BuildingCensus
–

471-476 MEMORIAL DR

College/University in Cambridge, MA

ENERGY STAR score
—
not reported · 2024
Site EUI
103.4
kBtu/ft²
GHG emissions
808
tCO₂e
GHG intensity
—
kgCO₂e/ft²
Floor area
114,930
sq ft
Year built
1976
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

BEUDO · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI103.4 kBtu/ft²
Source EUI169.6 kBtu/ft²
GHG emissions808 tCO₂e
GHG intensity—
Electricity952,990 kWh
Water use2,672 kgal
Gross floor area114,930 sq ft
Source recordcambridge:B1403:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest—103.4 kBtu/ft²808 tCO₂e
2023—59.3 kBtu/ft²472 tCO₂e
2022—75.3 kBtu/ft²609 tCO₂e
2021—39.1 kBtu/ft²316 tCO₂e
2020—35.0 kBtu/ft²279 tCO₂e
2019—47.1 kBtu/ft²357 tCO₂e
2018—64.5 kBtu/ft²508 tCO₂e
2017—65.3 kBtu/ft²521 tCO₂e
2016—75.9 kBtu/ft²608 tCO₂e
2015—66.6 kBtu/ft²540 tCO₂e

Compliance context

BEUDO

Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).

Program details →

Ownership

MASSACHUSETTS INSTITUTE OF TECHNOLOGY

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
471-476 MEMORIAL DR
State
Massachusetts
Coordinates
42.35520, -71.10050

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Cambridge · biggest emitters

Frequently asked questions

What is 471-476 MEMORIAL DR's energy grade?

471-476 MEMORIAL DR did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 103.4 kBtu/ft².

How much energy does 471-476 MEMORIAL DR use?

Its 2024 site energy-use intensity was 103.4 kBtu/ft² (169.6 kBtu/ft² source) across 114,930 sq ft, including 952,990 kWh of electricity.

What are 471-476 MEMORIAL DR's carbon emissions?

471-476 MEMORIAL DR reported 808 tCO₂e of greenhouse-gas emissions for 2024. Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).

Working with Cambridge building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: Building Energy Use Disclosure Ordinance (BEUDO) disclosure, record cambridge:B1403:2024.