Cabrini Medical Tower
Medical Office in Seattle, WA · 901 BOREN AVE · 98104
At a glance
Cabrini Medical Tower is a 319,911-square-foot medical office at 901 BOREN AVE in Seattle, Washington, built in 1973. In its 2025 Seattle benchmarking disclosure it reported an ENERGY STAR score of 31 out of 100 (grade D), a site energy-use intensity of 117.4 kBtu/ft² and 422 tCO₂e of greenhouse-gas emissions. That score is higher than 22% of the 32 scored medical office buildings in Seattle.
Seattle Energy Benchmarking Ordinance (SMC 22.920) · reporting year 2025
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | 31 (band D) |
| Site EUI | 117.4 kBtu/ft² |
| Source EUI | 270.1 kBtu/ft² |
| GHG emissions | 422 tCO₂e |
| GHG intensity | 2.5 kgCO₂e/ft² |
| Electricity | 2,912,749 kWh |
| Gross floor area | 319,911 sq ft |
| Source record | seattle:677:2025 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2025latest | 31 | -4 | 117.4 kBtu/ft² | 422 tCO₂e |
| 2024 | 35 | +11 | 110.7 kBtu/ft² | 357 tCO₂e |
| 2023 | 24 | +3 | 123.5 kBtu/ft² | 433 tCO₂e |
| 2022 | 21 | +1 | 130.7 kBtu/ft² | 542 tCO₂e |
| 2021 | 20 | -36 | 132.0 kBtu/ft² | 551 tCO₂e |
| 2020 | 56 | +3 | 89.9 kBtu/ft² | 493 tCO₂e |
| 2019 | 53 | +1 | 90.1 kBtu/ft² | 423 tCO₂e |
| 2018 | 52 | -2 | 91.4 kBtu/ft² | 430 tCO₂e |
| 2017 | 54 | +4 | 89.4 kBtu/ft² | 388 tCO₂e |
| 2016 | 50 | -3 | 88.3 kBtu/ft² | 358 tCO₂e |
| 2015 | 53 | 86.9 kBtu/ft² | 332 tCO₂e |
Compliance context
Seattle Energy Benchmarking Ordinance (SMC 22.920)
Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 901 BOREN AVE
- City
- Seattle
- State
- Washington
- ZIP
- 98104
- Coordinates
- 47.60883, -122.32494
Within ~1 km
Nearby benchmarked buildings
College/University · 2,099,379 sq ft
Parking · 2,080,885 sq ft
- Columbia Centerscore 90
Office · 1,952,220 sq ft
Hospital (General Medical & Surgical) · 1,926,841 sq ft
- Seattle Convention Centerscore —
Convention Center · 1,842,925 sq ft
- Two Union Squarescore 96
Office · 1,605,578 sq ft
See also: most efficient in Seattle · biggest emitters
How does Cabrini Medical Tower compare with other medical office buildings in Seattle?
The latest disclosures cover 45 medical office buildings in Seattle, out of 3,871 buildings citywide. Cabrini Medical Tower's ENERGY STAR score of 31 compares with an average of 60 across the 32 that report a score; it scores higher than 22% of them and lower than 75%. Its site EUI of 117.4 kBtu/ft² is about 33% above the average of 88.3 kBtu/ft² — it uses more energy per square foot than the typical building in that group. Its emissions intensity of 2.5 kgCO₂e/ft² is about 67% above the group average of 1.5 kgCO₂e/ft².
At 319,911 sq ft, it is about twice the average floor area of 145,612 sq ft for those buildings. It was built in 1973, 6 years earlier than the group's average year built (1979). Across all 24 jurisdictions BuildingCensus covers, the 1,266 medical office buildings average an ENERGY STAR score of 64 and a site EUI of 92.2 kBtu/ft².
How has Cabrini Medical Tower's energy performance changed over time?
BuildingCensus holds 11 Seattle disclosures for Cabrini Medical Tower, covering report years 2015–2025. Its ENERGY STAR score went from 53 in 2015 to 31 in 2025 (-22 points); its best year on file was 2020, at 56. Site EUI moved from 86.9 kBtu/ft² (2015) to 117.4 kBtu/ft² (2025), an 35% increase. Reported emissions went from 332 tCO₂e to 422 tCO₂e over the same span (up 27%).
What does an ENERGY STAR score of 31 mean?
ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 31 means the building performs better than about 31% of its national peers. BuildingCensus bands the score into report-card grades; 31 falls in band D — lowest band (1–54). It sits 44 points below 75, the threshold for ENERGY STAR certification. In Seattle, 69% of scored buildings are at 75 or above.
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Cabrini Medical Tower's 117.4 kBtu/ft² across 319,911 sq ft works out to about 37.6 billion Btu (11,007 MWh-equivalent) in 2025. Its source EUI of 270.1 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 2,912,749 kWh of electricity for the year.
Which law requires Cabrini Medical Tower to report its energy use?
Cabrini Medical Tower reports under the Seattle Energy Benchmarking Ordinance (SMC 22.920), the legal basis of Seattle's Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2025 disclosure (source record seattle:677:2025). Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.
More medical office buildings in Seattle
- 600 BROADWAY· 289,419 sq ft · score 92 (A)
- HARBORVIEW MEDICAL CENTER - Pat Steel Building· 275,130 sq ft
- Virginia Mason- Lindeman Pavilion· 266,000 sq ft · score 66 (C)
- Meridian Medical Pavilion· 161,789 sq ft · score 69 (C)
- Northwest Outpatient Medical Center· 133,298 sq ft · score 24 (D)
- Northgate Plaza· 127,392 sq ft · EUI 57.0 kBtu/ft²
- Medical Office buildings in Seattle· 45 benchmarked
- All Seattle benchmarked buildings· Seattle Energy Benchmarking Ordinance (SMC 22.920)
- Most efficient large buildings in Seattle
- Least efficient large buildings in Seattle
- Biggest emitters in Seattle
Frequently asked questions
What is Cabrini Medical Tower's energy grade?
Cabrini Medical Tower scores 31 out of 100 on ENERGY STAR — band D, lowest band (1–54) — in its 2025 Seattle disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.
How much energy does Cabrini Medical Tower use?
Its 2025 site energy-use intensity was 117.4 kBtu/ft² (270.1 kBtu/ft² source) across 319,911 sq ft, including 2,912,749 kWh of electricity.
What are Cabrini Medical Tower's carbon emissions?
Cabrini Medical Tower reported 422 tCO₂e of greenhouse-gas emissions (2.5 kgCO₂e/ft²) for 2025.
Where is Cabrini Medical Tower?
Cabrini Medical Tower is at 901 BOREN AVE, in Seattle, Washington 98104. Its coordinates are 47.60883, -122.32494 (latitude, longitude), as published in the Building Energy Benchmarking file.
How big is Cabrini Medical Tower and when was it built?
Cabrini Medical Tower has 319,911 sq ft of gross floor area, as reported in its 2025 disclosure. The disclosure lists 1973 as its year built. It is classed as medical office.
Is Cabrini Medical Tower covered by the Seattle Energy Benchmarking Ordinance (SMC 22.920)?
Yes — it appears in the 2025 Building Energy Benchmarking disclosure, which lists the buildings reporting under the Seattle Energy Benchmarking Ordinance (SMC 22.920).
Working with Seattle building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking (Seattle Energy Benchmarking Ordinance (SMC 22.920)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Cabrini Medical Tower, Seattle, Washington — 2025 benchmarking disclosure”, https://buildingcensus.com/buildings/seattle/cabrini-medical-tower-e4116767 (data as of October 2, 2026).