BuildingCensus
D

DEP > BWT_9614_Port Richmond WPCP Campus

Wastewater Treatment Plant in New York City, NY · 1801 Richmond Ter · 10310

At a glance

DEP > BWT_9614_Port Richmond WPCP Campus is a 358,539-square-foot wastewater treatment plant at 1801 Richmond Ter in New York City, New York, built in 1953. In its 2024 New York City benchmarking disclosure it reported an ENERGY STAR score of 28 out of 100 (grade D), a site energy-use intensity of 307.8 kBtu/ft² and 10,223 tCO₂e of greenhouse-gas emissions. That score is higher than 36% of the 14 scored wastewater treatment plant buildings in New York City.

ENERGY STAR score
28
band D · 2024
Site EUI
307.8
kBtu/ft²
GHG emissions
10,223
tCO₂e
GHG intensity
28.5
kgCO₂e/ft²
Floor area
358,539
sq ft
Year built
1953
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

Local Law 84 (LL84) · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score28 (band D)
Site EUI307.8 kBtu/ft²
Source EUI641.7 kBtu/ft²
GHG emissions10,223 tCO₂e
GHG intensity28.5 kgCO₂e/ft²
Electricity19,167,959 kWh
Natural gas397,057 therms
Water use160,851 kgal
Gross floor area358,539 sq ft
Source recordnyc:21355916:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest28-20307.8 kBtu/ft²10,223 tCO₂e
202348-13237.6 kBtu/ft²8,613 tCO₂e
202261325.8 kBtu/ft²8,641 tCO₂e

Compliance context

Local Law 84 (LL84)

Under Local Law 97, buildings over 25,000 sq ft face carbon caps with fines of $268 per metric ton of CO₂e over the limit, phasing in from 2024.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
1801 Richmond Ter
State
New York
ZIP
10310
Coordinates
40.63723, -74.12556

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in New York City · biggest emitters

How does DEP > BWT_9614_Port Richmond WPCP Campus compare with other wastewater treatment plant buildings in New York City?

The latest disclosures cover 14 wastewater treatment plant buildings in New York City, out of 48,310 buildings citywide. DEP > BWT_9614_Port Richmond WPCP Campus's ENERGY STAR score of 28 compares with an average of 38 across the 14 that report a score; it scores higher than 36% of them and lower than 57%. Its site EUI of 307.8 kBtu/ft² is about 16% below the average of 364.3 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 28.5 kgCO₂e/ft² is about 20% below the group average of 35.8 kgCO₂e/ft².

At 358,539 sq ft, it is about half of the average floor area of 685,694 sq ft for those buildings. Its 1953 construction date is close to the group's average year built (1952). Across all 24 jurisdictions BuildingCensus covers, the 24 wastewater treatment plant buildings average an ENERGY STAR score of 41 and a site EUI of 373.7 kBtu/ft².

How has DEP > BWT_9614_Port Richmond WPCP Campus's energy performance changed over time?

BuildingCensus holds 3 New York City disclosures for DEP > BWT_9614_Port Richmond WPCP Campus, covering report years 2022–2024. Its ENERGY STAR score went from 61 in 2022 to 28 in 2024 (-33 points); its best year on file was 2022, at 61. Site EUI moved from 325.8 kBtu/ft² (2022) to 307.8 kBtu/ft² (2024), a 6% decrease. Reported emissions went from 8,641 tCO₂e to 10,223 tCO₂e over the same span (up 18%).

What does an ENERGY STAR score of 28 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 28 means the building performs better than about 28% of its national peers. BuildingCensus bands the score into report-card grades; 28 falls in band D — lowest band (1–54). It sits 47 points below 75, the threshold for ENERGY STAR certification. In New York City, 43% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. DEP > BWT_9614_Port Richmond WPCP Campus's 307.8 kBtu/ft² across 358,539 sq ft works out to about 110.4 billion Btu (32,343 MWh-equivalent) in 2024. Its source EUI of 641.7 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 19,167,959 kWh of electricity, 397,057 therms of natural gas and 160,851 thousand gallons of water for the year.

Which law requires DEP > BWT_9614_Port Richmond WPCP Campus to report its energy use?

DEP > BWT_9614_Port Richmond WPCP Campus reports under Local Law 84 (LL84), the legal basis of New York City's Energy and Water Data Disclosure program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record nyc:21355916:2024). Under Local Law 97, buildings over 25,000 sq ft face carbon caps with fines of $268 per metric ton of CO₂e over the limit, phasing in from 2024.

More wastewater treatment plant buildings in New York City

Frequently asked questions

What is DEP > BWT_9614_Port Richmond WPCP Campus's energy grade?

DEP > BWT_9614_Port Richmond WPCP Campus scores 28 out of 100 on ENERGY STAR — band D, lowest band (1–54) — in its 2024 New York City disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does DEP > BWT_9614_Port Richmond WPCP Campus use?

Its 2024 site energy-use intensity was 307.8 kBtu/ft² (641.7 kBtu/ft² source) across 358,539 sq ft, including 19,167,959 kWh of electricity and 397,057 therms of natural gas.

What are DEP > BWT_9614_Port Richmond WPCP Campus's carbon emissions?

DEP > BWT_9614_Port Richmond WPCP Campus reported 10,223 tCO₂e of greenhouse-gas emissions (28.5 kgCO₂e/ft²) for 2024.

Where is DEP > BWT_9614_Port Richmond WPCP Campus?

DEP > BWT_9614_Port Richmond WPCP Campus is at 1801 Richmond Ter, in New York City, New York 10310. Its coordinates are 40.63723, -74.12556 (latitude, longitude), as published in the Energy and Water Data Disclosure file.

How big is DEP > BWT_9614_Port Richmond WPCP Campus and when was it built?

DEP > BWT_9614_Port Richmond WPCP Campus has 358,539 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1953 as its year built. It is classed as wastewater treatment plant.

Is DEP > BWT_9614_Port Richmond WPCP Campus covered by Local Law 84 (LL84)?

Yes — it appears in the 2024 Energy and Water Data Disclosure disclosure, which lists the buildings reporting under Local Law 84 (LL84).

Working with New York City building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Energy and Water Data Disclosure (Local Law 84 (LL84)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “DEP > BWT_9614_Port Richmond WPCP Campus, New York City, New York — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/new-york-city/dep-bwt-9614-port-richmond-wpcp-campus-7dc52d9e (data as of October 2, 2026).