BuildingCensus
–

Red Hook Terminal - Primary Lot

Transportation Terminal/Station in New York City, NY · 70 Columbia St. · 11201

At a glance

Red Hook Terminal - Primary Lot is a 721,396-square-foot transportation terminal/station at 70 Columbia St. in New York City, New York, built in 1931. In its 2024 New York City benchmarking disclosure it reported a site energy-use intensity of 12.6 kBtu/ft² and 962 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2024
Site EUI
12.6
kBtu/ft²
GHG emissions
962
tCO₂e
GHG intensity
1.3
kgCO₂e/ft²
Floor area
721,396
sq ft
Year built
1931
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

Local Law 84 (LL84) · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI12.6 kBtu/ft²
Source EUI32.0 kBtu/ft²
GHG emissions962 tCO₂e
GHG intensity1.3 kgCO₂e/ft²
Electricity2,269,788 kWh
Natural gas13,349 therms
Gross floor area721,396 sq ft
Source recordnyc:26238781:2024

Compliance context

Local Law 84 (LL84)

Under Local Law 97, buildings over 25,000 sq ft face carbon caps with fines of $268 per metric ton of CO₂e over the limit, phasing in from 2024.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
70 Columbia St.
State
New York
ZIP
11201
Coordinates
40.68934, -74.00064

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in New York City · biggest emitters

How does Red Hook Terminal - Primary Lot compare with other transportation terminal/station buildings in New York City?

The latest disclosures cover 16 transportation terminal/station buildings in New York City, out of 48,310 buildings citywide. Its site EUI of 12.6 kBtu/ft² is about 84% below the average of 80.8 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 1.3 kgCO₂e/ft² is about 80% below the group average of 6.5 kgCO₂e/ft².

At 721,396 sq ft, it is about 441% above the average floor area of 133,361 sq ft for those buildings. It was built in 1931, 37 years earlier than the group's average year built (1968). Across all 24 jurisdictions BuildingCensus covers, the 103 transportation terminal/station buildings average an ENERGY STAR score of 4 and a site EUI of 105.1 kBtu/ft².

What does a site EUI of 12.6 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Red Hook Terminal - Primary Lot's 12.6 kBtu/ft² across 721,396 sq ft works out to about 9.1 billion Btu (2,664 MWh-equivalent) in 2024. Its source EUI of 32.0 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 2,269,788 kWh of electricity and 13,349 therms of natural gas for the year.

Which law requires Red Hook Terminal - Primary Lot to report its energy use?

Red Hook Terminal - Primary Lot reports under Local Law 84 (LL84), the legal basis of New York City's Energy and Water Data Disclosure program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record nyc:26238781:2024). Under Local Law 97, buildings over 25,000 sq ft face carbon caps with fines of $268 per metric ton of CO₂e over the limit, phasing in from 2024.

More transportation terminal/station buildings in New York City

Frequently asked questions

What is Red Hook Terminal - Primary Lot's energy grade?

Red Hook Terminal - Primary Lot did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 12.6 kBtu/ft².

How much energy does Red Hook Terminal - Primary Lot use?

Its 2024 site energy-use intensity was 12.6 kBtu/ft² (32.0 kBtu/ft² source) across 721,396 sq ft, including 2,269,788 kWh of electricity and 13,349 therms of natural gas.

What are Red Hook Terminal - Primary Lot's carbon emissions?

Red Hook Terminal - Primary Lot reported 962 tCO₂e of greenhouse-gas emissions (1.3 kgCO₂e/ft²) for 2024.

Where is Red Hook Terminal - Primary Lot?

Red Hook Terminal - Primary Lot is at 70 Columbia St., in New York City, New York 11201. Its coordinates are 40.68934, -74.00064 (latitude, longitude), as published in the Energy and Water Data Disclosure file.

How big is Red Hook Terminal - Primary Lot and when was it built?

Red Hook Terminal - Primary Lot has 721,396 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1931 as its year built. It is classed as transportation terminal/station.

Is Red Hook Terminal - Primary Lot covered by Local Law 84 (LL84)?

Yes — it appears in the 2024 Energy and Water Data Disclosure disclosure, which lists the buildings reporting under Local Law 84 (LL84).

Working with New York City building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Energy and Water Data Disclosure (Local Law 84 (LL84)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Red Hook Terminal - Primary Lot, New York City, New York — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/new-york-city/red-hook-terminal-primary-lot-60524e7e (data as of October 2, 2026).