BuildingCensus
–

Fire Station #02

Fire Station in Montgomery County, MD · 7201 Carroll Ave · 20912

At a glance

Fire Station #02 is a 33,665-square-foot fire station at 7201 Carroll Ave in Montgomery County, Maryland, built in 1931. In its 2024 Montgomery County benchmarking disclosure it reported a site energy-use intensity of 57.3 kBtu/ft² and 134 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2024
Site EUI
57.3
kBtu/ft²
GHG emissions
134
tCO₂e
GHG intensity
—
kgCO₂e/ft²
Floor area
33,665
sq ft
Year built
1931
vintage

Benchmarking Law (Bill 2-14) / BEPS (Bill 16-21) · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI57.3 kBtu/ft²
Source EUI107.1 kBtu/ft²
GHG emissions134 tCO₂e
GHG intensity—
Electricity264,989 kWh
Natural gas10,232 therms
Gross floor area33,665 sq ft
Source recordmontgomery_county:5244957:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest—57.3 kBtu/ft²134 tCO₂e
2023—60.0 kBtu/ft²136 tCO₂e

Compliance context

Benchmarking Law (Bill 2-14) / BEPS (Bill 16-21)

Montgomery County's BEPS (Bill 16-21; regulations approved in 2025) sets declining site-EUI standards for buildings of 25,000+ sq ft, with interim and then final standards later this decade and into the 2030s depending on building type.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
7201 Carroll Ave
State
Maryland
ZIP
20912

Within ~1 km

Nearby benchmarked buildings

This source publishes no coordinates, so nearby buildings can't be resolved yet.

See also: most efficient in Montgomery County · biggest emitters

How does Fire Station #02 compare with other fire station buildings in Montgomery County?

The latest disclosures cover 5 fire station buildings in Montgomery County, out of 1,766 buildings citywide. Its site EUI of 57.3 kBtu/ft² is about 37% below the average of 90.6 kBtu/ft² — it uses less energy per square foot than the typical building in that group.

At 33,665 sq ft, it is about 20% above the average floor area of 28,068 sq ft for those buildings. It was built in 1931, 66 years earlier than the group's average year built (1997). Across all 24 jurisdictions BuildingCensus covers, the 233 fire station buildings average an ENERGY STAR score of 69 and a site EUI of 85.8 kBtu/ft².

How has Fire Station #02's energy performance changed over time?

BuildingCensus holds 2 Montgomery County disclosures for Fire Station #02, covering report years 2023–2024. Site EUI moved from 60.0 kBtu/ft² (2023) to 57.3 kBtu/ft² (2024), a 5% decrease. Reported emissions went from 136 tCO₂e to 134 tCO₂e over the same span (down 2%).

What does a site EUI of 57.3 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Fire Station #02's 57.3 kBtu/ft² across 33,665 sq ft works out to about 1.9 billion Btu (565 MWh-equivalent) in 2024. Its source EUI of 107.1 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 264,989 kWh of electricity and 10,232 therms of natural gas for the year.

Which law requires Fire Station #02 to report its energy use?

Fire Station #02 reports under the Benchmarking Law (Bill 2-14) / BEPS (Bill 16-21), the legal basis of Montgomery County's Commercial Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record montgomery_county:5244957:2024). Montgomery County's BEPS (Bill 16-21; regulations approved in 2025) sets declining site-EUI standards for buildings of 25,000+ sq ft, with interim and then final standards later this decade and into the 2030s depending on building type.

More fire station buildings in Montgomery County

Frequently asked questions

What is Fire Station #02's energy grade?

Fire Station #02 did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 57.3 kBtu/ft².

How much energy does Fire Station #02 use?

Its 2024 site energy-use intensity was 57.3 kBtu/ft² (107.1 kBtu/ft² source) across 33,665 sq ft, including 264,989 kWh of electricity and 10,232 therms of natural gas.

What are Fire Station #02's carbon emissions?

Fire Station #02 reported 134 tCO₂e of greenhouse-gas emissions for 2024.

Where is Fire Station #02?

Fire Station #02 is at 7201 Carroll Ave, in Montgomery County, Maryland 20912.

How big is Fire Station #02 and when was it built?

Fire Station #02 has 33,665 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1931 as its year built. It is classed as fire station.

Is Fire Station #02 covered by the Benchmarking Law (Bill 2-14) / BEPS (Bill 16-21)?

Yes — it appears in the 2024 Commercial Building Energy Benchmarking disclosure, which lists the buildings reporting under the Benchmarking Law (Bill 2-14) / BEPS (Bill 16-21).

Working with Montgomery County building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Commercial Building Energy Benchmarking (Benchmarking Law (Bill 2-14) / BEPS (Bill 16-21)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Fire Station #02, Montgomery County, Maryland — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/montgomery-county/fire-station-02-bc290dbe (data as of October 2, 2026).