The Quarter - San Diego Sunrise Management Company
Multifamily Housing in California, CA · 4939 Marconi Ave, Carmichael · 95608
At a glance
The Quarter - San Diego Sunrise Management Company is a 88,000-square-foot multifamily housing building at 4939 Marconi Ave, Carmichael in Carmichael, California, built in 1965. In its 2021 California benchmarking disclosure it reported an ENERGY STAR score of 74 out of 100 (grade B), a site energy-use intensity of 45.7 kBtu/ft² and 224 tCO₂e of greenhouse-gas emissions. That score is higher than 26% of the 9,612 scored multifamily housing buildings in California.
AB 802 (Public Resources Code §25402.10) · reporting year 2021
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | 74 (band B) |
| Site EUI | 45.7 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 224 tCO₂e |
| GHG intensity | 2.5 kgCO₂e/ft² |
| Electricity | 432,169 kWh |
| Natural gas | 25,325 therms |
| Gross floor area | 88,000 sq ft |
| Source record | california:17362072:2021 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2021latest | 74 | +6 | 45.7 kBtu/ft² | 224 tCO₂e |
| 2020 | 68 | 53.4 kBtu/ft² | 257 tCO₂e |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 4939 Marconi Ave, Carmichael
- City
- California
- State
- California
- ZIP
- 95608
- Coordinates
- 38.61770, -121.34897
Within ~1 km
Nearby benchmarked buildings
- Las Palmasscore 81
Multifamily Housing · 159,640 sq ft
- Westwoodscore 65
Multifamily Housing · 148,740 sq ft
- Westwood Apartments - Co (Ws037)score 100
Multifamily Housing · 148,740 sq ft
- 4800 Marconi Avescore 36
Multifamily Housing · 120,568 sq ft
Multifamily Housing · 113,750 sq ft
- The Palms Patio Apartmentsscore 71
Multifamily Housing · 69,183 sq ft
See also: most efficient in California · biggest emitters
How does The Quarter - San Diego Sunrise Management Company compare with other multifamily housing buildings in California?
The latest disclosures cover 10,630 multifamily housing buildings in California, out of 40,029 buildings citywide. The Quarter - San Diego Sunrise Management Company's ENERGY STAR score of 74 compares with an average of 82 across the 9,612 that report a score; it scores higher than 26% of them and lower than 73%. Its site EUI of 45.7 kBtu/ft² is about 33% above the average of 34.4 kBtu/ft² — it uses more energy per square foot than the typical building in that group. Its emissions intensity of 2.5 kgCO₂e/ft² is about 19% above the group average of 2.1 kgCO₂e/ft².
At 88,000 sq ft, it is about 42% below the average floor area of 150,919 sq ft for those buildings. It was built in 1965, 23 years earlier than the group's average year built (1988). Across all 24 jurisdictions BuildingCensus covers, the 59,945 multifamily housing buildings average an ENERGY STAR score of 70 and a site EUI of 59.0 kBtu/ft².
How has The Quarter - San Diego Sunrise Management Company's energy performance changed over time?
BuildingCensus holds 2 California disclosures for The Quarter - San Diego Sunrise Management Company, covering report years 2020–2021. Its ENERGY STAR score went from 68 in 2020 to 74 in 2021 (+6 points). Site EUI moved from 53.4 kBtu/ft² (2020) to 45.7 kBtu/ft² (2021), a 14% decrease. Reported emissions went from 257 tCO₂e to 224 tCO₂e over the same span (down 13%).
What does an ENERGY STAR score of 74 mean?
ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 74 means the building performs better than about 74% of its national peers. BuildingCensus bands the score into report-card grades; 74 falls in band B — above median (70–84). It sits 1 points below 75, the threshold for ENERGY STAR certification. In California, 65% of scored buildings are at 75 or above.
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. The Quarter - San Diego Sunrise Management Company's 45.7 kBtu/ft² across 88,000 sq ft works out to about 4 billion Btu (1,179 MWh-equivalent) in 2021. The disclosure also reports 432,169 kWh of electricity and 25,325 therms of natural gas for the year.
Which law requires The Quarter - San Diego Sunrise Management Company to report its energy use?
The Quarter - San Diego Sunrise Management Company reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2021 disclosure (source record california:17362072:2021). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More multifamily housing buildings in California
- 1313 W Memory Lane· 87,991 sq ft · score 89 (A)
- Las Casas De Madera· 87,989 sq ft · score 100 (A)
- 200 Chipmunk St· 87,971 sq ft · score 100 (A)
- Kings Beach Housing· 87,971 sq ft · score 99 (A)
- Hearthstone Village· 87,968 sq ft · score 65 (C)
- San Pasqual (Sq07)· 87,937 sq ft · score 93 (A)
- Multifamily Housing buildings in California· 10,630 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is The Quarter - San Diego Sunrise Management Company's energy grade?
The Quarter - San Diego Sunrise Management Company scores 74 out of 100 on ENERGY STAR — band B, above median (70–84) — in its 2021 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.
How much energy does The Quarter - San Diego Sunrise Management Company use?
Its 2021 site energy-use intensity was 45.7 kBtu/ft² across 88,000 sq ft, including 432,169 kWh of electricity and 25,325 therms of natural gas.
What are The Quarter - San Diego Sunrise Management Company's carbon emissions?
The Quarter - San Diego Sunrise Management Company reported 224 tCO₂e of greenhouse-gas emissions (2.5 kgCO₂e/ft²) for 2021.
Where is The Quarter - San Diego Sunrise Management Company?
The Quarter - San Diego Sunrise Management Company is at 4939 Marconi Ave, Carmichael, in Carmichael, California 95608. Its coordinates are 38.61770, -121.34897 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is The Quarter - San Diego Sunrise Management Company and when was it built?
The Quarter - San Diego Sunrise Management Company has 88,000 sq ft of gross floor area, as reported in its 2021 disclosure. The disclosure lists 1965 as its year built. It is classed as multifamily housing.
Is The Quarter - San Diego Sunrise Management Company covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2021 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “The Quarter - San Diego Sunrise Management Company, Carmichael, California — 2021 benchmarking disclosure”, https://buildingcensus.com/buildings/california/the-quarter-san-diego-sunrise-management-company-138c8c2c (data as of July 9, 2026).