10-32 Harry Agganis Way
Stadium (Open) in Boston, MA · 2215.
At a glance
10-32 Harry Agganis Way is a 38,077-square-foot stadium (open) building in Boston, Massachusetts. In its 2024 Boston benchmarking disclosure it reported a site energy-use intensity of 47.7 kBtu/ft² and 101 tCO₂e of greenhouse-gas emissions.
BERDO 2.0 · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 47.7 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 101 tCO₂e |
| GHG intensity | — |
| Electricity | 326,648 kWh |
| Natural gas | 6,999 therms |
| Gross floor area | 38,077 sq ft |
| Source record | boston:101272:2024 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2024latest | — | 47.7 kBtu/ft² | 101 tCO₂e | |
| 2023 | — | 53.7 kBtu/ft² | 116 tCO₂e | |
| 2022 | — | 58.2 kBtu/ft² | 144 tCO₂e |
Compliance context
BERDO 2.0
BERDO 2.0 sets emissions standards for buildings of 20,000+ sq ft or 15+ units, starting in 2025 or 2030 depending on building size, with an alternative-compliance payment of $234 per metric ton of CO₂e over the limit.
Ownership
TRUSTEES OF BOSTON UNIVERSITY
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 10-32 Harry Agganis Way
- City
- Boston
- State
- Massachusetts
- ZIP
- 2215.
Within ~1 km
Nearby benchmarked buildings
This source publishes no coordinates, so nearby buildings can't be resolved yet.
See also: most efficient in Boston · biggest emitters
How does 10-32 Harry Agganis Way compare with other buildings in Boston?
The latest disclosures cover 6,305 benchmarked buildings in Boston. Its site EUI of 47.7 kBtu/ft² is about 38% below the average of 76.4 kBtu/ft² — it uses less energy per square foot than the typical building in that group.
At 38,077 sq ft, it is about 63% below the average floor area of 102,357 sq ft for those buildings.
How has 10-32 Harry Agganis Way's energy performance changed over time?
BuildingCensus holds 3 Boston disclosures for 10-32 Harry Agganis Way, covering report years 2022–2024. Site EUI moved from 58.2 kBtu/ft² (2022) to 47.7 kBtu/ft² (2024), a 18% decrease. Reported emissions went from 144 tCO₂e to 101 tCO₂e over the same span (down 30%).
What does a site EUI of 47.7 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. 10-32 Harry Agganis Way's 47.7 kBtu/ft² across 38,077 sq ft works out to about 1.8 billion Btu (532 MWh-equivalent) in 2024. The disclosure also reports 326,648 kWh of electricity and 6,999 therms of natural gas for the year.
Which law requires 10-32 Harry Agganis Way to report its energy use?
10-32 Harry Agganis Way reports under BERDO 2.0, the legal basis of Boston's Building Emissions Reduction and Disclosure Ordinance, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record boston:101272:2024). BERDO 2.0 sets emissions standards for buildings of 20,000+ sq ft or 15+ units, starting in 2025 or 2030 depending on building size, with an alternative-compliance payment of $234 per metric ton of CO₂e over the limit.
More stadium (open) buildings in Boston
Frequently asked questions
What is 10-32 Harry Agganis Way's energy grade?
10-32 Harry Agganis Way did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 47.7 kBtu/ft².
How much energy does 10-32 Harry Agganis Way use?
Its 2024 site energy-use intensity was 47.7 kBtu/ft² across 38,077 sq ft, including 326,648 kWh of electricity and 6,999 therms of natural gas.
What are 10-32 Harry Agganis Way's carbon emissions?
10-32 Harry Agganis Way reported 101 tCO₂e of greenhouse-gas emissions for 2024.
Where is 10-32 Harry Agganis Way?
10-32 Harry Agganis Way is in Boston, Massachusetts 2215.
How big is 10-32 Harry Agganis Way and when was it built?
10-32 Harry Agganis Way has 38,077 sq ft of gross floor area, as reported in its 2024 disclosure. It is classed as stadium (open).
Is 10-32 Harry Agganis Way covered by BERDO 2.0?
Yes — it appears in the 2024 Building Emissions Reduction and Disclosure Ordinance disclosure, which lists the buildings reporting under BERDO 2.0.
Working with Boston building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Emissions Reduction and Disclosure Ordinance (BERDO 2.0), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “10-32 Harry Agganis Way, Boston, Massachusetts — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/boston/10-32-harry-agganis-way-777a48ac (data as of July 9, 2026).