Thorek Memorial Hospital
Hospital (General Medical & Surgical) in Chicago, IL · 850 W. Irving Park Rd · 60613
At a glance
Thorek Memorial Hospital is a 205,000-square-foot hospital (general medical & surgical) at 850 W. Irving Park Rd in Chicago, Illinois, built in 1981. In its 2023 Chicago benchmarking disclosure it reported an ENERGY STAR score of 88 out of 100 (grade A), a site energy-use intensity of 199.9 kBtu/ft² and 3,641 tCO₂e of greenhouse-gas emissions. That score is higher than 76% of the 21 scored hospital (general medical & surgical) buildings in Chicago.
Building Energy Use Benchmarking Ordinance · reporting year 2023
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | 88 (band A) |
| Site EUI | 199.9 kBtu/ft² |
| Source EUI | 353.9 kBtu/ft² |
| GHG emissions | 3,641 tCO₂e |
| GHG intensity | 17.8 kgCO₂e/ft² |
| Electricity | 4,943,416 kWh |
| Natural gas | 241,125 therms |
| Gross floor area | 205,000 sq ft |
| Source record | chicago:164922:2023 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2023latest | 88 | ±0 | 199.9 kBtu/ft² | 3,641 tCO₂e |
| 2022 | 88 | -6 | 202.4 kBtu/ft² | 3,564 tCO₂e |
| 2021 | 94 | -3 | 174.5 kBtu/ft² | 3,424 tCO₂e |
| 2020 | 97 | ±0 | 164.3 kBtu/ft² | 3,411 tCO₂e |
| 2019 | 97 | -1 | 166.2 kBtu/ft² | 3,550 tCO₂e |
| 2018 | 98 | +5 | 160.0 kBtu/ft² | 3,484 tCO₂e |
| 2017 | 93 | -4 | 169.0 kBtu/ft² | 3,959 tCO₂e |
| 2016 | 97 | ±0 | 155.5 kBtu/ft² | 3,723 tCO₂e |
| 2015 | 97 | 156.0 kBtu/ft² | 3,896 tCO₂e |
Compliance context
Building Energy Use Benchmarking Ordinance
Covered buildings that fail to benchmark and report face fines of up to $100 plus $25 per day of violation under the ordinance.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 850 W. Irving Park Rd
- City
- Chicago
- State
- Illinois
- ZIP
- 60613
- Coordinates
- 41.88927, -87.62973
Within ~1 km
Nearby benchmarked buildings
- theMART, Chicagoscore —
Office · 4,131,093 sq ft
- 10/30 South Wackerscore 72
Office · 3,014,304 sq ft
- Chase Tower Chicagoscore —
Financial Office · 2,521,929 sq ft
- CH3 - Chicago 300 E Randolphscore 75
Office · 2,224,842 sq ft
- 71215A State Stscore 45
Retail Store · 1,841,736 sq ft
- 680 North Lake Shore Drivescore 87
Multifamily Housing · 1,647,872 sq ft
See also: most efficient in Chicago · biggest emitters
How does Thorek Memorial Hospital compare with other hospital (general medical & surgical) buildings in Chicago?
The latest disclosures cover 25 hospital (general medical & surgical) buildings in Chicago, out of 3,852 buildings citywide. Thorek Memorial Hospital's ENERGY STAR score of 88 compares with an average of 56 across the 21 that report a score; it scores higher than 76% of them and lower than 14%. Its site EUI of 199.9 kBtu/ft² is about 13% below the average of 229.9 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 17.8 kgCO₂e/ft² is about 13% below the group average of 20.4 kgCO₂e/ft².
At 205,000 sq ft, it is about 78% below the average floor area of 920,964 sq ft for those buildings. It was built in 1981, 15 years later than the group's average year built (1967). Across all 24 jurisdictions BuildingCensus covers, the 748 hospital (general medical & surgical) buildings average an ENERGY STAR score of 59 and a site EUI of 238.7 kBtu/ft².
How has Thorek Memorial Hospital's energy performance changed over time?
BuildingCensus holds 9 Chicago disclosures for Thorek Memorial Hospital, covering report years 2015–2023. Its ENERGY STAR score went from 97 in 2015 to 88 in 2023 (-9 points); its best year on file was 2018, at 98. Site EUI moved from 156.0 kBtu/ft² (2015) to 199.9 kBtu/ft² (2023), an 28% increase. Reported emissions went from 3,896 tCO₂e to 3,641 tCO₂e over the same span (down 7%).
What does an ENERGY STAR score of 88 mean?
ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 88 means the building performs better than about 88% of its national peers. BuildingCensus bands the score into report-card grades; 88 falls in band A — high performer (85–100). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In Chicago, 35% of scored buildings are at 75 or above.
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Thorek Memorial Hospital's 199.9 kBtu/ft² across 205,000 sq ft works out to about 41 billion Btu (12,010 MWh-equivalent) in 2023. Its source EUI of 353.9 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 4,943,416 kWh of electricity and 241,125 therms of natural gas for the year.
Which law requires Thorek Memorial Hospital to report its energy use?
Thorek Memorial Hospital reports under the Building Energy Use Benchmarking Ordinance, the legal basis of the Chicago Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2023 disclosure (source record chicago:164922:2023). Covered buildings that fail to benchmark and report face fines of up to $100 plus $25 per day of violation under the ordinance.
More hospital (general medical & surgical) buildings in Chicago
- Shriners Hospital for Children-Chicago· 196,466 sq ft · score 61 (C)
- Hospital (General Medical & Surgical) buildings in Chicago· 25 benchmarked
- All Chicago benchmarked buildings· Building Energy Use Benchmarking Ordinance
- Most efficient large buildings in Chicago
- Least efficient large buildings in Chicago
- Biggest emitters in Chicago
Frequently asked questions
What is Thorek Memorial Hospital's energy grade?
Thorek Memorial Hospital scores 88 out of 100 on ENERGY STAR — band A, high performer (85–100) — in its 2023 Chicago disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.
How much energy does Thorek Memorial Hospital use?
Its 2023 site energy-use intensity was 199.9 kBtu/ft² (353.9 kBtu/ft² source) across 205,000 sq ft, including 4,943,416 kWh of electricity and 241,125 therms of natural gas.
What are Thorek Memorial Hospital's carbon emissions?
Thorek Memorial Hospital reported 3,641 tCO₂e of greenhouse-gas emissions (17.8 kgCO₂e/ft²) for 2023.
Where is Thorek Memorial Hospital?
Thorek Memorial Hospital is at 850 W. Irving Park Rd, in Chicago, Illinois 60613. Its coordinates are 41.88927, -87.62973 (latitude, longitude), as published in the Chicago Energy Benchmarking file.
How big is Thorek Memorial Hospital and when was it built?
Thorek Memorial Hospital has 205,000 sq ft of gross floor area, as reported in its 2023 disclosure. The disclosure lists 1981 as its year built. It is classed as hospital (general medical & surgical).
Is Thorek Memorial Hospital covered by the Building Energy Use Benchmarking Ordinance?
Yes — it appears in the 2023 Chicago Energy Benchmarking disclosure, which lists the buildings reporting under the Building Energy Use Benchmarking Ordinance.
Working with Chicago building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Chicago Energy Benchmarking (Building Energy Use Benchmarking Ordinance), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Thorek Memorial Hospital, Chicago, Illinois — 2023 benchmarking disclosure”, https://buildingcensus.com/buildings/chicago/thorek-memorial-hospital-1bdb7306 (data as of October 2, 2026).