60 Hampshire Street
Laboratory in Cambridge, MA
At a glance
60 Hampshire Street is a 39,014-square-foot laboratory building in Cambridge, Massachusetts, built in 1999. In its 2024 Cambridge benchmarking disclosure it reported a site energy-use intensity of 259.5 kBtu/ft² and 665 tCO₂e of greenhouse-gas emissions.
BEUDO · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 259.5 kBtu/ft² |
| Source EUI | 570.3 kBtu/ft² |
| GHG emissions | 665 tCO₂e |
| GHG intensity | — |
| Electricity | 1,946,107 kWh |
| Natural gas | 34,842 therms |
| Water use | 873 kgal |
| Gross floor area | 39,014 sq ft |
| Source record | cambridge:B1599:2024 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2024latest | — | 259.5 kBtu/ft² | 665 tCO₂e | |
| 2023 | — | 257.7 kBtu/ft² | 654 tCO₂e | |
| 2022 | — | 166.8 kBtu/ft² | 408 tCO₂e | |
| 2021 | — | 83.2 kBtu/ft² | 196 tCO₂e | |
| 2020 | — | 86.4 kBtu/ft² | 205 tCO₂e | |
| 2019 | — | 89.9 kBtu/ft² | 207 tCO₂e | |
| 2018 | — | 87.3 kBtu/ft² | 207 tCO₂e | |
| 2017 | — | 80.5 kBtu/ft² | 197 tCO₂e | |
| 2016 | — | 73.4 kBtu/ft² | 180 tCO₂e | |
| 2015 | — | 72.7 kBtu/ft² | 179 tCO₂e |
Compliance context
BEUDO
Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).
Ownership
BMR-HAMPSHIRE LLC,
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 60 Hampshire Street
- City
- Cambridge
- State
- Massachusetts
- Coordinates
- 42.36700, -71.09340
Within ~1 km
Nearby benchmarked buildings
- 250 Massachusetts Avenuescore —
Laboratory · 1,362,662 sq ft
- 250 Massachusetts Avenuescore —
Laboratory · 517,029 sq ft
- 325 Main Stscore 87
Office · 494,512 sq ft
- 145 Broadwayscore 91
Office · 490,000 sq ft
- 314 Main St.score 80
Office · 482,220 sq ft
- 303 Binney Stscore —
Laboratory · 480,000 sq ft
See also: most efficient in Cambridge · biggest emitters
How does 60 Hampshire Street compare with other laboratory buildings in Cambridge?
The latest disclosures cover 88 laboratory buildings in Cambridge, out of 902 buildings citywide. Its site EUI of 259.5 kBtu/ft² is roughly in line with the average of 272.6 kBtu/ft² — it uses less energy per square foot than the typical building in that group.
At 39,014 sq ft, it is about 79% below the average floor area of 181,468 sq ft for those buildings. It was built in 1999, 15 years later than the group's average year built (1984). Across all 24 jurisdictions BuildingCensus covers, the 795 laboratory buildings average an ENERGY STAR score of 29 and a site EUI of 231.7 kBtu/ft².
How has 60 Hampshire Street's energy performance changed over time?
BuildingCensus holds 10 Cambridge disclosures for 60 Hampshire Street, covering report years 2015–2024. Site EUI moved from 72.7 kBtu/ft² (2015) to 259.5 kBtu/ft² (2024), an 257% increase. Reported emissions went from 179 tCO₂e to 665 tCO₂e over the same span (up 271%).
What does a site EUI of 259.5 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. 60 Hampshire Street's 259.5 kBtu/ft² across 39,014 sq ft works out to about 10.1 billion Btu (2,967 MWh-equivalent) in 2024. Its source EUI of 570.3 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 1,946,107 kWh of electricity, 34,842 therms of natural gas and 873 thousand gallons of water for the year.
Which law requires 60 Hampshire Street to report its energy use?
60 Hampshire Street reports under BEUDO, the legal basis of Cambridge's Building Energy Use Disclosure Ordinance (BEUDO), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record cambridge:B1599:2024). Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).
More laboratory buildings in Cambridge
- 128 Sidney Street· 38,252 sq ft · EUI 69.7 kBtu/ft²
- 730 Main Street· 38,000 sq ft · EUI 135.6 kBtu/ft²
- 149 Sidney Street· 37,116 sq ft · EUI 34.3 kBtu/ft²
- 75 Moulton and 20 Wilson· 36,304 sq ft · EUI 259.7 kBtu/ft²
- 12 Emily Street· 31,949 sq ft · EUI 200.9 kBtu/ft²
- 205 Alewife Brook Parkway· 28,054 sq ft · EUI 2594.5 kBtu/ft²
- Laboratory buildings in Cambridge· 88 benchmarked
- All Cambridge benchmarked buildings· BEUDO
- Most efficient large buildings in Cambridge
- Least efficient large buildings in Cambridge
- Biggest emitters in Cambridge
Frequently asked questions
What is 60 Hampshire Street's energy grade?
60 Hampshire Street did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 259.5 kBtu/ft².
How much energy does 60 Hampshire Street use?
Its 2024 site energy-use intensity was 259.5 kBtu/ft² (570.3 kBtu/ft² source) across 39,014 sq ft, including 1,946,107 kWh of electricity and 34,842 therms of natural gas.
What are 60 Hampshire Street's carbon emissions?
60 Hampshire Street reported 665 tCO₂e of greenhouse-gas emissions for 2024.
Where is 60 Hampshire Street?
60 Hampshire Street is in Cambridge, Massachusetts. Its coordinates are 42.36700, -71.09340 (latitude, longitude), as published in the Building Energy Use Disclosure Ordinance (BEUDO) file.
How big is 60 Hampshire Street and when was it built?
60 Hampshire Street has 39,014 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1999 as its year built. It is classed as laboratory.
Is 60 Hampshire Street covered by BEUDO?
Yes — it appears in the 2024 Building Energy Use Disclosure Ordinance (BEUDO) disclosure, which lists the buildings reporting under BEUDO.
Working with Cambridge building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Use Disclosure Ordinance (BEUDO) (BEUDO), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “60 Hampshire Street, Cambridge, Massachusetts — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/cambridge/60-hampshire-street-5aba34fe (data as of October 2, 2026).