CH2 is a 180,000-square-foot data center at 1432 S. Clinton St in Chicago, Illinois, built in 2020. In its 2023 Chicago benchmarking disclosure it reported an ENERGY STAR score of 98 out of 100 (grade A), a site energy-use intensity of 139.0 kBtu/ft² and 3,132 tCO₂e of greenhouse-gas emissions. That score is higher than 83% of the 6 scored data center buildings in Chicago.

ENERGY STAR score
98
band A · 2023
Site EUI
139.0
kBtu/ft²
GHG emissions
3,132
tCO₂e
GHG intensity
17.4
kgCO₂e/ft²
Floor area
180,000
sq ft
Year built
2020
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

Building Energy Use Benchmarking Ordinance · reporting year 2023

Benchmarking record

FieldValue
ENERGY STAR score98 (band A)
Site EUI139.0 kBtu/ft²
Source EUI347.9 kBtu/ft²
GHG emissions3,132 tCO₂e
GHG intensity17.4 kgCO₂e/ft²
Electricity6,086,130 kWh
Natural gas42,546 therms
Water use1,977 kgal
Gross floor area180,000 sq ft
Source recordchicago:256876:2023

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2023latest98139.0 kBtu/ft²3,132 tCO₂e
2022—86.5 kBtu/ft²2,050 tCO₂e

Compliance context

Building Energy Use Benchmarking Ordinance

Covered buildings that fail to benchmark and report face fines of up to $100 plus $25 per day of violation under the ordinance.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
1432 S. Clinton St
State
Illinois
ZIP
60607
Coordinates
41.90168, -87.62977

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Chicago · biggest emitters

How does CH2 compare with other data center buildings in Chicago?

The latest disclosures cover 7 data center buildings in Chicago, out of 3,852 buildings citywide. CH2's ENERGY STAR score of 98 compares with an average of 59 across the 6 that report a score; it scores higher than 83% of them. Its site EUI of 139.0 kBtu/ft² is about 79% below the average of 651.1 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 17.4 kgCO₂e/ft² is about 76% below the group average of 73.8 kgCO₂e/ft².

At 180,000 sq ft, it is about half of the average floor area of 372,428 sq ft for those buildings. It was built in 2020, 78 years later than the group's average year built (1942). Across all 24 jurisdictions BuildingCensus covers, the 267 data center buildings average an ENERGY STAR score of 68 and a site EUI of 504.4 kBtu/ft².

How has CH2's energy performance changed over time?

BuildingCensus holds 2 Chicago disclosures for CH2, covering report years 2022–2023. Site EUI moved from 86.5 kBtu/ft² (2022) to 139.0 kBtu/ft² (2023), an 61% increase. Reported emissions went from 2,050 tCO₂e to 3,132 tCO₂e over the same span (up 53%).

What does an ENERGY STAR score of 98 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 98 means the building performs better than about 98% of its national peers. BuildingCensus bands the score into report-card grades; 98 falls in band A — high performer (85–100). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In Chicago, 35% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. CH2's 139.0 kBtu/ft² across 180,000 sq ft works out to about 25 billion Btu (7,333 MWh-equivalent) in 2023. Its source EUI of 347.9 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 6,086,130 kWh of electricity, 42,546 therms of natural gas and 1,977 thousand gallons of water for the year.

Which law requires CH2 to report its energy use?

CH2 reports under the Building Energy Use Benchmarking Ordinance, the legal basis of the Chicago Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2023 disclosure (source record chicago:256876:2023). Covered buildings that fail to benchmark and report face fines of up to $100 plus $25 per day of violation under the ordinance.

More data center buildings in Chicago

Frequently asked questions

What is CH2's energy grade?

CH2 scores 98 out of 100 on ENERGY STAR — band A, high performer (85–100) — in its 2023 Chicago disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does CH2 use?

Its 2023 site energy-use intensity was 139.0 kBtu/ft² (347.9 kBtu/ft² source) across 180,000 sq ft, including 6,086,130 kWh of electricity and 42,546 therms of natural gas.

What are CH2's carbon emissions?

CH2 reported 3,132 tCO₂e of greenhouse-gas emissions (17.4 kgCO₂e/ft²) for 2023.

Where is CH2?

CH2 is at 1432 S. Clinton St, in Chicago, Illinois 60607. Its coordinates are 41.90168, -87.62977 (latitude, longitude), as published in the Chicago Energy Benchmarking file.

How big is CH2 and when was it built?

CH2 has 180,000 sq ft of gross floor area, as reported in its 2023 disclosure. The disclosure lists 2020 as its year built. It is classed as data center.

Is CH2 covered by the Building Energy Use Benchmarking Ordinance?

Yes — it appears in the 2023 Chicago Energy Benchmarking disclosure, which lists the buildings reporting under the Building Energy Use Benchmarking Ordinance.

Working with Chicago building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Chicago Energy Benchmarking (Building Energy Use Benchmarking Ordinance), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “CH2, Chicago, Illinois — 2023 benchmarking disclosure”, https://buildingcensus.com/buildings/chicago/ch2-780ca2b4 (data as of October 2, 2026).