BuildingCensus
–

125 VASSAR ST

College/University in Cambridge, MA

At a glance

125 VASSAR ST is a 186,998-square-foot college/university building in Cambridge, Massachusetts, built in 1964. In its 2024 Cambridge benchmarking disclosure it reported 0 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2024
Site EUI
—
kBtu/ft²
GHG emissions
0
tCO₂e
GHG intensity
—
kgCO₂e/ft²
Floor area
186,998
sq ft
Year built
1964
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

BEUDO · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI—
Source EUI—
GHG emissions0 tCO₂e
GHG intensity—
Gross floor area186,998 sq ft
Source recordcambridge:B1095:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest——0 tCO₂e
2023——0 tCO₂e
2022——0 tCO₂e
2021——0 tCO₂e
2020—0.0 kBtu/ft²0 tCO₂e
2019—0.0 kBtu/ft²0 tCO₂e
2018—0.1 kBtu/ft²1 tCO₂e
2017—2.8 kBtu/ft²39 tCO₂e
2016—4.5 kBtu/ft²63 tCO₂e
2015—4.9 kBtu/ft²71 tCO₂e

Compliance context

BEUDO

Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).

Program details →

Ownership

MASSACHUSETTS INSTITUTE OF TECHNOLOGY

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
125 VASSAR ST
State
Massachusetts
Coordinates
42.35880, -71.09820

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Cambridge · biggest emitters

How does 125 VASSAR ST compare with other college/university buildings in Cambridge?

The latest disclosures cover 203 college/university buildings in Cambridge, out of 902 buildings citywide.

At 186,998 sq ft, it is about twice the average floor area of 96,964 sq ft for those buildings. It was built in 1964, 15 years later than the group's average year built (1949). Across all 24 jurisdictions BuildingCensus covers, the 2,113 college/university buildings average an ENERGY STAR score of 68 and a site EUI of 98.7 kBtu/ft².

How has 125 VASSAR ST's energy performance changed over time?

BuildingCensus holds 10 Cambridge disclosures for 125 VASSAR ST, covering report years 2015–2024. Site EUI moved from 4.9 kBtu/ft² (2015) to 0.0 kBtu/ft² (2020), a 100% decrease. Reported emissions went from 71 tCO₂e to 0 tCO₂e over the same span (down 100%).

Which law requires 125 VASSAR ST to report its energy use?

125 VASSAR ST reports under BEUDO, the legal basis of Cambridge's Building Energy Use Disclosure Ordinance (BEUDO), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record cambridge:B1095:2024). Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).

More college/university buildings in Cambridge

Frequently asked questions

What is 125 VASSAR ST's energy grade?

125 VASSAR ST did not report an ENERGY STAR score in its 2024 disclosure.

How much energy does 125 VASSAR ST use?

No energy-use intensity was reported for 2024.

What are 125 VASSAR ST's carbon emissions?

125 VASSAR ST reported 0 tCO₂e of greenhouse-gas emissions for 2024.

Where is 125 VASSAR ST?

125 VASSAR ST is in Cambridge, Massachusetts. Its coordinates are 42.35880, -71.09820 (latitude, longitude), as published in the Building Energy Use Disclosure Ordinance (BEUDO) file.

How big is 125 VASSAR ST and when was it built?

125 VASSAR ST has 186,998 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1964 as its year built. It is classed as college/university.

Is 125 VASSAR ST covered by BEUDO?

Yes — it appears in the 2024 Building Energy Use Disclosure Ordinance (BEUDO) disclosure, which lists the buildings reporting under BEUDO.

Working with Cambridge building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Use Disclosure Ordinance (BEUDO) (BEUDO), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “125 VASSAR ST, Cambridge, Massachusetts — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/cambridge/125-vassar-st-1ae3f3a2 (data as of October 2, 2026).