32 VASSAR ST is a 464,005-square-foot college/university building in Cambridge, Massachusetts, built in 2004. In its 2024 Cambridge benchmarking disclosure it reported a site energy-use intensity of 152.7 kBtu/ft² and 4,730 tCO₂e of greenhouse-gas emissions.
BEUDO · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 152.7 kBtu/ft² |
| Source EUI | 274.1 kBtu/ft² |
| GHG emissions | 4,730 tCO₂e |
| GHG intensity | — |
| Electricity | 8,522,030 kWh |
| Natural gas | 6,326 therms |
| Water use | 8,731 kgal |
| Gross floor area | 464,005 sq ft |
| Source record | cambridge:B1476:2024 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2024latest | — | 152.7 kBtu/ft² | 4,730 tCO₂e | |
| 2023 | — | 140.0 kBtu/ft² | 4,339 tCO₂e | |
| 2022 | — | 153.0 kBtu/ft² | 4,685 tCO₂e | |
| 2021 | — | 189.5 kBtu/ft² | 5,713 tCO₂e | |
| 2020 | — | 178.9 kBtu/ft² | 5,353 tCO₂e | |
| 2019 | — | — | 3,024 tCO₂e | |
| 2018 | — | 164.2 kBtu/ft² | 4,874 tCO₂e | |
| 2017 | — | 168.4 kBtu/ft² | 5,155 tCO₂e | |
| 2016 | — | 170.2 kBtu/ft² | 5,198 tCO₂e | |
| 2015 | — | 187.1 kBtu/ft² | 5,778 tCO₂e |
Compliance context
BEUDO
Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).
Ownership
MASSACHUSETTS INSTITUTE OF TECHNOLOGY
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 32 VASSAR ST
- City
- Cambridge
- State
- Massachusetts
- Coordinates
- 42.36160, -71.09060
Within ~1 km
Nearby benchmarked buildings
- 250 Massachusetts Avenuescore —
Laboratory · 1,362,662 sq ft
- 250 Massachusetts Avenuescore —
Laboratory · 517,029 sq ft
- 325 Main Stscore 87
Office · 494,512 sq ft
- 145 Broadwayscore 91
Office · 490,000 sq ft
- 314 Main St.score 80
Office · 482,220 sq ft
- 303 Binney Stscore —
Laboratory · 480,000 sq ft
See also: most efficient in Cambridge · biggest emitters
How does 32 VASSAR ST compare with other college/university buildings in Cambridge?
The latest disclosures cover 203 college/university buildings in Cambridge, out of 902 buildings citywide. Its site EUI of 152.7 kBtu/ft² is roughly in line with the average of 154.3 kBtu/ft² — it uses less energy per square foot than the typical building in that group.
At 464,005 sq ft, it is about 379% above the average floor area of 96,964 sq ft for those buildings. It was built in 2004, 55 years later than the group's average year built (1949). Across all 24 jurisdictions BuildingCensus covers, the 2,113 college/university buildings average an ENERGY STAR score of 68 and a site EUI of 98.7 kBtu/ft².
How has 32 VASSAR ST's energy performance changed over time?
BuildingCensus holds 10 Cambridge disclosures for 32 VASSAR ST, covering report years 2015–2024. Site EUI moved from 187.1 kBtu/ft² (2015) to 152.7 kBtu/ft² (2024), a 18% decrease. Reported emissions went from 5,778 tCO₂e to 4,730 tCO₂e over the same span (down 18%).
What does a site EUI of 152.7 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. 32 VASSAR ST's 152.7 kBtu/ft² across 464,005 sq ft works out to about 70.9 billion Btu (20,765 MWh-equivalent) in 2024. Its source EUI of 274.1 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 8,522,030 kWh of electricity, 6,326 therms of natural gas and 8,731 thousand gallons of water for the year.
Which law requires 32 VASSAR ST to report its energy use?
32 VASSAR ST reports under BEUDO, the legal basis of Cambridge's Building Energy Use Disclosure Ordinance (BEUDO), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record cambridge:B1476:2024). Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).
More college/university buildings in Cambridge
- 43 VASSAR ST· 418,663 sq ft · EUI 400.3 kBtu/ft²
- 100 MAIN ST· 405,034 sq ft · EUI 22.6 kBtu/ft²
- 500 MAIN ST· 367,689 sq ft · EUI 393.1 kBtu/ft²
- 70 PACIFIC ST· 362,687 sq ft · EUI 67.0 kBtu/ft²
- 1 Oxford St· 355,836 sq ft · EUI 127.1 kBtu/ft²
- 1545 Massachusetts Avenue· 281,097 sq ft · EUI 87.2 kBtu/ft²
- College/University buildings in Cambridge· 203 benchmarked
- All Cambridge benchmarked buildings· BEUDO
- Most efficient large buildings in Cambridge
- Least efficient large buildings in Cambridge
- Biggest emitters in Cambridge
Frequently asked questions
What is 32 VASSAR ST's energy grade?
32 VASSAR ST did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 152.7 kBtu/ft².
How much energy does 32 VASSAR ST use?
Its 2024 site energy-use intensity was 152.7 kBtu/ft² (274.1 kBtu/ft² source) across 464,005 sq ft, including 8,522,030 kWh of electricity and 6,326 therms of natural gas.
What are 32 VASSAR ST's carbon emissions?
32 VASSAR ST reported 4,730 tCO₂e of greenhouse-gas emissions for 2024.
Where is 32 VASSAR ST?
32 VASSAR ST is in Cambridge, Massachusetts. Its coordinates are 42.36160, -71.09060 (latitude, longitude), as published in the Building Energy Use Disclosure Ordinance (BEUDO) file.
How big is 32 VASSAR ST and when was it built?
32 VASSAR ST has 464,005 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 2004 as its year built. It is classed as college/university.
Is 32 VASSAR ST covered by BEUDO?
Yes — it appears in the 2024 Building Energy Use Disclosure Ordinance (BEUDO) disclosure, which lists the buildings reporting under BEUDO.
Working with Cambridge building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Use Disclosure Ordinance (BEUDO) (BEUDO), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “32 VASSAR ST, Cambridge, Massachusetts — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/cambridge/32-vassar-st-a0026cf3 (data as of October 2, 2026).