Eco Roof And Solar
Manufacturing/Industrial Plant in Denver, CO · 389 S Lipan St · 80223
At a glance
Eco Roof And Solar is a 27,000-square-foot manufacturing/industrial plant at 389 S Lipan St in Denver, Colorado, built in 1935. In its 2023 Denver benchmarking disclosure it reported a site energy-use intensity of 49.0 kBtu/ft² and 102 tCO₂e of greenhouse-gas emissions.
Energize Denver Building Performance Policy · reporting year 2023
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 49.0 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 102 tCO₂e |
| GHG intensity | — |
| Electricity | 90,885 kWh |
| Natural gas | 10,118 therms |
| Gross floor area | 27,000 sq ft |
| Source record | denver:3562:2023 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2023latest | — | 49.0 kBtu/ft² | 102 tCO₂e | |
| 2022 | — | — | — | |
| 2021 | — | 52.1 kBtu/ft² | 116 tCO₂e |
Compliance context
Energize Denver Building Performance Policy
Energize Denver sets energy-use (EUI) targets for buildings of 25,000+ sq ft — for most buildings an interim target in 2028 and a final target in 2032 — with civil penalties of roughly $0.15–0.35 per kBtu over target for non-compliance.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 389 S Lipan St
- City
- Denver
- State
- Colorado
- ZIP
- 80223
Within ~1 km
Nearby benchmarked buildings
This source publishes no coordinates, so nearby buildings can't be resolved yet.
See also: most efficient in Denver · biggest emitters
How does Eco Roof And Solar compare with other manufacturing/industrial plant buildings in Denver?
The latest disclosures cover 240 manufacturing/industrial plant buildings in Denver, out of 3,287 buildings citywide. Its site EUI of 49.0 kBtu/ft² is about 77% below the average of 212.2 kBtu/ft² — it uses less energy per square foot than the typical building in that group.
At 27,000 sq ft, it is about 66% below the average floor area of 79,006 sq ft for those buildings. It was built in 1935, 37 years earlier than the group's average year built (1972). Across all 24 jurisdictions BuildingCensus covers, the 2,372 manufacturing/industrial plant buildings average an ENERGY STAR score of 67 and a site EUI of 126.3 kBtu/ft².
How has Eco Roof And Solar's energy performance changed over time?
BuildingCensus holds 3 Denver disclosures for Eco Roof And Solar, covering report years 2021–2023. Site EUI moved from 52.1 kBtu/ft² (2021) to 49.0 kBtu/ft² (2023), a 6% decrease. Reported emissions went from 116 tCO₂e to 102 tCO₂e over the same span (down 12%).
What does a site EUI of 49.0 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Eco Roof And Solar's 49.0 kBtu/ft² across 27,000 sq ft works out to about 1.3 billion Btu (388 MWh-equivalent) in 2023. The disclosure also reports 90,885 kWh of electricity and 10,118 therms of natural gas for the year.
Which law requires Eco Roof And Solar to report its energy use?
Eco Roof And Solar reports under the Energize Denver Building Performance Policy, the legal basis of Denver's Energize Denver Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2023 disclosure (source record denver:3562:2023). Energize Denver sets energy-use (EUI) targets for buildings of 25,000+ sq ft — for most buildings an interim target in 2028 and a final target in 2032 — with civil penalties of roughly $0.15–0.35 per kBtu over target for non-compliance.
More manufacturing/industrial plant buildings in Denver
- 2495 S Delaware Str· 26,474 sq ft · EUI 18.3 kBtu/ft²
- 1020 S. Lipan St.· 26,402 sq ft · EUI 441.5 kBtu/ft²
- Blazin Og Llc· 26,152 sq ft · EUI 381.0 kBtu/ft²
- 835 E 50Th Ave· 26,134 sq ft · EUI 19.8 kBtu/ft²
- 801 E 50Th Ave· 25,866 sq ft · EUI 62.7 kBtu/ft²
- Efi Polymers· 25,600 sq ft · EUI 115.6 kBtu/ft²
- Manufacturing/Industrial Plant buildings in Denver· 240 benchmarked
- All Denver benchmarked buildings· Energize Denver Building Performance Policy
- Most efficient large buildings in Denver
- Least efficient large buildings in Denver
- Biggest emitters in Denver
Frequently asked questions
What is Eco Roof And Solar's energy grade?
Eco Roof And Solar did not report an ENERGY STAR score in its 2023 disclosure, but its site energy-use intensity was 49.0 kBtu/ft².
How much energy does Eco Roof And Solar use?
Its 2023 site energy-use intensity was 49.0 kBtu/ft² across 27,000 sq ft, including 90,885 kWh of electricity and 10,118 therms of natural gas.
What are Eco Roof And Solar's carbon emissions?
Eco Roof And Solar reported 102 tCO₂e of greenhouse-gas emissions for 2023.
Where is Eco Roof And Solar?
Eco Roof And Solar is at 389 S Lipan St, in Denver, Colorado 80223.
How big is Eco Roof And Solar and when was it built?
Eco Roof And Solar has 27,000 sq ft of gross floor area, as reported in its 2023 disclosure. The disclosure lists 1935 as its year built. It is classed as manufacturing/industrial plant.
Is Eco Roof And Solar covered by the Energize Denver Building Performance Policy?
Yes — it appears in the 2023 Energize Denver Benchmarking disclosure, which lists the buildings reporting under the Energize Denver Building Performance Policy.
Working with Denver building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Energize Denver Benchmarking (Energize Denver Building Performance Policy), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Eco Roof And Solar, Denver, Colorado — 2023 benchmarking disclosure”, https://buildingcensus.com/buildings/denver/eco-roof-and-solar-a3065f03 (data as of July 9, 2026).