BuildingCensus
D

130 Louder'S Ln

K-12 School in Boston, MA · 2130.

At a glance

130 Louder'S Ln is a 17,391-square-foot K-12 school in Boston, Massachusetts. In its 2024 Boston benchmarking disclosure it reported an ENERGY STAR score of 22 out of 100 (grade D), a site energy-use intensity of 104.6 kBtu/ft² and 98 tCO₂e of greenhouse-gas emissions. That score is higher than 9% of the 163 scored K-12 school buildings in Boston.

ENERGY STAR score
22
band D · 2024
Site EUI
104.6
kBtu/ft²
GHG emissions
98
tCO₂e
GHG intensity
—
kgCO₂e/ft²
Floor area
17,391
sq ft
Year built
—
vintage

BERDO 2.0 · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score22 (band D)
Site EUI104.6 kBtu/ft²
Source EUI—
GHG emissions98 tCO₂e
GHG intensity—
Electricity100,794 kWh
Natural gas14,748 therms
Gross floor area17,391 sq ft
Source recordboston:102111:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest22-4104.6 kBtu/ft²98 tCO₂e
202326+296.0 kBtu/ft²91 tCO₂e
202224105.7 kBtu/ft²107 tCO₂e

Compliance context

BERDO 2.0

BERDO 2.0 sets emissions standards for buildings of 20,000+ sq ft or 15+ units, starting in 2025 or 2030 depending on building size, with an alternative-compliance payment of $234 per metric ton of CO₂e over the limit.

Program details →

Ownership

CITY OF BOSTON

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
130 Louder'S Ln
City
Boston
State
Massachusetts
ZIP
2130.

Within ~1 km

Nearby benchmarked buildings

This source publishes no coordinates, so nearby buildings can't be resolved yet.

See also: most efficient in Boston · biggest emitters

How does 130 Louder'S Ln compare with other K-12 school buildings in Boston?

The latest disclosures cover 175 K-12 school buildings in Boston, out of 6,305 buildings citywide. 130 Louder'S Ln's ENERGY STAR score of 22 compares with an average of 59 across the 163 that report a score; it scores higher than 9% of them and lower than 90%. Its site EUI of 104.6 kBtu/ft² is about 62% above the average of 64.5 kBtu/ft² — it uses more energy per square foot than the typical building in that group.

At 17,391 sq ft, it is about 79% below the average floor area of 83,066 sq ft for those buildings. Across all 24 jurisdictions BuildingCensus covers, the 6,548 K-12 school buildings average an ENERGY STAR score of 64 and a site EUI of 52.7 kBtu/ft².

How has 130 Louder'S Ln's energy performance changed over time?

BuildingCensus holds 3 Boston disclosures for 130 Louder'S Ln, covering report years 2022–2024. Its ENERGY STAR score went from 24 in 2022 to 22 in 2024 (-2 points); its best year on file was 2023, at 26. Site EUI moved from 105.7 kBtu/ft² (2022) to 104.6 kBtu/ft² (2024), a 1% decrease. Reported emissions went from 107 tCO₂e to 98 tCO₂e over the same span (down 8%).

What does an ENERGY STAR score of 22 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 22 means the building performs better than about 22% of its national peers. BuildingCensus bands the score into report-card grades; 22 falls in band D — lowest band (1–54). It sits 53 points below 75, the threshold for ENERGY STAR certification. In Boston, 52% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. 130 Louder'S Ln's 104.6 kBtu/ft² across 17,391 sq ft works out to about 1.8 billion Btu (533 MWh-equivalent) in 2024. The disclosure also reports 100,794 kWh of electricity and 14,748 therms of natural gas for the year.

Which law requires 130 Louder'S Ln to report its energy use?

130 Louder'S Ln reports under BERDO 2.0, the legal basis of Boston's Building Emissions Reduction and Disclosure Ordinance, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record boston:102111:2024). BERDO 2.0 sets emissions standards for buildings of 20,000+ sq ft or 15+ units, starting in 2025 or 2030 depending on building size, with an alternative-compliance payment of $234 per metric ton of CO₂e over the limit.

More K-12 school buildings in Boston

Frequently asked questions

What is 130 Louder'S Ln's energy grade?

130 Louder'S Ln scores 22 out of 100 on ENERGY STAR — band D, lowest band (1–54) — in its 2024 Boston disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does 130 Louder'S Ln use?

Its 2024 site energy-use intensity was 104.6 kBtu/ft² across 17,391 sq ft, including 100,794 kWh of electricity and 14,748 therms of natural gas.

What are 130 Louder'S Ln's carbon emissions?

130 Louder'S Ln reported 98 tCO₂e of greenhouse-gas emissions for 2024.

Where is 130 Louder'S Ln?

130 Louder'S Ln is in Boston, Massachusetts 2130.

How big is 130 Louder'S Ln and when was it built?

130 Louder'S Ln has 17,391 sq ft of gross floor area, as reported in its 2024 disclosure. It is classed as K-12 school.

Is 130 Louder'S Ln covered by BERDO 2.0?

Yes — it appears in the 2024 Building Emissions Reduction and Disclosure Ordinance disclosure, which lists the buildings reporting under BERDO 2.0.

Working with Boston building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Emissions Reduction and Disclosure Ordinance (BERDO 2.0), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “130 Louder'S Ln, Boston, Massachusetts — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/boston/130-louder-s-ln-33bc12f4 (data as of July 9, 2026).