BuildingCensus
C

58 Charles Street

Office in Cambridge, MA

At a glance

58 Charles Street is a 61,114-square-foot office building in Cambridge, Massachusetts, built in 1918. In its 2024 Cambridge benchmarking disclosure it reported an ENERGY STAR score of 69 out of 100 (grade C), a site energy-use intensity of 67.2 kBtu/ft² and 281 tCO₂e of greenhouse-gas emissions. That score is higher than 44% of the 94 scored office buildings in Cambridge.

ENERGY STAR score
69
band C · 2024
Site EUI
67.2
kBtu/ft²
GHG emissions
281
tCO₂e
GHG intensity
—
kgCO₂e/ft²
Floor area
61,114
sq ft
Year built
1918
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

BEUDO · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score69 (band C)
Site EUI67.2 kBtu/ft²
Source EUI164.9 kBtu/ft²
GHG emissions281 tCO₂e
GHG intensity—
Electricity965,564 kWh
Natural gas8,116 therms
Water use179 kgal
Gross floor area61,114 sq ft
Source recordcambridge:B1594:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest69-2767.2 kBtu/ft²281 tCO₂e
202396-434.3 kBtu/ft²139 tCO₂e
2022100±014.6 kBtu/ft²58 tCO₂e
2021100+19.6 kBtu/ft²39 tCO₂e
202099±017.7 kBtu/ft²77 tCO₂e
201999+120.2 kBtu/ft²81 tCO₂e
201898+223.1 kBtu/ft²98 tCO₂e
201796±037.9 kBtu/ft²150 tCO₂e
201696+237.3 kBtu/ft²149 tCO₂e
20159448.2 kBtu/ft²187 tCO₂e

Compliance context

BEUDO

Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).

Program details →

Ownership

BMR-58 CHARLES STREET LLC,

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
58 Charles Street
State
Massachusetts
Coordinates
42.36730, -71.08000

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Cambridge · biggest emitters

How does 58 Charles Street compare with other office buildings in Cambridge?

The latest disclosures cover 117 office buildings in Cambridge, out of 902 buildings citywide. 58 Charles Street's ENERGY STAR score of 69 compares with an average of 64 across the 94 that report a score; it scores higher than 44% of them and lower than 54%. Its site EUI of 67.2 kBtu/ft² is about 15% below the average of 78.7 kBtu/ft² — it uses less energy per square foot than the typical building in that group.

At 61,114 sq ft, it is about half of the average floor area of 121,167 sq ft for those buildings. It was built in 1918, 47 years earlier than the group's average year built (1965). Across all 24 jurisdictions BuildingCensus covers, the 15,264 office buildings average an ENERGY STAR score of 73 and a site EUI of 59.3 kBtu/ft².

How has 58 Charles Street's energy performance changed over time?

BuildingCensus holds 10 Cambridge disclosures for 58 Charles Street, covering report years 2015–2024. Its ENERGY STAR score went from 94 in 2015 to 69 in 2024 (-25 points); its best year on file was 2021, at 100. Site EUI moved from 48.2 kBtu/ft² (2015) to 67.2 kBtu/ft² (2024), an 39% increase. Reported emissions went from 187 tCO₂e to 281 tCO₂e over the same span (up 51%).

What does an ENERGY STAR score of 69 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 69 means the building performs better than about 69% of its national peers. BuildingCensus bands the score into report-card grades; 69 falls in band C — below median (55–69). It sits 6 points below 75, the threshold for ENERGY STAR certification. In Cambridge, 50% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. 58 Charles Street's 67.2 kBtu/ft² across 61,114 sq ft works out to about 4.1 billion Btu (1,204 MWh-equivalent) in 2024. Its source EUI of 164.9 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 965,564 kWh of electricity, 8,116 therms of natural gas and 179 thousand gallons of water for the year.

Which law requires 58 Charles Street to report its energy use?

58 Charles Street reports under BEUDO, the legal basis of Cambridge's Building Energy Use Disclosure Ordinance (BEUDO), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record cambridge:B1594:2024). Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).

More office buildings in Cambridge

Frequently asked questions

What is 58 Charles Street's energy grade?

58 Charles Street scores 69 out of 100 on ENERGY STAR — band C, below median (55–69) — in its 2024 Cambridge disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does 58 Charles Street use?

Its 2024 site energy-use intensity was 67.2 kBtu/ft² (164.9 kBtu/ft² source) across 61,114 sq ft, including 965,564 kWh of electricity and 8,116 therms of natural gas.

What are 58 Charles Street's carbon emissions?

58 Charles Street reported 281 tCO₂e of greenhouse-gas emissions for 2024.

Where is 58 Charles Street?

58 Charles Street is in Cambridge, Massachusetts. Its coordinates are 42.36730, -71.08000 (latitude, longitude), as published in the Building Energy Use Disclosure Ordinance (BEUDO) file.

How big is 58 Charles Street and when was it built?

58 Charles Street has 61,114 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1918 as its year built. It is classed as office.

Is 58 Charles Street covered by BEUDO?

Yes — it appears in the 2024 Building Energy Use Disclosure Ordinance (BEUDO) disclosure, which lists the buildings reporting under BEUDO.

Working with Cambridge building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Use Disclosure Ordinance (BEUDO) (BEUDO), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “58 Charles Street, Cambridge, Massachusetts — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/cambridge/58-charles-street-d9559f8f (data as of October 2, 2026).