BuildingCensus
–

Cpc - Fleet Maint - Bldg 5 - Solar

Office in Denver, CO · 1271 W Bayaud Ave, Bldg 5 · 80223

At a glance

Cpc - Fleet Maint - Bldg 5 - Solar is a 39,546-square-foot office building at 1271 W Bayaud Ave, Bldg 5 in Denver, Colorado, built in 2010. In its 2023 Denver benchmarking disclosure it reported a site energy-use intensity of 144.4 kBtu/ft² and 431 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2023
Site EUI
144.4
kBtu/ft²
GHG emissions
431
tCO₂e
GHG intensity
—
kgCO₂e/ft²
Floor area
39,546
sq ft
Year built
2010
vintage

Energize Denver Building Performance Policy · reporting year 2023

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI144.4 kBtu/ft²
Source EUI—
GHG emissions431 tCO₂e
GHG intensity—
Electricity276,044 kWh
Natural gas44,516 therms
Gross floor area39,546 sq ft
Source recorddenver:5801:2023

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2023latest—144.4 kBtu/ft²431 tCO₂e
2022—162.3 kBtu/ft²510 tCO₂e
2021—174.6 kBtu/ft²570 tCO₂e

Compliance context

Energize Denver Building Performance Policy

Energize Denver sets energy-use (EUI) targets for buildings of 25,000+ sq ft — for most buildings an interim target in 2028 and a final target in 2032 — with civil penalties of roughly $0.15–0.35 per kBtu over target for non-compliance.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
1271 W Bayaud Ave, Bldg 5
City
Denver
State
Colorado
ZIP
80223

Within ~1 km

Nearby benchmarked buildings

This source publishes no coordinates, so nearby buildings can't be resolved yet.

See also: most efficient in Denver · biggest emitters

How does Cpc - Fleet Maint - Bldg 5 - Solar compare with other office buildings in Denver?

The latest disclosures cover 427 office buildings in Denver, out of 3,287 buildings citywide. Its site EUI of 144.4 kBtu/ft² is about twice the average of 67.1 kBtu/ft² — it uses more energy per square foot than the typical building in that group.

At 39,546 sq ft, it is about 75% below the average floor area of 157,927 sq ft for those buildings. It was built in 2010, 30 years later than the group's average year built (1980). Across all 24 jurisdictions BuildingCensus covers, the 15,264 office buildings average an ENERGY STAR score of 73 and a site EUI of 59.3 kBtu/ft².

How has Cpc - Fleet Maint - Bldg 5 - Solar's energy performance changed over time?

BuildingCensus holds 3 Denver disclosures for Cpc - Fleet Maint - Bldg 5 - Solar, covering report years 2021–2023. Site EUI moved from 174.6 kBtu/ft² (2021) to 144.4 kBtu/ft² (2023), a 17% decrease. Reported emissions went from 570 tCO₂e to 431 tCO₂e over the same span (down 24%).

What does a site EUI of 144.4 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Cpc - Fleet Maint - Bldg 5 - Solar's 144.4 kBtu/ft² across 39,546 sq ft works out to about 5.7 billion Btu (1,674 MWh-equivalent) in 2023. The disclosure also reports 276,044 kWh of electricity and 44,516 therms of natural gas for the year.

Which law requires Cpc - Fleet Maint - Bldg 5 - Solar to report its energy use?

Cpc - Fleet Maint - Bldg 5 - Solar reports under the Energize Denver Building Performance Policy, the legal basis of Denver's Energize Denver Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2023 disclosure (source record denver:5801:2023). Energize Denver sets energy-use (EUI) targets for buildings of 25,000+ sq ft — for most buildings an interim target in 2028 and a final target in 2032 — with civil penalties of roughly $0.15–0.35 per kBtu over target for non-compliance.

More office buildings in Denver

Frequently asked questions

What is Cpc - Fleet Maint - Bldg 5 - Solar's energy grade?

Cpc - Fleet Maint - Bldg 5 - Solar did not report an ENERGY STAR score in its 2023 disclosure, but its site energy-use intensity was 144.4 kBtu/ft².

How much energy does Cpc - Fleet Maint - Bldg 5 - Solar use?

Its 2023 site energy-use intensity was 144.4 kBtu/ft² across 39,546 sq ft, including 276,044 kWh of electricity and 44,516 therms of natural gas.

What are Cpc - Fleet Maint - Bldg 5 - Solar's carbon emissions?

Cpc - Fleet Maint - Bldg 5 - Solar reported 431 tCO₂e of greenhouse-gas emissions for 2023.

Where is Cpc - Fleet Maint - Bldg 5 - Solar?

Cpc - Fleet Maint - Bldg 5 - Solar is at 1271 W Bayaud Ave, Bldg 5, in Denver, Colorado 80223.

How big is Cpc - Fleet Maint - Bldg 5 - Solar and when was it built?

Cpc - Fleet Maint - Bldg 5 - Solar has 39,546 sq ft of gross floor area, as reported in its 2023 disclosure. The disclosure lists 2010 as its year built. It is classed as office.

Is Cpc - Fleet Maint - Bldg 5 - Solar covered by the Energize Denver Building Performance Policy?

Yes — it appears in the 2023 Energize Denver Benchmarking disclosure, which lists the buildings reporting under the Energize Denver Building Performance Policy.

Working with Denver building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Energize Denver Benchmarking (Energize Denver Building Performance Policy), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Cpc - Fleet Maint - Bldg 5 - Solar, Denver, Colorado — 2023 benchmarking disclosure”, https://buildingcensus.com/buildings/denver/cpc-fleet-maint-bldg-5-solar-389b309c (data as of July 9, 2026).