BuildingCensus
C

765 Concord Avenu

K-12 School in Cambridge, MA

At a glance

765 Concord Avenu is a 27,000-square-foot K-12 school in Cambridge, Massachusetts, built in 1961. In its 2024 Cambridge benchmarking disclosure it reported an ENERGY STAR score of 69 out of 100 (grade C), a site energy-use intensity of 98.7 kBtu/ft² and 145 tCO₂e of greenhouse-gas emissions. That score is higher than 53% of the 38 scored K-12 school buildings in Cambridge.

ENERGY STAR score
69
band C · 2024
Site EUI
98.7
kBtu/ft²
GHG emissions
145
tCO₂e
GHG intensity
—
kgCO₂e/ft²
Floor area
27,000
sq ft
Year built
1961
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

BEUDO · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score69 (band C)
Site EUI98.7 kBtu/ft²
Source EUI114.8 kBtu/ft²
GHG emissions145 tCO₂e
GHG intensity—
Electricity50,697 kWh
Natural gas24,911 therms
Water use305 kgal
Gross floor area27,000 sq ft
Source recordcambridge:B1551:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest69+298.7 kBtu/ft²145 tCO₂e
202367+4100.1 kBtu/ft²147 tCO₂e
202263-12107.9 kBtu/ft²158 tCO₂e
202175-1592.6 kBtu/ft²136 tCO₂e
202090+3267.8 kBtu/ft²101 tCO₂e
201958+14113.9 kBtu/ft²166 tCO₂e
201844+5112.2 kBtu/ft²171 tCO₂e
201739+7114.3 kBtu/ft²177 tCO₂e
201632-8121.6 kBtu/ft²189 tCO₂e
201540115.7 kBtu/ft²181 tCO₂e

Compliance context

BEUDO

Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).

Program details →

Ownership

THE FAYERWEATHER STREET SCHOOL

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
765 Concord Avenu
State
Massachusetts
Coordinates
42.39140, -71.15420

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Cambridge · biggest emitters

How does 765 Concord Avenu compare with other K-12 school buildings in Cambridge?

The latest disclosures cover 45 K-12 school buildings in Cambridge, out of 902 buildings citywide. 765 Concord Avenu's ENERGY STAR score of 69 compares with an average of 60 across the 38 that report a score; it scores higher than 53% of them and lower than 45%. Its site EUI of 98.7 kBtu/ft² is about 58% above the average of 62.4 kBtu/ft² — it uses more energy per square foot than the typical building in that group.

At 27,000 sq ft, it is about 56% below the average floor area of 61,739 sq ft for those buildings. It was built in 1961, 5 years later than the group's average year built (1956). Across all 24 jurisdictions BuildingCensus covers, the 6,548 K-12 school buildings average an ENERGY STAR score of 64 and a site EUI of 52.7 kBtu/ft².

How has 765 Concord Avenu's energy performance changed over time?

BuildingCensus holds 10 Cambridge disclosures for 765 Concord Avenu, covering report years 2015–2024. Its ENERGY STAR score went from 40 in 2015 to 69 in 2024 (+29 points); its best year on file was 2020, at 90. Site EUI moved from 115.7 kBtu/ft² (2015) to 98.7 kBtu/ft² (2024), a 15% decrease. Reported emissions went from 181 tCO₂e to 145 tCO₂e over the same span (down 20%).

What does an ENERGY STAR score of 69 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 69 means the building performs better than about 69% of its national peers. BuildingCensus bands the score into report-card grades; 69 falls in band C — below median (55–69). It sits 6 points below 75, the threshold for ENERGY STAR certification. In Cambridge, 50% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. 765 Concord Avenu's 98.7 kBtu/ft² across 27,000 sq ft works out to about 2.7 billion Btu (781 MWh-equivalent) in 2024. Its source EUI of 114.8 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 50,697 kWh of electricity, 24,911 therms of natural gas and 305 thousand gallons of water for the year.

Which law requires 765 Concord Avenu to report its energy use?

765 Concord Avenu reports under BEUDO, the legal basis of Cambridge's Building Energy Use Disclosure Ordinance (BEUDO), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record cambridge:B1551:2024). Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).

More K-12 school buildings in Cambridge

Frequently asked questions

What is 765 Concord Avenu's energy grade?

765 Concord Avenu scores 69 out of 100 on ENERGY STAR — band C, below median (55–69) — in its 2024 Cambridge disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does 765 Concord Avenu use?

Its 2024 site energy-use intensity was 98.7 kBtu/ft² (114.8 kBtu/ft² source) across 27,000 sq ft, including 50,697 kWh of electricity and 24,911 therms of natural gas.

What are 765 Concord Avenu's carbon emissions?

765 Concord Avenu reported 145 tCO₂e of greenhouse-gas emissions for 2024.

Where is 765 Concord Avenu?

765 Concord Avenu is in Cambridge, Massachusetts. Its coordinates are 42.39140, -71.15420 (latitude, longitude), as published in the Building Energy Use Disclosure Ordinance (BEUDO) file.

How big is 765 Concord Avenu and when was it built?

765 Concord Avenu has 27,000 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1961 as its year built. It is classed as K-12 school.

Is 765 Concord Avenu covered by BEUDO?

Yes — it appears in the 2024 Building Energy Use Disclosure Ordinance (BEUDO) disclosure, which lists the buildings reporting under BEUDO.

Working with Cambridge building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Use Disclosure Ordinance (BEUDO) (BEUDO), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “765 Concord Avenu, Cambridge, Massachusetts — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/cambridge/765-concord-avenu-a5d4b7e2 (data as of October 2, 2026).