BuildingCensus
–

320 MEMORIAL DR

College/University in Cambridge, MA

At a glance

320 MEMORIAL DR is a 138,589-square-foot college/university building in Cambridge, Massachusetts, built in 1963. In its 2024 Cambridge benchmarking disclosure it reported a site energy-use intensity of 72.3 kBtu/ft² and 686 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2024
Site EUI
72.3
kBtu/ft²
GHG emissions
686
tCO₂e
GHG intensity
—
kgCO₂e/ft²
Floor area
138,589
sq ft
Year built
1963
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

BEUDO · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI72.3 kBtu/ft²
Source EUI128.4 kBtu/ft²
GHG emissions686 tCO₂e
GHG intensity—
Electricity1,054,553 kWh
Water use4,722 kgal
Gross floor area138,589 sq ft
Source recordcambridge:B1572:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest—72.3 kBtu/ft²686 tCO₂e
2023—67.1 kBtu/ft²639 tCO₂e
2022—86.9 kBtu/ft²820 tCO₂e
2021—122.6 kBtu/ft²1,150 tCO₂e
2020—99.7 kBtu/ft²936 tCO₂e
2019—114.9 kBtu/ft²1,055 tCO₂e
2018—107.8 kBtu/ft²1,005 tCO₂e
2017—87.7 kBtu/ft²840 tCO₂e
2016—70.7 kBtu/ft²673 tCO₂e
2015—91.7 kBtu/ft²881 tCO₂e

Compliance context

BEUDO

Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).

Program details →

Ownership

MASSACHUSETTS INSTITUTE OF TECHNOLOGY

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
320 MEMORIAL DR
State
Massachusetts
Coordinates
42.35720, -71.09440

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Cambridge · biggest emitters

How does 320 MEMORIAL DR compare with other college/university buildings in Cambridge?

The latest disclosures cover 203 college/university buildings in Cambridge, out of 902 buildings citywide. Its site EUI of 72.3 kBtu/ft² is about half of the average of 154.3 kBtu/ft² — it uses less energy per square foot than the typical building in that group.

At 138,589 sq ft, it is about 43% above the average floor area of 96,964 sq ft for those buildings. It was built in 1963, 14 years later than the group's average year built (1949). Across all 24 jurisdictions BuildingCensus covers, the 2,113 college/university buildings average an ENERGY STAR score of 68 and a site EUI of 98.7 kBtu/ft².

How has 320 MEMORIAL DR's energy performance changed over time?

BuildingCensus holds 10 Cambridge disclosures for 320 MEMORIAL DR, covering report years 2015–2024. Site EUI moved from 91.7 kBtu/ft² (2015) to 72.3 kBtu/ft² (2024), a 21% decrease. Reported emissions went from 881 tCO₂e to 686 tCO₂e over the same span (down 22%).

What does a site EUI of 72.3 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. 320 MEMORIAL DR's 72.3 kBtu/ft² across 138,589 sq ft works out to about 10 billion Btu (2,937 MWh-equivalent) in 2024. Its source EUI of 128.4 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 1,054,553 kWh of electricity and 4,722 thousand gallons of water for the year.

Which law requires 320 MEMORIAL DR to report its energy use?

320 MEMORIAL DR reports under BEUDO, the legal basis of Cambridge's Building Energy Use Disclosure Ordinance (BEUDO), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record cambridge:B1572:2024). Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).

More college/university buildings in Cambridge

Frequently asked questions

What is 320 MEMORIAL DR's energy grade?

320 MEMORIAL DR did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 72.3 kBtu/ft².

How much energy does 320 MEMORIAL DR use?

Its 2024 site energy-use intensity was 72.3 kBtu/ft² (128.4 kBtu/ft² source) across 138,589 sq ft, including 1,054,553 kWh of electricity.

What are 320 MEMORIAL DR's carbon emissions?

320 MEMORIAL DR reported 686 tCO₂e of greenhouse-gas emissions for 2024.

Where is 320 MEMORIAL DR?

320 MEMORIAL DR is in Cambridge, Massachusetts. Its coordinates are 42.35720, -71.09440 (latitude, longitude), as published in the Building Energy Use Disclosure Ordinance (BEUDO) file.

How big is 320 MEMORIAL DR and when was it built?

320 MEMORIAL DR has 138,589 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1963 as its year built. It is classed as college/university.

Is 320 MEMORIAL DR covered by BEUDO?

Yes — it appears in the 2024 Building Energy Use Disclosure Ordinance (BEUDO) disclosure, which lists the buildings reporting under BEUDO.

Working with Cambridge building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Use Disclosure Ordinance (BEUDO) (BEUDO), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “320 MEMORIAL DR, Cambridge, Massachusetts — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/cambridge/320-memorial-dr-e9cd0028 (data as of October 2, 2026).