BuildingCensus
–

Main Church And Friary

Worship Facility in Montgomery County, MD · 1500 St. Camillus Drive · 20903

At a glance

Main Church And Friary is a 27,009-square-foot worship facility at 1500 St. Camillus Drive in Montgomery County, Maryland, built in 1954. In its 2024 Montgomery County benchmarking disclosure it reported a site energy-use intensity of 45.5 kBtu/ft² and 78 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2024
Site EUI
45.5
kBtu/ft²
GHG emissions
78
tCO₂e
GHG intensity
—
kgCO₂e/ft²
Floor area
27,009
sq ft
Year built
1954
vintage

Benchmarking Law (Bill 2-14) / BEPS (Bill 16-21) · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI45.5 kBtu/ft²
Source EUI71.2 kBtu/ft²
GHG emissions78 tCO₂e
GHG intensity—
Electricity105,834 kWh
Natural gas8,683 therms
Gross floor area27,009 sq ft
Source recordmontgomery_county:5102414:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest—45.5 kBtu/ft²78 tCO₂e
2023—41.6 kBtu/ft²72 tCO₂e

Compliance context

Benchmarking Law (Bill 2-14) / BEPS (Bill 16-21)

Montgomery County's BEPS (Bill 16-21; regulations approved in 2025) sets declining site-EUI standards for buildings of 25,000+ sq ft, with interim and then final standards later this decade and into the 2030s depending on building type.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
1500 St. Camillus Drive
State
Maryland
ZIP
20903

Within ~1 km

Nearby benchmarked buildings

This source publishes no coordinates, so nearby buildings can't be resolved yet.

See also: most efficient in Montgomery County · biggest emitters

How does Main Church And Friary compare with other worship facility buildings in Montgomery County?

The latest disclosures cover 79 worship facility buildings in Montgomery County, out of 1,766 buildings citywide. Its site EUI of 45.5 kBtu/ft² is roughly in line with the average of 42.9 kBtu/ft².

At 27,009 sq ft, it is about 42% below the average floor area of 46,476 sq ft for those buildings. It was built in 1954, 20 years earlier than the group's average year built (1974). Across all 24 jurisdictions BuildingCensus covers, the 1,035 worship facility buildings average an ENERGY STAR score of 50 and a site EUI of 47.8 kBtu/ft².

How has Main Church And Friary's energy performance changed over time?

BuildingCensus holds 2 Montgomery County disclosures for Main Church And Friary, covering report years 2023–2024. Site EUI moved from 41.6 kBtu/ft² (2023) to 45.5 kBtu/ft² (2024), an 9% increase. Reported emissions went from 72 tCO₂e to 78 tCO₂e over the same span (up 9%).

What does a site EUI of 45.5 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Main Church And Friary's 45.5 kBtu/ft² across 27,009 sq ft works out to about 1.2 billion Btu (360 MWh-equivalent) in 2024. Its source EUI of 71.2 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 105,834 kWh of electricity and 8,683 therms of natural gas for the year.

Which law requires Main Church And Friary to report its energy use?

Main Church And Friary reports under the Benchmarking Law (Bill 2-14) / BEPS (Bill 16-21), the legal basis of Montgomery County's Commercial Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record montgomery_county:5102414:2024). Montgomery County's BEPS (Bill 16-21; regulations approved in 2025) sets declining site-EUI standards for buildings of 25,000+ sq ft, with interim and then final standards later this decade and into the 2030s depending on building type.

More worship facility buildings in Montgomery County

Frequently asked questions

What is Main Church And Friary's energy grade?

Main Church And Friary did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 45.5 kBtu/ft².

How much energy does Main Church And Friary use?

Its 2024 site energy-use intensity was 45.5 kBtu/ft² (71.2 kBtu/ft² source) across 27,009 sq ft, including 105,834 kWh of electricity and 8,683 therms of natural gas.

What are Main Church And Friary's carbon emissions?

Main Church And Friary reported 78 tCO₂e of greenhouse-gas emissions for 2024.

Where is Main Church And Friary?

Main Church And Friary is at 1500 St. Camillus Drive, in Montgomery County, Maryland 20903.

How big is Main Church And Friary and when was it built?

Main Church And Friary has 27,009 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1954 as its year built. It is classed as worship facility.

Is Main Church And Friary covered by the Benchmarking Law (Bill 2-14) / BEPS (Bill 16-21)?

Yes — it appears in the 2024 Commercial Building Energy Benchmarking disclosure, which lists the buildings reporting under the Benchmarking Law (Bill 2-14) / BEPS (Bill 16-21).

Working with Montgomery County building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Commercial Building Energy Benchmarking (Benchmarking Law (Bill 2-14) / BEPS (Bill 16-21)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Main Church And Friary, Montgomery County, Maryland — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/montgomery-county/main-church-and-friary-202ffaf7 (data as of October 2, 2026).