BuildingCensus
–

SBRI

Laboratory in Chicago, IL · 5812 S Ellis Ave · 60637

At a glance

SBRI is a 214,708-square-foot laboratory building at 5812 S Ellis Ave in Chicago, Illinois, built in 1977. In its 2019 Chicago benchmarking disclosure it reported a site energy-use intensity of 381.5 kBtu/ft² and 9,374 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2019
Site EUI
381.5
kBtu/ft²
GHG emissions
9,374
tCO₂e
GHG intensity
43.7
kgCO₂e/ft²
Floor area
214,708
sq ft
Year built
1977
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

Building Energy Use Benchmarking Ordinance · reporting year 2019

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI381.5 kBtu/ft²
Source EUI751.8 kBtu/ft²
GHG emissions9,374 tCO₂e
GHG intensity43.7 kgCO₂e/ft²
Electricity11,538,211 kWh
Natural gas51 therms
Gross floor area214,708 sq ft
Source recordchicago:251948:2019

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2019latest—381.5 kBtu/ft²9,374 tCO₂e
2018—409.3 kBtu/ft²10,054 tCO₂e
2017—446.0 kBtu/ft²11,724 tCO₂e
2016—444.6 kBtu/ft²12,090 tCO₂e
2015—409.2 kBtu/ft²11,755 tCO₂e

Compliance context

Building Energy Use Benchmarking Ordinance

Covered buildings that fail to benchmark and report face fines of up to $100 plus $25 per day of violation under the ordinance.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
5812 S Ellis Ave
State
Illinois
ZIP
60637
Coordinates
41.79001, -87.60128

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Chicago · biggest emitters

How does SBRI compare with other laboratory buildings in Chicago?

The latest disclosures cover 32 laboratory buildings in Chicago, out of 3,852 buildings citywide. Its site EUI of 381.5 kBtu/ft² is about 35% above the average of 282.4 kBtu/ft² — it uses more energy per square foot than the typical building in that group. Its emissions intensity of 43.7 kgCO₂e/ft² is about 64% above the group average of 26.7 kgCO₂e/ft².

At 214,708 sq ft, it is about 20% above the average floor area of 179,276 sq ft for those buildings. It was built in 1977, 15 years later than the group's average year built (1962). Across all 24 jurisdictions BuildingCensus covers, the 795 laboratory buildings average an ENERGY STAR score of 29 and a site EUI of 231.7 kBtu/ft².

How has SBRI's energy performance changed over time?

BuildingCensus holds 5 Chicago disclosures for SBRI, covering report years 2015–2019. Site EUI moved from 409.2 kBtu/ft² (2015) to 381.5 kBtu/ft² (2019), a 7% decrease. Reported emissions went from 11,755 tCO₂e to 9,374 tCO₂e over the same span (down 20%).

What does a site EUI of 381.5 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. SBRI's 381.5 kBtu/ft² across 214,708 sq ft works out to about 81.9 billion Btu (24,006 MWh-equivalent) in 2019. Its source EUI of 751.8 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 11,538,211 kWh of electricity and 51 therms of natural gas for the year.

Which law requires SBRI to report its energy use?

SBRI reports under the Building Energy Use Benchmarking Ordinance, the legal basis of the Chicago Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2019 disclosure (source record chicago:251948:2019). Covered buildings that fail to benchmark and report face fines of up to $100 plus $25 per day of violation under the ordinance.

More laboratory buildings in Chicago

Frequently asked questions

What is SBRI's energy grade?

SBRI did not report an ENERGY STAR score in its 2019 disclosure, but its site energy-use intensity was 381.5 kBtu/ft².

How much energy does SBRI use?

Its 2019 site energy-use intensity was 381.5 kBtu/ft² (751.8 kBtu/ft² source) across 214,708 sq ft, including 11,538,211 kWh of electricity and 51 therms of natural gas.

What are SBRI's carbon emissions?

SBRI reported 9,374 tCO₂e of greenhouse-gas emissions (43.7 kgCO₂e/ft²) for 2019.

Where is SBRI?

SBRI is at 5812 S Ellis Ave, in Chicago, Illinois 60637. Its coordinates are 41.79001, -87.60128 (latitude, longitude), as published in the Chicago Energy Benchmarking file.

How big is SBRI and when was it built?

SBRI has 214,708 sq ft of gross floor area, as reported in its 2019 disclosure. The disclosure lists 1977 as its year built. It is classed as laboratory.

Is SBRI covered by the Building Energy Use Benchmarking Ordinance?

Yes — it appears in the 2019 Chicago Energy Benchmarking disclosure, which lists the buildings reporting under the Building Energy Use Benchmarking Ordinance.

Working with Chicago building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Chicago Energy Benchmarking (Building Energy Use Benchmarking Ordinance), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “SBRI, Chicago, Illinois — 2019 benchmarking disclosure”, https://buildingcensus.com/buildings/chicago/sbri-8b9bead7 (data as of October 2, 2026).