Jeffrey Modell Immunology Center
College/University in Boston, MA · 2115.
At a glance
Jeffrey Modell Immunology Center is a 7,000-square-foot college/university building in Boston, Massachusetts. In its 2024 Boston benchmarking disclosure it reported a site energy-use intensity of 238.6 kBtu/ft² and 97 tCO₂e of greenhouse-gas emissions.
BERDO 2.0 · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 238.6 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 97 tCO₂e |
| GHG intensity | — |
| Electricity | 93,908 kWh |
| Gross floor area | 7,000 sq ft |
| Source record | boston:107134:2024 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2024latest | — | 238.6 kBtu/ft² | 97 tCO₂e | |
| 2023 | — | 276.8 kBtu/ft² | 124 tCO₂e | |
| 2022 | — | 214.7 kBtu/ft² | 91 tCO₂e |
Compliance context
BERDO 2.0
BERDO 2.0 sets emissions standards for buildings of 20,000+ sq ft or 15+ units, starting in 2025 or 2030 depending on building size, with an alternative-compliance payment of $234 per metric ton of CO₂e over the limit.
Ownership
PRESIDENT AND FELLOWS OF HARVARD COLLEGE
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- Jeffrey Modell Immunology Center
- City
- Boston
- State
- Massachusetts
- ZIP
- 2115.
Within ~1 km
Nearby benchmarked buildings
This source publishes no coordinates, so nearby buildings can't be resolved yet.
See also: most efficient in Boston · biggest emitters
How does Jeffrey Modell Immunology Center compare with other college/university buildings in Boston?
The latest disclosures cover 316 college/university buildings in Boston, out of 6,305 buildings citywide. Its site EUI of 238.6 kBtu/ft² is about 175% above the average of 86.9 kBtu/ft² — it uses more energy per square foot than the typical building in that group.
At 7,000 sq ft, it is about 96% below the average floor area of 195,557 sq ft for those buildings. Across all 24 jurisdictions BuildingCensus covers, the 2,113 college/university buildings average an ENERGY STAR score of 68 and a site EUI of 98.7 kBtu/ft².
How has Jeffrey Modell Immunology Center's energy performance changed over time?
BuildingCensus holds 3 Boston disclosures for Jeffrey Modell Immunology Center, covering report years 2022–2024. Site EUI moved from 214.7 kBtu/ft² (2022) to 238.6 kBtu/ft² (2024), an 11% increase. Reported emissions went from 91 tCO₂e to 97 tCO₂e over the same span (up 7%).
What does a site EUI of 238.6 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Jeffrey Modell Immunology Center's 238.6 kBtu/ft² across 7,000 sq ft works out to about 1.7 billion Btu (489 MWh-equivalent) in 2024. The disclosure also reports 93,908 kWh of electricity for the year.
Which law requires Jeffrey Modell Immunology Center to report its energy use?
Jeffrey Modell Immunology Center reports under BERDO 2.0, the legal basis of Boston's Building Emissions Reduction and Disclosure Ordinance, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record boston:107134:2024). BERDO 2.0 sets emissions standards for buildings of 20,000+ sq ft or 15+ units, starting in 2025 or 2030 depending on building size, with an alternative-compliance payment of $234 per metric ton of CO₂e over the limit.
More college/university buildings in Boston
- 20 N Harvard St· 6,333 sq ft · EUI 50.8 kBtu/ft²
- 28 Harvard Way· 6,320 sq ft · EUI 54.4 kBtu/ft²
- 71 N Harvard St· 6,234 sq ft · EUI 176.7 kBtu/ft²
- 20 Harvard Way· 6,068 sq ft · EUI 27.0 kBtu/ft²
- 30 Harvard Way· 5,978 sq ft · EUI 64.4 kBtu/ft²
- 40 Harvard Way· 5,854 sq ft · EUI 65.4 kBtu/ft²
- College/University buildings in Boston· 316 benchmarked
- All Boston benchmarked buildings· BERDO 2.0
- Most efficient large buildings in Boston
- Least efficient large buildings in Boston
- Biggest emitters in Boston
Frequently asked questions
What is Jeffrey Modell Immunology Center's energy grade?
Jeffrey Modell Immunology Center did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 238.6 kBtu/ft².
How much energy does Jeffrey Modell Immunology Center use?
Its 2024 site energy-use intensity was 238.6 kBtu/ft² across 7,000 sq ft, including 93,908 kWh of electricity.
What are Jeffrey Modell Immunology Center's carbon emissions?
Jeffrey Modell Immunology Center reported 97 tCO₂e of greenhouse-gas emissions for 2024.
Where is Jeffrey Modell Immunology Center?
Jeffrey Modell Immunology Center is in Boston, Massachusetts 2115.
How big is Jeffrey Modell Immunology Center and when was it built?
Jeffrey Modell Immunology Center has 7,000 sq ft of gross floor area, as reported in its 2024 disclosure. It is classed as college/university.
Is Jeffrey Modell Immunology Center covered by BERDO 2.0?
Yes — it appears in the 2024 Building Emissions Reduction and Disclosure Ordinance disclosure, which lists the buildings reporting under BERDO 2.0.
Working with Boston building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Emissions Reduction and Disclosure Ordinance (BERDO 2.0), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Jeffrey Modell Immunology Center, Boston, Massachusetts — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/boston/jeffrey-modell-immunology-center-acdde70a (data as of July 9, 2026).