BuildingCensus
–

King County Metro Transit Atlantic-Central Base-Campus

Vehicle Repair Services in Seattle, WA · 1200 6TH AVE S · 98134

At a glance

King County Metro Transit Atlantic-Central Base-Campus is a 230,971-square-foot vehicle repair services building at 1200 6TH AVE S in Seattle, Washington, built in 1991. In its 2025 Seattle benchmarking disclosure it reported a site energy-use intensity of 97.0 kBtu/ft² and 414 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2025
Site EUI
97.0
kBtu/ft²
GHG emissions
414
tCO₂e
GHG intensity
2.0
kgCO₂e/ft²
Floor area
230,971
sq ft
Year built
1991
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

Seattle Energy Benchmarking Ordinance (SMC 22.920) · reporting year 2025

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI97.0 kBtu/ft²
Source EUI216.8 kBtu/ft²
GHG emissions414 tCO₂e
GHG intensity2.0 kgCO₂e/ft²
Electricity3,965,978 kWh
Natural gas64,280 therms
Gross floor area230,971 sq ft
Source recordseattle:24086:2025

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2025latest—97.0 kBtu/ft²414 tCO₂e
2024—112.4 kBtu/ft²483 tCO₂e
2023—113.6 kBtu/ft²502 tCO₂e
2022—124.4 kBtu/ft²778 tCO₂e
2021—130.5 kBtu/ft²882 tCO₂e
2020—167.4 kBtu/ft²1,219 tCO₂e
2019—83.0 kBtu/ft²404 tCO₂e
2018—81.3 kBtu/ft²371 tCO₂e
2017—91.9 kBtu/ft²435 tCO₂e
2016—91.0 kBtu/ft²386 tCO₂e
2015—129.6 kBtu/ft²798 tCO₂e

Compliance context

Seattle Energy Benchmarking Ordinance (SMC 22.920)

Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
1200 6TH AVE S
State
Washington
ZIP
98134
Coordinates
47.59042, -122.32498

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Seattle · biggest emitters

How does King County Metro Transit Atlantic-Central Base-Campus compare with other vehicle repair services buildings in Seattle?

The latest disclosures cover 16 vehicle repair services buildings in Seattle, out of 3,871 buildings citywide. Its site EUI of 97.0 kBtu/ft² is about 24% above the average of 78.3 kBtu/ft² — it uses more energy per square foot than the typical building in that group. Its emissions intensity of 2.0 kgCO₂e/ft² is about 23% below the group average of 2.6 kgCO₂e/ft².

At 230,971 sq ft, it is about 436% above the average floor area of 43,130 sq ft for those buildings. It was built in 1991, 30 years later than the group's average year built (1961).

How has King County Metro Transit Atlantic-Central Base-Campus's energy performance changed over time?

BuildingCensus holds 11 Seattle disclosures for King County Metro Transit Atlantic-Central Base-Campus, covering report years 2015–2025. Site EUI moved from 129.6 kBtu/ft² (2015) to 97.0 kBtu/ft² (2025), a 25% decrease. Reported emissions went from 798 tCO₂e to 414 tCO₂e over the same span (down 48%).

What does a site EUI of 97.0 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. King County Metro Transit Atlantic-Central Base-Campus's 97.0 kBtu/ft² across 230,971 sq ft works out to about 22.4 billion Btu (6,566 MWh-equivalent) in 2025. Its source EUI of 216.8 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 3,965,978 kWh of electricity and 64,280 therms of natural gas for the year.

Which law requires King County Metro Transit Atlantic-Central Base-Campus to report its energy use?

King County Metro Transit Atlantic-Central Base-Campus reports under the Seattle Energy Benchmarking Ordinance (SMC 22.920), the legal basis of Seattle's Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2025 disclosure (source record seattle:24086:2025). Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

More vehicle repair services buildings in Seattle

Frequently asked questions

What is King County Metro Transit Atlantic-Central Base-Campus's energy grade?

King County Metro Transit Atlantic-Central Base-Campus did not report an ENERGY STAR score in its 2025 disclosure, but its site energy-use intensity was 97.0 kBtu/ft².

How much energy does King County Metro Transit Atlantic-Central Base-Campus use?

Its 2025 site energy-use intensity was 97.0 kBtu/ft² (216.8 kBtu/ft² source) across 230,971 sq ft, including 3,965,978 kWh of electricity and 64,280 therms of natural gas.

What are King County Metro Transit Atlantic-Central Base-Campus's carbon emissions?

King County Metro Transit Atlantic-Central Base-Campus reported 414 tCO₂e of greenhouse-gas emissions (2.0 kgCO₂e/ft²) for 2025.

Where is King County Metro Transit Atlantic-Central Base-Campus?

King County Metro Transit Atlantic-Central Base-Campus is at 1200 6TH AVE S, in Seattle, Washington 98134. Its coordinates are 47.59042, -122.32498 (latitude, longitude), as published in the Building Energy Benchmarking file.

How big is King County Metro Transit Atlantic-Central Base-Campus and when was it built?

King County Metro Transit Atlantic-Central Base-Campus has 230,971 sq ft of gross floor area, as reported in its 2025 disclosure. The disclosure lists 1991 as its year built. It is classed as vehicle repair services.

Is King County Metro Transit Atlantic-Central Base-Campus covered by the Seattle Energy Benchmarking Ordinance (SMC 22.920)?

Yes — it appears in the 2025 Building Energy Benchmarking disclosure, which lists the buildings reporting under the Seattle Energy Benchmarking Ordinance (SMC 22.920).

Working with Seattle building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking (Seattle Energy Benchmarking Ordinance (SMC 22.920)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “King County Metro Transit Atlantic-Central Base-Campus, Seattle, Washington — 2025 benchmarking disclosure”, https://buildingcensus.com/buildings/seattle/king-county-metro-transit-atlantic-central-base-campus-05543a83 (data as of October 2, 2026).