BuildingCensus
–

Domino'S Pizza Colorado Supply Chain Center

Manufacturing/Industrial Plant in Denver, CO · 10252 E. 51 St. · 80239

At a glance

Domino'S Pizza Colorado Supply Chain Center is a 34,112-square-foot manufacturing/industrial plant at 10252 E. 51 St. in Denver, Colorado, built in 1998. In its 2023 Denver benchmarking disclosure it reported a site energy-use intensity of 356.1 kBtu/ft² and 1,412 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2023
Site EUI
356.1
kBtu/ft²
GHG emissions
1,412
tCO₂e
GHG intensity
—
kgCO₂e/ft²
Floor area
34,112
sq ft
Year built
1998
vintage

Energize Denver Building Performance Policy · reporting year 2023

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI356.1 kBtu/ft²
Source EUI—
GHG emissions1,412 tCO₂e
GHG intensity—
Electricity2,204,160 kWh
Natural gas46,278 therms
Gross floor area34,112 sq ft
Source recorddenver:1285:2023

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2023latest—356.1 kBtu/ft²1,412 tCO₂e
2022—363.2 kBtu/ft²1,436 tCO₂e
2021———

Compliance context

Energize Denver Building Performance Policy

Energize Denver sets energy-use (EUI) targets for buildings of 25,000+ sq ft — for most buildings an interim target in 2028 and a final target in 2032 — with civil penalties of roughly $0.15–0.35 per kBtu over target for non-compliance.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
10252 E. 51 St.
City
Denver
State
Colorado
ZIP
80239

Within ~1 km

Nearby benchmarked buildings

This source publishes no coordinates, so nearby buildings can't be resolved yet.

See also: most efficient in Denver · biggest emitters

How does Domino'S Pizza Colorado Supply Chain Center compare with other manufacturing/industrial plant buildings in Denver?

The latest disclosures cover 240 manufacturing/industrial plant buildings in Denver, out of 3,287 buildings citywide. Its site EUI of 356.1 kBtu/ft² is about 68% above the average of 212.2 kBtu/ft² — it uses more energy per square foot than the typical building in that group.

At 34,112 sq ft, it is about 57% below the average floor area of 79,006 sq ft for those buildings. It was built in 1998, 26 years later than the group's average year built (1972). Across all 24 jurisdictions BuildingCensus covers, the 2,372 manufacturing/industrial plant buildings average an ENERGY STAR score of 67 and a site EUI of 126.3 kBtu/ft².

How has Domino'S Pizza Colorado Supply Chain Center's energy performance changed over time?

BuildingCensus holds 3 Denver disclosures for Domino'S Pizza Colorado Supply Chain Center, covering report years 2021–2023. Site EUI moved from 363.2 kBtu/ft² (2022) to 356.1 kBtu/ft² (2023), a 2% decrease. Reported emissions went from 1,436 tCO₂e to 1,412 tCO₂e over the same span (down 2%).

What does a site EUI of 356.1 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Domino'S Pizza Colorado Supply Chain Center's 356.1 kBtu/ft² across 34,112 sq ft works out to about 12.1 billion Btu (3,560 MWh-equivalent) in 2023. The disclosure also reports 2,204,160 kWh of electricity and 46,278 therms of natural gas for the year.

Which law requires Domino'S Pizza Colorado Supply Chain Center to report its energy use?

Domino'S Pizza Colorado Supply Chain Center reports under the Energize Denver Building Performance Policy, the legal basis of Denver's Energize Denver Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2023 disclosure (source record denver:1285:2023). Energize Denver sets energy-use (EUI) targets for buildings of 25,000+ sq ft — for most buildings an interim target in 2028 and a final target in 2032 — with civil penalties of roughly $0.15–0.35 per kBtu over target for non-compliance.

More manufacturing/industrial plant buildings in Denver

Frequently asked questions

What is Domino'S Pizza Colorado Supply Chain Center's energy grade?

Domino'S Pizza Colorado Supply Chain Center did not report an ENERGY STAR score in its 2023 disclosure, but its site energy-use intensity was 356.1 kBtu/ft².

How much energy does Domino'S Pizza Colorado Supply Chain Center use?

Its 2023 site energy-use intensity was 356.1 kBtu/ft² across 34,112 sq ft, including 2,204,160 kWh of electricity and 46,278 therms of natural gas.

What are Domino'S Pizza Colorado Supply Chain Center's carbon emissions?

Domino'S Pizza Colorado Supply Chain Center reported 1,412 tCO₂e of greenhouse-gas emissions for 2023.

Where is Domino'S Pizza Colorado Supply Chain Center?

Domino'S Pizza Colorado Supply Chain Center is at 10252 E. 51 St., in Denver, Colorado 80239.

How big is Domino'S Pizza Colorado Supply Chain Center and when was it built?

Domino'S Pizza Colorado Supply Chain Center has 34,112 sq ft of gross floor area, as reported in its 2023 disclosure. The disclosure lists 1998 as its year built. It is classed as manufacturing/industrial plant.

Is Domino'S Pizza Colorado Supply Chain Center covered by the Energize Denver Building Performance Policy?

Yes — it appears in the 2023 Energize Denver Benchmarking disclosure, which lists the buildings reporting under the Energize Denver Building Performance Policy.

Working with Denver building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Energize Denver Benchmarking (Energize Denver Building Performance Policy), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Domino'S Pizza Colorado Supply Chain Center, Denver, Colorado — 2023 benchmarking disclosure”, https://buildingcensus.com/buildings/denver/domino-s-pizza-colorado-supply-chain-center-1d24cae1 (data as of July 9, 2026).