BuildingCensus
–

70 MEMORIAL DR

College/University in Cambridge, MA

At a glance

70 MEMORIAL DR is a 107,991-square-foot college/university building in Cambridge, Massachusetts, built in 1980. In its 2024 Cambridge benchmarking disclosure it reported a site energy-use intensity of 89.8 kBtu/ft² and 625 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2024
Site EUI
89.8
kBtu/ft²
GHG emissions
625
tCO₂e
GHG intensity
—
kgCO₂e/ft²
Floor area
107,991
sq ft
Year built
1980
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

BEUDO · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI89.8 kBtu/ft²
Source EUI162.7 kBtu/ft²
GHG emissions625 tCO₂e
GHG intensity—
Electricity1,354,856 kWh
Natural gas741 therms
Water use11,685 kgal
Gross floor area107,991 sq ft
Source recordcambridge:B1480:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest—89.8 kBtu/ft²625 tCO₂e
2023——568 tCO₂e
2022—158.2 kBtu/ft²1,116 tCO₂e
2021—166.6 kBtu/ft²1,175 tCO₂e
2020——782 tCO₂e
2019—161.1 kBtu/ft²1,111 tCO₂e
2018—186.6 kBtu/ft²1,300 tCO₂e
2017——1,314 tCO₂e
2016—168.7 kBtu/ft²1,193 tCO₂e
2015—167.4 kBtu/ft²1,196 tCO₂e

Compliance context

BEUDO

Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).

Program details →

Ownership

MASSACHUSETTS INSTITUTE OF TECHNOLOGY

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
70 MEMORIAL DR
State
Massachusetts
Coordinates
42.36050, -71.08450

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Cambridge · biggest emitters

How does 70 MEMORIAL DR compare with other college/university buildings in Cambridge?

The latest disclosures cover 203 college/university buildings in Cambridge, out of 902 buildings citywide. Its site EUI of 89.8 kBtu/ft² is about 42% below the average of 154.3 kBtu/ft² — it uses less energy per square foot than the typical building in that group.

At 107,991 sq ft, it is about 11% above the average floor area of 96,964 sq ft for those buildings. It was built in 1980, 31 years later than the group's average year built (1949). Across all 24 jurisdictions BuildingCensus covers, the 2,113 college/university buildings average an ENERGY STAR score of 68 and a site EUI of 98.7 kBtu/ft².

How has 70 MEMORIAL DR's energy performance changed over time?

BuildingCensus holds 10 Cambridge disclosures for 70 MEMORIAL DR, covering report years 2015–2024. Site EUI moved from 167.4 kBtu/ft² (2015) to 89.8 kBtu/ft² (2024), a 46% decrease. Reported emissions went from 1,196 tCO₂e to 625 tCO₂e over the same span (down 48%).

What does a site EUI of 89.8 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. 70 MEMORIAL DR's 89.8 kBtu/ft² across 107,991 sq ft works out to about 9.7 billion Btu (2,842 MWh-equivalent) in 2024. Its source EUI of 162.7 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 1,354,856 kWh of electricity, 741 therms of natural gas and 11,685 thousand gallons of water for the year.

Which law requires 70 MEMORIAL DR to report its energy use?

70 MEMORIAL DR reports under BEUDO, the legal basis of Cambridge's Building Energy Use Disclosure Ordinance (BEUDO), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record cambridge:B1480:2024). Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).

More college/university buildings in Cambridge

Frequently asked questions

What is 70 MEMORIAL DR's energy grade?

70 MEMORIAL DR did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 89.8 kBtu/ft².

How much energy does 70 MEMORIAL DR use?

Its 2024 site energy-use intensity was 89.8 kBtu/ft² (162.7 kBtu/ft² source) across 107,991 sq ft, including 1,354,856 kWh of electricity and 741 therms of natural gas.

What are 70 MEMORIAL DR's carbon emissions?

70 MEMORIAL DR reported 625 tCO₂e of greenhouse-gas emissions for 2024.

Where is 70 MEMORIAL DR?

70 MEMORIAL DR is in Cambridge, Massachusetts. Its coordinates are 42.36050, -71.08450 (latitude, longitude), as published in the Building Energy Use Disclosure Ordinance (BEUDO) file.

How big is 70 MEMORIAL DR and when was it built?

70 MEMORIAL DR has 107,991 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1980 as its year built. It is classed as college/university.

Is 70 MEMORIAL DR covered by BEUDO?

Yes — it appears in the 2024 Building Energy Use Disclosure Ordinance (BEUDO) disclosure, which lists the buildings reporting under BEUDO.

Working with Cambridge building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Use Disclosure Ordinance (BEUDO) (BEUDO), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “70 MEMORIAL DR, Cambridge, Massachusetts — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/cambridge/70-memorial-dr-a0deb64e (data as of October 2, 2026).