BuildingCensus
C

100 Memorial Dr

Multifamily Housing in Cambridge, MA

At a glance

100 Memorial Dr is a 280,000-square-foot multifamily housing building in Cambridge, Massachusetts, built in 1951. In its 2024 Cambridge benchmarking disclosure it reported an ENERGY STAR score of 66 out of 100 (grade C), a site energy-use intensity of 84.3 kBtu/ft² and 1,319 tCO₂e of greenhouse-gas emissions. That score is higher than 30% of the 155 scored multifamily housing buildings in Cambridge.

ENERGY STAR score
66
band C · 2024
Site EUI
84.3
kBtu/ft²
GHG emissions
1,319
tCO₂e
GHG intensity
—
kgCO₂e/ft²
Floor area
280,000
sq ft
Year built
1951
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

BEUDO · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score66 (band C)
Site EUI84.3 kBtu/ft²
Source EUI109.8 kBtu/ft²
GHG emissions1,319 tCO₂e
GHG intensity—
Electricity995,372 kWh
Natural gas202,110 therms
Water use7,783 kgal
Gross floor area280,000 sq ft
Source recordcambridge:B1132:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest66-484.3 kBtu/ft²1,319 tCO₂e
202370+4579.0 kBtu/ft²1,242 tCO₂e
202225-4697.1 kBtu/ft²1,583 tCO₂e
202171-681.5 kBtu/ft²1,279 tCO₂e
202077-2378.0 kBtu/ft²1,661 tCO₂e
2019100+956.0 kBtu/ft²1,212 tCO₂e
20185-9236.3 kBtu/ft²1,355 tCO₂e
201714-27200.9 kBtu/ft²1,178 tCO₂e
201641+9195.3 kBtu/ft²1,099 tCO₂e
201532210.2 kBtu/ft²1,184 tCO₂e

Compliance context

BEUDO

Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).

Program details →

Ownership

NEW ENGLAND MUTUAL LIFE

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
100 Memorial Dr
State
Massachusetts
Coordinates
42.36020, -71.08560

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Cambridge · biggest emitters

How does 100 Memorial Dr compare with other multifamily housing buildings in Cambridge?

The latest disclosures cover 187 multifamily housing buildings in Cambridge, out of 902 buildings citywide. 100 Memorial Dr's ENERGY STAR score of 66 compares with an average of 75 across the 155 that report a score; it scores higher than 30% of them and lower than 70%. Its site EUI of 84.3 kBtu/ft² is about 48% above the average of 56.9 kBtu/ft² — it uses more energy per square foot than the typical building in that group.

At 280,000 sq ft, it is about twice the average floor area of 132,415 sq ft for those buildings. It was built in 1951, 22 years earlier than the group's average year built (1973). Across all 24 jurisdictions BuildingCensus covers, the 59,945 multifamily housing buildings average an ENERGY STAR score of 70 and a site EUI of 59.0 kBtu/ft².

How has 100 Memorial Dr's energy performance changed over time?

BuildingCensus holds 10 Cambridge disclosures for 100 Memorial Dr, covering report years 2015–2024. Its ENERGY STAR score went from 32 in 2015 to 66 in 2024 (+34 points); its best year on file was 2019, at 100. Site EUI moved from 210.2 kBtu/ft² (2015) to 84.3 kBtu/ft² (2024), a 60% decrease. Reported emissions went from 1,184 tCO₂e to 1,319 tCO₂e over the same span (up 11%).

What does an ENERGY STAR score of 66 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 66 means the building performs better than about 66% of its national peers. BuildingCensus bands the score into report-card grades; 66 falls in band C — below median (55–69). It sits 9 points below 75, the threshold for ENERGY STAR certification. In Cambridge, 50% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. 100 Memorial Dr's 84.3 kBtu/ft² across 280,000 sq ft works out to about 23.6 billion Btu (6,918 MWh-equivalent) in 2024. Its source EUI of 109.8 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 995,372 kWh of electricity, 202,110 therms of natural gas and 7,783 thousand gallons of water for the year.

Which law requires 100 Memorial Dr to report its energy use?

100 Memorial Dr reports under BEUDO, the legal basis of Cambridge's Building Energy Use Disclosure Ordinance (BEUDO), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record cambridge:B1132:2024). Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).

More multifamily housing buildings in Cambridge

Frequently asked questions

What is 100 Memorial Dr's energy grade?

100 Memorial Dr scores 66 out of 100 on ENERGY STAR — band C, below median (55–69) — in its 2024 Cambridge disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does 100 Memorial Dr use?

Its 2024 site energy-use intensity was 84.3 kBtu/ft² (109.8 kBtu/ft² source) across 280,000 sq ft, including 995,372 kWh of electricity and 202,110 therms of natural gas.

What are 100 Memorial Dr's carbon emissions?

100 Memorial Dr reported 1,319 tCO₂e of greenhouse-gas emissions for 2024.

Where is 100 Memorial Dr?

100 Memorial Dr is in Cambridge, Massachusetts. Its coordinates are 42.36020, -71.08560 (latitude, longitude), as published in the Building Energy Use Disclosure Ordinance (BEUDO) file.

How big is 100 Memorial Dr and when was it built?

100 Memorial Dr has 280,000 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1951 as its year built. It is classed as multifamily housing.

Is 100 Memorial Dr covered by BEUDO?

Yes — it appears in the 2024 Building Energy Use Disclosure Ordinance (BEUDO) disclosure, which lists the buildings reporting under BEUDO.

Working with Cambridge building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Use Disclosure Ordinance (BEUDO) (BEUDO), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “100 Memorial Dr, Cambridge, Massachusetts — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/cambridge/100-memorial-dr-ef1dd538 (data as of October 2, 2026).