BuildingCensus
–

723 Harvard St Mount Hope Cemetery Maintenance Building

Vehicle Repair Services in Boston, MA · 2131.

At a glance

723 Harvard St Mount Hope Cemetery Maintenance Building is a 2,000-square-foot vehicle repair services building in Boston, Massachusetts. In its 2024 Boston benchmarking disclosure it reported a site energy-use intensity of 188.8 kBtu/ft² and 27 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2024
Site EUI
188.8
kBtu/ft²
GHG emissions
27
tCO₂e
GHG intensity
—
kgCO₂e/ft²
Floor area
2,000
sq ft
Year built
—
vintage

BERDO 2.0 · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI188.8 kBtu/ft²
Source EUI—
GHG emissions27 tCO₂e
GHG intensity—
Electricity24,837 kWh
Gross floor area2,000 sq ft
Source recordboston:106963:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest—188.8 kBtu/ft²27 tCO₂e
2023—199.8 kBtu/ft²29 tCO₂e
2022—182.3 kBtu/ft²27 tCO₂e

Compliance context

BERDO 2.0

BERDO 2.0 sets emissions standards for buildings of 20,000+ sq ft or 15+ units, starting in 2025 or 2030 depending on building size, with an alternative-compliance payment of $234 per metric ton of CO₂e over the limit.

Program details →

Ownership

CITY OF BOSTON

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
723 Harvard St Mount Hope Cemetery Maintenance Building
City
Boston
State
Massachusetts
ZIP
2131.

Within ~1 km

Nearby benchmarked buildings

This source publishes no coordinates, so nearby buildings can't be resolved yet.

See also: most efficient in Boston · biggest emitters

How does 723 Harvard St Mount Hope Cemetery Maintenance Building compare with other vehicle repair services buildings in Boston?

The latest disclosures cover 37 vehicle repair services buildings in Boston, out of 6,305 buildings citywide. Its site EUI of 188.8 kBtu/ft² is about 122% above the average of 85.0 kBtu/ft² — it uses more energy per square foot than the typical building in that group.

At 2,000 sq ft, it is about 95% below the average floor area of 39,140 sq ft for those buildings.

How has 723 Harvard St Mount Hope Cemetery Maintenance Building's energy performance changed over time?

BuildingCensus holds 3 Boston disclosures for 723 Harvard St Mount Hope Cemetery Maintenance Building, covering report years 2022–2024. Site EUI moved from 182.3 kBtu/ft² (2022) to 188.8 kBtu/ft² (2024), an 4% increase. Reported emissions went from 27 tCO₂e to 27 tCO₂e over the same span (down 3%).

What does a site EUI of 188.8 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. 723 Harvard St Mount Hope Cemetery Maintenance Building's 188.8 kBtu/ft² across 2,000 sq ft works out to about 0.4 billion Btu (111 MWh-equivalent) in 2024. The disclosure also reports 24,837 kWh of electricity for the year.

Which law requires 723 Harvard St Mount Hope Cemetery Maintenance Building to report its energy use?

723 Harvard St Mount Hope Cemetery Maintenance Building reports under BERDO 2.0, the legal basis of Boston's Building Emissions Reduction and Disclosure Ordinance, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record boston:106963:2024). BERDO 2.0 sets emissions standards for buildings of 20,000+ sq ft or 15+ units, starting in 2025 or 2030 depending on building size, with an alternative-compliance payment of $234 per metric ton of CO₂e over the limit.

More vehicle repair services buildings in Boston

Frequently asked questions

What is 723 Harvard St Mount Hope Cemetery Maintenance Building's energy grade?

723 Harvard St Mount Hope Cemetery Maintenance Building did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 188.8 kBtu/ft².

How much energy does 723 Harvard St Mount Hope Cemetery Maintenance Building use?

Its 2024 site energy-use intensity was 188.8 kBtu/ft² across 2,000 sq ft, including 24,837 kWh of electricity.

What are 723 Harvard St Mount Hope Cemetery Maintenance Building's carbon emissions?

723 Harvard St Mount Hope Cemetery Maintenance Building reported 27 tCO₂e of greenhouse-gas emissions for 2024.

Where is 723 Harvard St Mount Hope Cemetery Maintenance Building?

723 Harvard St Mount Hope Cemetery Maintenance Building is in Boston, Massachusetts 2131.

How big is 723 Harvard St Mount Hope Cemetery Maintenance Building and when was it built?

723 Harvard St Mount Hope Cemetery Maintenance Building has 2,000 sq ft of gross floor area, as reported in its 2024 disclosure. It is classed as vehicle repair services.

Is 723 Harvard St Mount Hope Cemetery Maintenance Building covered by BERDO 2.0?

Yes — it appears in the 2024 Building Emissions Reduction and Disclosure Ordinance disclosure, which lists the buildings reporting under BERDO 2.0.

Working with Boston building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Emissions Reduction and Disclosure Ordinance (BERDO 2.0), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “723 Harvard St Mount Hope Cemetery Maintenance Building, Boston, Massachusetts — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/boston/723-harvard-st-mount-hope-cemetery-maintenance-building-2cccce9e (data as of July 9, 2026).