BuildingCensus
C

First Covenant Church

Worship Facility in Seattle, WA · 1500 BELLEVUE AVE · 98122

At a glance

First Covenant Church is a 24,600-square-foot worship facility at 1500 BELLEVUE AVE in Seattle, Washington, built in 1910. In its 2025 Seattle benchmarking disclosure it reported an ENERGY STAR score of 62 out of 100 (grade C), a site energy-use intensity of 27.0 kBtu/ft² and 26 tCO₂e of greenhouse-gas emissions. That score is higher than 62% of the 52 scored worship facility buildings in Seattle.

ENERGY STAR score
62
band C · 2025
Site EUI
27.0
kBtu/ft²
GHG emissions
26
tCO₂e
GHG intensity
1.0
kgCO₂e/ft²
Floor area
24,600
sq ft
Year built
1910
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

Seattle Energy Benchmarking Ordinance (SMC 22.920) · reporting year 2025

Benchmarking record

FieldValue
ENERGY STAR score62 (band C)
Site EUI27.0 kBtu/ft²
Source EUI39.3 kBtu/ft²
GHG emissions26 tCO₂e
GHG intensity1.0 kgCO₂e/ft²
Electricity45,281 kWh
Natural gas5,087 therms
Gross floor area24,600 sq ft
Source recordseattle:25743:2025

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2025latest62+327.0 kBtu/ft²26 tCO₂e
202459+328.4 kBtu/ft²29 tCO₂e
202356-1529.7 kBtu/ft²30 tCO₂e
202271-2820.2 kBtu/ft²17 tCO₂e
202199+125.0 kBtu/ft²5 tCO₂e
202087+79.7 kBtu/ft²6 tCO₂e
201980+611.8 kBtu/ft²6 tCO₂e
201874-1013.1 kBtu/ft²6 tCO₂e
201784+1512.3 kBtu/ft²5 tCO₂e
201669±013.5 kBtu/ft²5 tCO₂e
20156914.2 kBtu/ft²7 tCO₂e

Compliance context

Seattle Energy Benchmarking Ordinance (SMC 22.920)

Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
1500 BELLEVUE AVE
State
Washington
ZIP
98122
Coordinates
47.61426, -122.32661

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Seattle · biggest emitters

How does First Covenant Church compare with other worship facility buildings in Seattle?

The latest disclosures cover 67 worship facility buildings in Seattle, out of 3,871 buildings citywide. First Covenant Church's ENERGY STAR score of 62 compares with an average of 50 across the 52 that report a score; it scores higher than 62% of them and lower than 31%. Its site EUI of 27.0 kBtu/ft² is about 29% below the average of 38.1 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 1.0 kgCO₂e/ft² is about 26% below the group average of 1.4 kgCO₂e/ft².

At 24,600 sq ft, it is about 25% below the average floor area of 32,782 sq ft for those buildings. It was built in 1910, 38 years earlier than the group's average year built (1948). Across all 24 jurisdictions BuildingCensus covers, the 1,035 worship facility buildings average an ENERGY STAR score of 50 and a site EUI of 47.8 kBtu/ft².

How has First Covenant Church's energy performance changed over time?

BuildingCensus holds 11 Seattle disclosures for First Covenant Church, covering report years 2015–2025. Its ENERGY STAR score went from 69 in 2015 to 62 in 2025 (-7 points); its best year on file was 2021, at 99. Site EUI moved from 14.2 kBtu/ft² (2015) to 27.0 kBtu/ft² (2025), an 90% increase. Reported emissions went from 7 tCO₂e to 26 tCO₂e over the same span (up 289%).

What does an ENERGY STAR score of 62 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 62 means the building performs better than about 62% of its national peers. BuildingCensus bands the score into report-card grades; 62 falls in band C — below median (55–69). It sits 13 points below 75, the threshold for ENERGY STAR certification. In Seattle, 69% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. First Covenant Church's 27.0 kBtu/ft² across 24,600 sq ft works out to about 0.7 billion Btu (195 MWh-equivalent) in 2025. Its source EUI of 39.3 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 45,281 kWh of electricity and 5,087 therms of natural gas for the year.

Which law requires First Covenant Church to report its energy use?

First Covenant Church reports under the Seattle Energy Benchmarking Ordinance (SMC 22.920), the legal basis of Seattle's Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2025 disclosure (source record seattle:25743:2025). Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

More worship facility buildings in Seattle

Frequently asked questions

What is First Covenant Church's energy grade?

First Covenant Church scores 62 out of 100 on ENERGY STAR — band C, below median (55–69) — in its 2025 Seattle disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does First Covenant Church use?

Its 2025 site energy-use intensity was 27.0 kBtu/ft² (39.3 kBtu/ft² source) across 24,600 sq ft, including 45,281 kWh of electricity and 5,087 therms of natural gas.

What are First Covenant Church's carbon emissions?

First Covenant Church reported 26 tCO₂e of greenhouse-gas emissions (1.0 kgCO₂e/ft²) for 2025.

Where is First Covenant Church?

First Covenant Church is at 1500 BELLEVUE AVE, in Seattle, Washington 98122. Its coordinates are 47.61426, -122.32661 (latitude, longitude), as published in the Building Energy Benchmarking file.

How big is First Covenant Church and when was it built?

First Covenant Church has 24,600 sq ft of gross floor area, as reported in its 2025 disclosure. The disclosure lists 1910 as its year built. It is classed as worship facility.

Is First Covenant Church covered by the Seattle Energy Benchmarking Ordinance (SMC 22.920)?

Yes — it appears in the 2025 Building Energy Benchmarking disclosure, which lists the buildings reporting under the Seattle Energy Benchmarking Ordinance (SMC 22.920).

Working with Seattle building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking (Seattle Energy Benchmarking Ordinance (SMC 22.920)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “First Covenant Church, Seattle, Washington — 2025 benchmarking disclosure”, https://buildingcensus.com/buildings/seattle/first-covenant-church-2e1b9e85 (data as of October 2, 2026).