BuildingCensus
D

Swedish Hospital Medical Center (Alcoa Building)

Medical Office in Seattle, WA · 1401 MADISON ST · 98104

At a glance

Swedish Hospital Medical Center (Alcoa Building) is a 30,855-square-foot medical office at 1401 MADISON ST in Seattle, Washington, built in 1962. In its 2025 Seattle benchmarking disclosure it reported an ENERGY STAR score of 13 out of 100 (grade D), a site energy-use intensity of 106.2 kBtu/ft² and 63 tCO₂e of greenhouse-gas emissions. That score is higher than 9% of the 32 scored medical office buildings in Seattle.

ENERGY STAR score
13
band D · 2025
Site EUI
106.2
kBtu/ft²
GHG emissions
63
tCO₂e
GHG intensity
2.9
kgCO₂e/ft²
Floor area
30,855
sq ft
Year built
1962
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

Seattle Energy Benchmarking Ordinance (SMC 22.920) · reporting year 2025

Benchmarking record

FieldValue
ENERGY STAR score13 (band D)
Site EUI106.2 kBtu/ft²
Source EUI211.1 kBtu/ft²
GHG emissions63 tCO₂e
GHG intensity2.9 kgCO₂e/ft²
Electricity359,813 kWh
Natural gas10,628 therms
Gross floor area30,855 sq ft
Source recordseattle:21351:2025

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2025latest13+9106.2 kBtu/ft²63 tCO₂e
20244+1134.8 kBtu/ft²86 tCO₂e
20233-1148.0 kBtu/ft²102 tCO₂e
20224-7144.6 kBtu/ft²100 tCO₂e
202111+4128.1 kBtu/ft²91 tCO₂e
20207+3120.8 kBtu/ft²82 tCO₂e
20194-3135.7 kBtu/ft²91 tCO₂e
20187+3116.1 kBtu/ft²74 tCO₂e
20174+2134.4 kBtu/ft²86 tCO₂e
20162±0136.6 kBtu/ft²84 tCO₂e
20152139.1 kBtu/ft²87 tCO₂e

Compliance context

Seattle Energy Benchmarking Ordinance (SMC 22.920)

Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
1401 MADISON ST
State
Washington
ZIP
98104
Coordinates
47.61065, -122.32125

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Seattle · biggest emitters

How does Swedish Hospital Medical Center (Alcoa Building) compare with other medical office buildings in Seattle?

The latest disclosures cover 45 medical office buildings in Seattle, out of 3,871 buildings citywide. Swedish Hospital Medical Center (Alcoa Building)'s ENERGY STAR score of 13 compares with an average of 60 across the 32 that report a score; it scores higher than 9% of them and lower than 88%. Its site EUI of 106.2 kBtu/ft² is about 20% above the average of 88.3 kBtu/ft² — it uses more energy per square foot than the typical building in that group. Its emissions intensity of 2.9 kgCO₂e/ft² is about twice the group average of 1.5 kgCO₂e/ft².

At 30,855 sq ft, it is about 79% below the average floor area of 145,612 sq ft for those buildings. It was built in 1962, 17 years earlier than the group's average year built (1979). Across all 24 jurisdictions BuildingCensus covers, the 1,266 medical office buildings average an ENERGY STAR score of 64 and a site EUI of 92.2 kBtu/ft².

How has Swedish Hospital Medical Center (Alcoa Building)'s energy performance changed over time?

BuildingCensus holds 11 Seattle disclosures for Swedish Hospital Medical Center (Alcoa Building), covering report years 2015–2025. Its ENERGY STAR score went from 2 in 2015 to 13 in 2025 (+11 points). Site EUI moved from 139.1 kBtu/ft² (2015) to 106.2 kBtu/ft² (2025), a 24% decrease. Reported emissions went from 87 tCO₂e to 63 tCO₂e over the same span (down 28%).

What does an ENERGY STAR score of 13 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 13 means the building performs better than about 13% of its national peers. BuildingCensus bands the score into report-card grades; 13 falls in band D — lowest band (1–54). It sits 62 points below 75, the threshold for ENERGY STAR certification. In Seattle, 69% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Swedish Hospital Medical Center (Alcoa Building)'s 106.2 kBtu/ft² across 30,855 sq ft works out to about 3.3 billion Btu (960 MWh-equivalent) in 2025. Its source EUI of 211.1 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 359,813 kWh of electricity and 10,628 therms of natural gas for the year.

Which law requires Swedish Hospital Medical Center (Alcoa Building) to report its energy use?

Swedish Hospital Medical Center (Alcoa Building) reports under the Seattle Energy Benchmarking Ordinance (SMC 22.920), the legal basis of Seattle's Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2025 disclosure (source record seattle:21351:2025). Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

More medical office buildings in Seattle

Frequently asked questions

What is Swedish Hospital Medical Center (Alcoa Building)'s energy grade?

Swedish Hospital Medical Center (Alcoa Building) scores 13 out of 100 on ENERGY STAR — band D, lowest band (1–54) — in its 2025 Seattle disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does Swedish Hospital Medical Center (Alcoa Building) use?

Its 2025 site energy-use intensity was 106.2 kBtu/ft² (211.1 kBtu/ft² source) across 30,855 sq ft, including 359,813 kWh of electricity and 10,628 therms of natural gas.

What are Swedish Hospital Medical Center (Alcoa Building)'s carbon emissions?

Swedish Hospital Medical Center (Alcoa Building) reported 63 tCO₂e of greenhouse-gas emissions (2.9 kgCO₂e/ft²) for 2025.

Where is Swedish Hospital Medical Center (Alcoa Building)?

Swedish Hospital Medical Center (Alcoa Building) is at 1401 MADISON ST, in Seattle, Washington 98104. Its coordinates are 47.61065, -122.32125 (latitude, longitude), as published in the Building Energy Benchmarking file.

How big is Swedish Hospital Medical Center (Alcoa Building) and when was it built?

Swedish Hospital Medical Center (Alcoa Building) has 30,855 sq ft of gross floor area, as reported in its 2025 disclosure. The disclosure lists 1962 as its year built. It is classed as medical office.

Is Swedish Hospital Medical Center (Alcoa Building) covered by the Seattle Energy Benchmarking Ordinance (SMC 22.920)?

Yes — it appears in the 2025 Building Energy Benchmarking disclosure, which lists the buildings reporting under the Seattle Energy Benchmarking Ordinance (SMC 22.920).

Working with Seattle building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking (Seattle Energy Benchmarking Ordinance (SMC 22.920)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Swedish Hospital Medical Center (Alcoa Building), Seattle, Washington — 2025 benchmarking disclosure”, https://buildingcensus.com/buildings/seattle/swedish-hospital-medical-center-alcoa-building-ee69380f (data as of October 2, 2026).