Swedish Hospital Campus
Mixed Use Property in Chicago, IL · 5145 North California · 60625
At a glance
Swedish Hospital Campus is a 799,492-square-foot mixed use property building at 5145 North California in Chicago, Illinois, built in 1918. In its 2023 Chicago benchmarking disclosure it reported an ENERGY STAR score of 44 out of 100 (grade D), a site energy-use intensity of 210.0 kBtu/ft² and 16,427 tCO₂e of greenhouse-gas emissions. That score is higher than 27% of the 11 scored mixed use property buildings in Chicago.
Building Energy Use Benchmarking Ordinance · reporting year 2023
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | 44 (band D) |
| Site EUI | 210.0 kBtu/ft² |
| Source EUI | 409.9 kBtu/ft² |
| GHG emissions | 16,427 tCO₂e |
| GHG intensity | 20.5 kgCO₂e/ft² |
| Electricity | 25,352,946 kWh |
| Natural gas | 813,818 therms |
| Gross floor area | 799,492 sq ft |
| Source record | chicago:250122:2023 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2023latest | 44 | ±0 | 210.0 kBtu/ft² | 16,427 tCO₂e |
| 2022 | 44 | ±0 | 206.6 kBtu/ft² | 15,863 tCO₂e |
| 2021 | 44 | -7 | 211.8 kBtu/ft² | 16,871 tCO₂e |
| 2020 | 51 | +4 | 213.4 kBtu/ft² | 18,719 tCO₂e |
| 2018 | 47 | -1 | 225.5 kBtu/ft² | 20,617 tCO₂e |
| 2017 | 48 | +2 | 214.0 kBtu/ft² | 21,454 tCO₂e |
| 2016 | 46 | +2 | 215.1 kBtu/ft² | 21,860 tCO₂e |
| 2015 | 44 | 218.6 kBtu/ft² | 23,182 tCO₂e |
Compliance context
Building Energy Use Benchmarking Ordinance
Covered buildings that fail to benchmark and report face fines of up to $100 plus $25 per day of violation under the ordinance.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 5145 North California
- City
- Chicago
- State
- Illinois
- ZIP
- 60625
- Coordinates
- 41.71455, -87.68172
Within ~1 km
Nearby benchmarked buildings
Residential · —
See also: most efficient in Chicago · biggest emitters
How does Swedish Hospital Campus compare with other mixed use property buildings in Chicago?
The latest disclosures cover 40 mixed use property buildings in Chicago, out of 3,852 buildings citywide. Swedish Hospital Campus's ENERGY STAR score of 44 compares with an average of 59 across the 11 that report a score; it scores higher than 27% of them and lower than 64%. Its site EUI of 210.0 kBtu/ft² is about twice the average of 98.2 kBtu/ft² — it uses more energy per square foot than the typical building in that group. Its emissions intensity of 20.5 kgCO₂e/ft² is about twice the group average of 10.1 kgCO₂e/ft².
At 799,492 sq ft, it is about 16% above the average floor area of 689,510 sq ft for those buildings. It was built in 1918, 51 years earlier than the group's average year built (1969). Across all 24 jurisdictions BuildingCensus covers, the 1,212 mixed use property buildings average an ENERGY STAR score of 69 and a site EUI of 79.8 kBtu/ft².
How has Swedish Hospital Campus's energy performance changed over time?
BuildingCensus holds 8 Chicago disclosures for Swedish Hospital Campus, covering report years 2015, 2016, 2017, 2018, 2020, 2021, 2022, 2023. Its ENERGY STAR score was 44 in both 2015 and 2023. Site EUI moved from 218.6 kBtu/ft² (2015) to 210.0 kBtu/ft² (2023), a 4% decrease. Reported emissions went from 23,182 tCO₂e to 16,427 tCO₂e over the same span (down 29%).
What does an ENERGY STAR score of 44 mean?
ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 44 means the building performs better than about 44% of its national peers. BuildingCensus bands the score into report-card grades; 44 falls in band D — lowest band (1–54). It sits 31 points below 75, the threshold for ENERGY STAR certification. In Chicago, 35% of scored buildings are at 75 or above.
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Swedish Hospital Campus's 210.0 kBtu/ft² across 799,492 sq ft works out to about 167.9 billion Btu (49,205 MWh-equivalent) in 2023. Its source EUI of 409.9 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 25,352,946 kWh of electricity and 813,818 therms of natural gas for the year.
Which law requires Swedish Hospital Campus to report its energy use?
Swedish Hospital Campus reports under the Building Energy Use Benchmarking Ordinance, the legal basis of the Chicago Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2023 disclosure (source record chicago:250122:2023). Covered buildings that fail to benchmark and report face fines of up to $100 plus $25 per day of violation under the ordinance.
More mixed use property buildings in Chicago
- Misericordia Home· 717,710 sq ft · EUI 101.5 kBtu/ft²
- Gold Coast Galleria· 462,140 sq ft · EUI 65.9 kBtu/ft²
- Wilson Yard· 415,976 sq ft · score 74 (B)
- 100 E Walton St· 367,703 sq ft · score 51 (D)
- Ascension SMEMC St Elizabeth Campus· 309,056 sq ft · EUI 162.5 kBtu/ft²
- 26810_26811 939 North Avenue Collection,LLC· 219,651 sq ft · EUI 51.1 kBtu/ft²
- Mixed Use Property buildings in Chicago· 40 benchmarked
- All Chicago benchmarked buildings· Building Energy Use Benchmarking Ordinance
- Most efficient large buildings in Chicago
- Least efficient large buildings in Chicago
- Biggest emitters in Chicago
Frequently asked questions
What is Swedish Hospital Campus's energy grade?
Swedish Hospital Campus scores 44 out of 100 on ENERGY STAR — band D, lowest band (1–54) — in its 2023 Chicago disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.
How much energy does Swedish Hospital Campus use?
Its 2023 site energy-use intensity was 210.0 kBtu/ft² (409.9 kBtu/ft² source) across 799,492 sq ft, including 25,352,946 kWh of electricity and 813,818 therms of natural gas.
What are Swedish Hospital Campus's carbon emissions?
Swedish Hospital Campus reported 16,427 tCO₂e of greenhouse-gas emissions (20.5 kgCO₂e/ft²) for 2023.
Where is Swedish Hospital Campus?
Swedish Hospital Campus is at 5145 North California, in Chicago, Illinois 60625. Its coordinates are 41.71455, -87.68172 (latitude, longitude), as published in the Chicago Energy Benchmarking file.
How big is Swedish Hospital Campus and when was it built?
Swedish Hospital Campus has 799,492 sq ft of gross floor area, as reported in its 2023 disclosure. The disclosure lists 1918 as its year built. It is classed as mixed use property.
Is Swedish Hospital Campus covered by the Building Energy Use Benchmarking Ordinance?
Yes — it appears in the 2023 Chicago Energy Benchmarking disclosure, which lists the buildings reporting under the Building Energy Use Benchmarking Ordinance.
Working with Chicago building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Chicago Energy Benchmarking (Building Energy Use Benchmarking Ordinance), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Swedish Hospital Campus, Chicago, Illinois — 2023 benchmarking disclosure”, https://buildingcensus.com/buildings/chicago/swedish-hospital-campus-9ee6f85e (data as of October 2, 2026).