclosure also reports 85,854 kWh of electricity and 7,223 therms of natural gas for the year.

Which law requires Ups Menlo Park Camen to report its energy use?

Ups Menlo Park Camen reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:17250414:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

More distribution center buildings in California

Frequently asked questions

What is Ups Menlo Park Camen's energy grade?

Ups Menlo Park Camen scores 96 out of 100 on ENERGY STAR — band A, high performer (85–100) — in its 2024 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does Ups Menlo Park Camen use?

Its 2024 site energy-use intensity was 7.5 kBtu/ft² across 152,067 sq ft, including 85,854 kWh of electricity and 7,223 therms of natural gas.

What are Ups Menlo Park Camen's carbon emissions?

Ups Menlo Park Camen reported 58 tCO₂e of greenhouse-gas emissions (0.4 kgCO₂e/ft²) for 2024.

Where is Ups Menlo Park Camen?

Ups Menlo Park Camen is at 1355 Adams Drive, Menlo Park, in Menlo Park, California 94025. Its coordinates are 37.47750, -122.14289 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.

How big is Ups Menlo Park Camen and when was it built?

Ups Menlo Park Camen has 152,067 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1958 as its year built. It is classed as distribution center.

Is Ups Menlo Park Camen covered by AB 802 (Public Resources Code §25402.10)?

Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).

Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Ups Menlo Park Camen, Menlo Park, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/ups-menlo-park-camen-f21a9435 (data as of July 9, 2026).