BuildingCensus
C

Saint Anthony Hospital - Main Hospital

Hospital (General Medical & Surgical) in Chicago, IL · 2875 West 19th Street · 60623

At a glance

Saint Anthony Hospital - Main Hospital is a 239,057-square-foot hospital (general medical & surgical) at 2875 West 19th Street in Chicago, Illinois, built in 1897. In its 2023 Chicago benchmarking disclosure it reported an ENERGY STAR score of 62 out of 100 (grade C), a site energy-use intensity of 264.0 kBtu/ft² and 5,278 tCO₂e of greenhouse-gas emissions. That score is higher than 48% of the 21 scored hospital (general medical & surgical) buildings in Chicago.

ENERGY STAR score
62
band C · 2023
Site EUI
264.0
kBtu/ft²
GHG emissions
5,278
tCO₂e
GHG intensity
22.1
kgCO₂e/ft²
Floor area
239,057
sq ft
Year built
1897
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

Building Energy Use Benchmarking Ordinance · reporting year 2023

Benchmarking record

FieldValue
ENERGY STAR score62 (band C)
Site EUI264.0 kBtu/ft²
Source EUI452.1 kBtu/ft²
GHG emissions5,278 tCO₂e
GHG intensity22.1 kgCO₂e/ft²
Electricity6,999,832 kWh
Natural gas392,369 therms
Gross floor area239,057 sq ft
Source recordchicago:100179:2023

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2023latest62264.0 kBtu/ft²5,278 tCO₂e
2022———
202156+1284.1 kBtu/ft²5,735 tCO₂e
202055-17276.5 kBtu/ft²6,096 tCO₂e
201972+16259.9 kBtu/ft²—
201856+1273.0 kBtu/ft²6,263 tCO₂e
201755+8263.1 kBtu/ft²6,609 tCO₂e
201647+3281.5 kBtu/ft²6,968 tCO₂e
201544283.0 kBtu/ft²7,419 tCO₂e

Compliance context

Building Energy Use Benchmarking Ordinance

Covered buildings that fail to benchmark and report face fines of up to $100 plus $25 per day of violation under the ordinance.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
2875 West 19th Street
State
Illinois
ZIP
60623
Coordinates
41.68994, -87.63761

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Chicago · biggest emitters

How does Saint Anthony Hospital - Main Hospital compare with other hospital (general medical & surgical) buildings in Chicago?

The latest disclosures cover 25 hospital (general medical & surgical) buildings in Chicago, out of 3,852 buildings citywide. Saint Anthony Hospital - Main Hospital's ENERGY STAR score of 62 compares with an average of 56 across the 21 that report a score; it scores higher than 48% of them and lower than 48%. Its site EUI of 264.0 kBtu/ft² is about 15% above the average of 229.9 kBtu/ft² — it uses more energy per square foot than the typical building in that group. Its emissions intensity of 22.1 kgCO₂e/ft² is roughly in line with the group average of 20.4 kgCO₂e/ft².

At 239,057 sq ft, it is about 74% below the average floor area of 920,964 sq ft for those buildings. It was built in 1897, 69 years earlier than the group's average year built (1967). Across all 24 jurisdictions BuildingCensus covers, the 748 hospital (general medical & surgical) buildings average an ENERGY STAR score of 59 and a site EUI of 238.7 kBtu/ft².

How has Saint Anthony Hospital - Main Hospital's energy performance changed over time?

BuildingCensus holds 9 Chicago disclosures for Saint Anthony Hospital - Main Hospital, covering report years 2015–2023. Its ENERGY STAR score went from 44 in 2015 to 62 in 2023 (+18 points); its best year on file was 2019, at 72. Site EUI moved from 283.0 kBtu/ft² (2015) to 264.0 kBtu/ft² (2023), a 7% decrease. Reported emissions went from 7,419 tCO₂e to 5,278 tCO₂e over the same span (down 29%).

What does an ENERGY STAR score of 62 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 62 means the building performs better than about 62% of its national peers. BuildingCensus bands the score into report-card grades; 62 falls in band C — below median (55–69). It sits 13 points below 75, the threshold for ENERGY STAR certification. In Chicago, 35% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Saint Anthony Hospital - Main Hospital's 264.0 kBtu/ft² across 239,057 sq ft works out to about 63.1 billion Btu (18,496 MWh-equivalent) in 2023. Its source EUI of 452.1 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 6,999,832 kWh of electricity and 392,369 therms of natural gas for the year.

Which law requires Saint Anthony Hospital - Main Hospital to report its energy use?

Saint Anthony Hospital - Main Hospital reports under the Building Energy Use Benchmarking Ordinance, the legal basis of the Chicago Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2023 disclosure (source record chicago:100179:2023). Covered buildings that fail to benchmark and report face fines of up to $100 plus $25 per day of violation under the ordinance.

More hospital (general medical & surgical) buildings in Chicago

Frequently asked questions

What is Saint Anthony Hospital - Main Hospital's energy grade?

Saint Anthony Hospital - Main Hospital scores 62 out of 100 on ENERGY STAR — band C, below median (55–69) — in its 2023 Chicago disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does Saint Anthony Hospital - Main Hospital use?

Its 2023 site energy-use intensity was 264.0 kBtu/ft² (452.1 kBtu/ft² source) across 239,057 sq ft, including 6,999,832 kWh of electricity and 392,369 therms of natural gas.

What are Saint Anthony Hospital - Main Hospital's carbon emissions?

Saint Anthony Hospital - Main Hospital reported 5,278 tCO₂e of greenhouse-gas emissions (22.1 kgCO₂e/ft²) for 2023.

Where is Saint Anthony Hospital - Main Hospital?

Saint Anthony Hospital - Main Hospital is at 2875 West 19th Street, in Chicago, Illinois 60623. Its coordinates are 41.68994, -87.63761 (latitude, longitude), as published in the Chicago Energy Benchmarking file.

How big is Saint Anthony Hospital - Main Hospital and when was it built?

Saint Anthony Hospital - Main Hospital has 239,057 sq ft of gross floor area, as reported in its 2023 disclosure. The disclosure lists 1897 as its year built. It is classed as hospital (general medical & surgical).

Is Saint Anthony Hospital - Main Hospital covered by the Building Energy Use Benchmarking Ordinance?

Yes — it appears in the 2023 Chicago Energy Benchmarking disclosure, which lists the buildings reporting under the Building Energy Use Benchmarking Ordinance.

Working with Chicago building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Chicago Energy Benchmarking (Building Energy Use Benchmarking Ordinance), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Saint Anthony Hospital - Main Hospital, Chicago, Illinois — 2023 benchmarking disclosure”, https://buildingcensus.com/buildings/chicago/saint-anthony-hospital-main-hospital-897ce61d (data as of October 2, 2026).