BuildingCensus
C

Pacific Coast Supply, Llc Dba Pacific Supply

Distribution Center in Denver, CO · 500 West Wesley Ave. · 80223

At a glance

Pacific Coast Supply, Llc Dba Pacific Supply is a 37,500-square-foot distribution center at 500 West Wesley Ave. in Denver, Colorado, built in 1976. In its 2023 Denver benchmarking disclosure it reported an ENERGY STAR score of 58 out of 100 (grade C), a site energy-use intensity of 25.2 kBtu/ft² and 85 tCO₂e of greenhouse-gas emissions. That score is higher than 37% of the 139 scored distribution center buildings in Denver.

ENERGY STAR score
58
band C · 2023
Site EUI
25.2
kBtu/ft²
GHG emissions
85
tCO₂e
GHG intensity
—
kgCO₂e/ft²
Floor area
37,500
sq ft
Year built
1976
vintage

Energize Denver Building Performance Policy · reporting year 2023

Benchmarking record

FieldValue
ENERGY STAR score58 (band C)
Site EUI25.2 kBtu/ft²
Source EUI—
GHG emissions85 tCO₂e
GHG intensity—
Electricity101,039 kWh
Natural gas5,985 therms
Gross floor area37,500 sq ft
Source recorddenver:3824:2023

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2023latest58-125.2 kBtu/ft²85 tCO₂e
202259-126.4 kBtu/ft²85 tCO₂e
20216025.3 kBtu/ft²85 tCO₂e

Compliance context

Energize Denver Building Performance Policy

Energize Denver sets energy-use (EUI) targets for buildings of 25,000+ sq ft — for most buildings an interim target in 2028 and a final target in 2032 — with civil penalties of roughly $0.15–0.35 per kBtu over target for non-compliance.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
500 West Wesley Ave.
City
Denver
State
Colorado
ZIP
80223

Within ~1 km

Nearby benchmarked buildings

This source publishes no coordinates, so nearby buildings can't be resolved yet.

See also: most efficient in Denver · biggest emitters

How does Pacific Coast Supply, Llc Dba Pacific Supply compare with other distribution center buildings in Denver?

The latest disclosures cover 188 distribution center buildings in Denver, out of 3,287 buildings citywide. Pacific Coast Supply, Llc Dba Pacific Supply's ENERGY STAR score of 58 compares with an average of 61 across the 139 that report a score; it scores higher than 37% of them and lower than 61%. Its site EUI of 25.2 kBtu/ft² is about half of the average of 48.4 kBtu/ft² — it uses less energy per square foot than the typical building in that group.

At 37,500 sq ft, it is about 64% below the average floor area of 103,624 sq ft for those buildings. It was built in 1976, 4 years earlier than the group's average year built (1980). Across all 24 jurisdictions BuildingCensus covers, the 4,082 distribution center buildings average an ENERGY STAR score of 65 and a site EUI of 24.2 kBtu/ft².

How has Pacific Coast Supply, Llc Dba Pacific Supply's energy performance changed over time?

BuildingCensus holds 3 Denver disclosures for Pacific Coast Supply, Llc Dba Pacific Supply, covering report years 2021–2023. Its ENERGY STAR score went from 60 in 2021 to 58 in 2023 (-2 points); its best year on file was 2021, at 60. Site EUI moved from 25.3 kBtu/ft² (2021) to 25.2 kBtu/ft² (2023), a 0% decrease. Reported emissions went from 85 tCO₂e to 85 tCO₂e over the same span (up 0%).

What does an ENERGY STAR score of 58 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 58 means the building performs better than about 58% of its national peers. BuildingCensus bands the score into report-card grades; 58 falls in band C — below median (55–69). It sits 17 points below 75, the threshold for ENERGY STAR certification. In Denver, 54% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Pacific Coast Supply, Llc Dba Pacific Supply's 25.2 kBtu/ft² across 37,500 sq ft works out to about 0.9 billion Btu (277 MWh-equivalent) in 2023. The disclosure also reports 101,039 kWh of electricity and 5,985 therms of natural gas for the year.

Which law requires Pacific Coast Supply, Llc Dba Pacific Supply to report its energy use?

Pacific Coast Supply, Llc Dba Pacific Supply reports under the Energize Denver Building Performance Policy, the legal basis of Denver's Energize Denver Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2023 disclosure (source record denver:3824:2023). Energize Denver sets energy-use (EUI) targets for buildings of 25,000+ sq ft — for most buildings an interim target in 2028 and a final target in 2032 — with civil penalties of roughly $0.15–0.35 per kBtu over target for non-compliance.

More distribution center buildings in Denver

Frequently asked questions

What is Pacific Coast Supply, Llc Dba Pacific Supply's energy grade?

Pacific Coast Supply, Llc Dba Pacific Supply scores 58 out of 100 on ENERGY STAR — band C, below median (55–69) — in its 2023 Denver disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does Pacific Coast Supply, Llc Dba Pacific Supply use?

Its 2023 site energy-use intensity was 25.2 kBtu/ft² across 37,500 sq ft, including 101,039 kWh of electricity and 5,985 therms of natural gas.

What are Pacific Coast Supply, Llc Dba Pacific Supply's carbon emissions?

Pacific Coast Supply, Llc Dba Pacific Supply reported 85 tCO₂e of greenhouse-gas emissions for 2023.

Where is Pacific Coast Supply, Llc Dba Pacific Supply?

Pacific Coast Supply, Llc Dba Pacific Supply is at 500 West Wesley Ave., in Denver, Colorado 80223.

How big is Pacific Coast Supply, Llc Dba Pacific Supply and when was it built?

Pacific Coast Supply, Llc Dba Pacific Supply has 37,500 sq ft of gross floor area, as reported in its 2023 disclosure. The disclosure lists 1976 as its year built. It is classed as distribution center.

Is Pacific Coast Supply, Llc Dba Pacific Supply covered by the Energize Denver Building Performance Policy?

Yes — it appears in the 2023 Energize Denver Benchmarking disclosure, which lists the buildings reporting under the Energize Denver Building Performance Policy.

Working with Denver building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Energize Denver Benchmarking (Energize Denver Building Performance Policy), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Pacific Coast Supply, Llc Dba Pacific Supply, Denver, Colorado — 2023 benchmarking disclosure”, https://buildingcensus.com/buildings/denver/pacific-coast-supply-llc-dba-pacific-supply-5a78aa28 (data as of July 9, 2026).