BuildingCensus
–

65 Landsdowne Sreet

Laboratory in Cambridge, MA

At a glance

65 Landsdowne Sreet is a 122,410-square-foot laboratory building in Cambridge, Massachusetts, built in 2001. In its 2024 Cambridge benchmarking disclosure it reported a site energy-use intensity of 404.0 kBtu/ft² and 3,046 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2024
Site EUI
404.0
kBtu/ft²
GHG emissions
3,046
tCO₂e
GHG intensity
—
kgCO₂e/ft²
Floor area
122,410
sq ft
Year built
2001
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

BEUDO · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI404.0 kBtu/ft²
Source EUI738.0 kBtu/ft²
GHG emissions3,046 tCO₂e
GHG intensity—
Electricity6,432,570 kWh
Natural gas275,059 therms
Water use4,410 kgal
Gross floor area122,410 sq ft
Source recordcambridge:B1771:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest—404.0 kBtu/ft²3,046 tCO₂e
2023—380.3 kBtu/ft²2,874 tCO₂e
2022—373.1 kBtu/ft²2,816 tCO₂e
2021—367.1 kBtu/ft²2,806 tCO₂e
2020—367.2 kBtu/ft²2,706 tCO₂e
2019—388.7 kBtu/ft²2,776 tCO₂e
2018—441.6 kBtu/ft²3,239 tCO₂e
2017—428.5 kBtu/ft²3,287 tCO₂e
2016—415.1 kBtu/ft²3,192 tCO₂e
2015—386.2 kBtu/ft²3,038 tCO₂e

Compliance context

BEUDO

Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).

Program details →

Ownership

MASSACHUSETTS INSTITUTE OF TECHNOLOGY

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
65 Landsdowne Sreet
State
Massachusetts
Coordinates
42.36060, -71.10080

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Cambridge · biggest emitters

How does 65 Landsdowne Sreet compare with other laboratory buildings in Cambridge?

The latest disclosures cover 88 laboratory buildings in Cambridge, out of 902 buildings citywide. Its site EUI of 404.0 kBtu/ft² is about 48% above the average of 272.6 kBtu/ft² — it uses more energy per square foot than the typical building in that group.

At 122,410 sq ft, it is about 33% below the average floor area of 181,468 sq ft for those buildings. It was built in 2001, 17 years later than the group's average year built (1984). Across all 24 jurisdictions BuildingCensus covers, the 795 laboratory buildings average an ENERGY STAR score of 29 and a site EUI of 231.7 kBtu/ft².

How has 65 Landsdowne Sreet's energy performance changed over time?

BuildingCensus holds 10 Cambridge disclosures for 65 Landsdowne Sreet, covering report years 2015–2024. Site EUI moved from 386.2 kBtu/ft² (2015) to 404.0 kBtu/ft² (2024), an 5% increase. Reported emissions went from 3,038 tCO₂e to 3,046 tCO₂e over the same span (up 0%).

What does a site EUI of 404.0 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. 65 Landsdowne Sreet's 404.0 kBtu/ft² across 122,410 sq ft works out to about 49.5 billion Btu (14,493 MWh-equivalent) in 2024. Its source EUI of 738.0 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 6,432,570 kWh of electricity, 275,059 therms of natural gas and 4,410 thousand gallons of water for the year.

Which law requires 65 Landsdowne Sreet to report its energy use?

65 Landsdowne Sreet reports under BEUDO, the legal basis of Cambridge's Building Energy Use Disclosure Ordinance (BEUDO), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record cambridge:B1771:2024). Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).

More laboratory buildings in Cambridge

Frequently asked questions

What is 65 Landsdowne Sreet's energy grade?

65 Landsdowne Sreet did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 404.0 kBtu/ft².

How much energy does 65 Landsdowne Sreet use?

Its 2024 site energy-use intensity was 404.0 kBtu/ft² (738.0 kBtu/ft² source) across 122,410 sq ft, including 6,432,570 kWh of electricity and 275,059 therms of natural gas.

What are 65 Landsdowne Sreet's carbon emissions?

65 Landsdowne Sreet reported 3,046 tCO₂e of greenhouse-gas emissions for 2024.

Where is 65 Landsdowne Sreet?

65 Landsdowne Sreet is in Cambridge, Massachusetts. Its coordinates are 42.36060, -71.10080 (latitude, longitude), as published in the Building Energy Use Disclosure Ordinance (BEUDO) file.

How big is 65 Landsdowne Sreet and when was it built?

65 Landsdowne Sreet has 122,410 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 2001 as its year built. It is classed as laboratory.

Is 65 Landsdowne Sreet covered by BEUDO?

Yes — it appears in the 2024 Building Energy Use Disclosure Ordinance (BEUDO) disclosure, which lists the buildings reporting under BEUDO.

Working with Cambridge building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Use Disclosure Ordinance (BEUDO) (BEUDO), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “65 Landsdowne Sreet, Cambridge, Massachusetts — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/cambridge/65-landsdowne-sreet-f358bf8a (data as of October 2, 2026).