BuildingCensus

450 MEMORIAL DR

College/University in Cambridge, MA

ENERGY STAR score
not reported · 2024
Site EUI
27.9
kBtu/ft²
GHG emissions
336
tCO₂e
GHG intensity
kgCO₂e/ft²
Floor area
171,141
sq ft
Year built
1970
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

BEUDO · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score
Site EUI27.9 kBtu/ft²
Source EUI63.9 kBtu/ft²
GHG emissions336 tCO₂e
GHG intensity
Electricity950,973 kWh
Water use3,332 kgal
Gross floor area171,141 sq ft
Source recordcambridge:B1400:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest27.9 kBtu/ft²336 tCO₂e
202328.7 kBtu/ft²346 tCO₂e
202238.4 kBtu/ft²455 tCO₂e
202138.4 kBtu/ft²455 tCO₂e
202023.8 kBtu/ft²282 tCO₂e
2019200 tCO₂e
201851.2 kBtu/ft²595 tCO₂e
201774.5 kBtu/ft²878 tCO₂e
201678.1 kBtu/ft²921 tCO₂e
201580.0 kBtu/ft²952 tCO₂e

Compliance context

BEUDO

Cambridge's 2023 BEUDO amendments require large non-residential buildings to cut emissions to net zero by 2035–2050, with compliance obligations starting from 2025 reporting.

Program details →

Ownership

MASSACHUSETTS INSTITUTE OF TECHNOLOGY

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
450 MEMORIAL DR
State
Massachusetts
Coordinates
42.35550, -71.09950

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Cambridge · biggest emitters

Frequently asked questions

What is 450 MEMORIAL DR's energy grade?

450 MEMORIAL DR did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 27.9 kBtu/ft².

How much energy does 450 MEMORIAL DR use?

Its 2024 site energy-use intensity was 27.9 kBtu/ft² (63.9 kBtu/ft² source) across 171,141 sq ft, including 950,973 kWh of electricity.

What are 450 MEMORIAL DR's carbon emissions?

450 MEMORIAL DR reported 336 tCO₂e of greenhouse-gas emissions for 2024. Cambridge's 2023 BEUDO amendments require large non-residential buildings to cut emissions to net zero by 2035–2050, with compliance obligations starting from 2025 reporting.

Dataset updated . Source: Building Energy Use Disclosure Ordinance (BEUDO) disclosure, record cambridge:B1400:2024.