BuildingCensus
–

Albest Metal Stamping Corp

Manufacturing/Industrial Plant in New York City, NY · 1 Kent Ave · 11249

At a glance

Albest Metal Stamping Corp is a 111,300-square-foot manufacturing/industrial plant at 1 Kent Ave in New York City, New York, built in 1965. In its 2023 New York City benchmarking disclosure it reported a site energy-use intensity of 37.2 kBtu/ft² and 268 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2023
Site EUI
37.2
kBtu/ft²
GHG emissions
268
tCO₂e
GHG intensity
2.4
kgCO₂e/ft²
Floor area
111,300
sq ft
Year built
1965
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

Local Law 84 (LL84) · reporting year 2023

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI37.2 kBtu/ft²
Source EUI52.7 kBtu/ft²
GHG emissions268 tCO₂e
GHG intensity2.4 kgCO₂e/ft²
Electricity254,289 kWh
Natural gas32,674 therms
Gross floor area111,300 sq ft
Source recordnyc:6800127:2023

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2023latest—37.2 kBtu/ft²268 tCO₂e
2022—47.4 kBtu/ft²312 tCO₂e

Compliance context

Local Law 84 (LL84)

Under Local Law 97, buildings over 25,000 sq ft face carbon caps with fines of $268 per metric ton of CO₂e over the limit, phasing in from 2024.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
1 Kent Ave
State
New York
ZIP
11249
Coordinates
40.72424, -73.95772

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in New York City · biggest emitters

How does Albest Metal Stamping Corp compare with other manufacturing/industrial plant buildings in New York City?

The latest disclosures cover 592 manufacturing/industrial plant buildings in New York City, out of 48,310 buildings citywide. Its site EUI of 37.2 kBtu/ft² is about 64% below the average of 102.7 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 2.4 kgCO₂e/ft² is about 69% below the group average of 7.7 kgCO₂e/ft².

At 111,300 sq ft, it is about 27% above the average floor area of 87,732 sq ft for those buildings. It was built in 1965, 16 years later than the group's average year built (1949). Across all 24 jurisdictions BuildingCensus covers, the 2,372 manufacturing/industrial plant buildings average an ENERGY STAR score of 67 and a site EUI of 126.3 kBtu/ft².

How has Albest Metal Stamping Corp's energy performance changed over time?

BuildingCensus holds 2 New York City disclosures for Albest Metal Stamping Corp, covering report years 2022–2023. Site EUI moved from 47.4 kBtu/ft² (2022) to 37.2 kBtu/ft² (2023), a 22% decrease. Reported emissions went from 312 tCO₂e to 268 tCO₂e over the same span (down 14%).

What does a site EUI of 37.2 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Albest Metal Stamping Corp's 37.2 kBtu/ft² across 111,300 sq ft works out to about 4.1 billion Btu (1,213 MWh-equivalent) in 2023. Its source EUI of 52.7 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 254,289 kWh of electricity and 32,674 therms of natural gas for the year.

Which law requires Albest Metal Stamping Corp to report its energy use?

Albest Metal Stamping Corp reports under Local Law 84 (LL84), the legal basis of New York City's Energy and Water Data Disclosure program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2023 disclosure (source record nyc:6800127:2023). Under Local Law 97, buildings over 25,000 sq ft face carbon caps with fines of $268 per metric ton of CO₂e over the limit, phasing in from 2024.

More manufacturing/industrial plant buildings in New York City

Frequently asked questions

What is Albest Metal Stamping Corp's energy grade?

Albest Metal Stamping Corp did not report an ENERGY STAR score in its 2023 disclosure, but its site energy-use intensity was 37.2 kBtu/ft².

How much energy does Albest Metal Stamping Corp use?

Its 2023 site energy-use intensity was 37.2 kBtu/ft² (52.7 kBtu/ft² source) across 111,300 sq ft, including 254,289 kWh of electricity and 32,674 therms of natural gas.

What are Albest Metal Stamping Corp's carbon emissions?

Albest Metal Stamping Corp reported 268 tCO₂e of greenhouse-gas emissions (2.4 kgCO₂e/ft²) for 2023.

Where is Albest Metal Stamping Corp?

Albest Metal Stamping Corp is at 1 Kent Ave, in New York City, New York 11249. Its coordinates are 40.72424, -73.95772 (latitude, longitude), as published in the Energy and Water Data Disclosure file.

How big is Albest Metal Stamping Corp and when was it built?

Albest Metal Stamping Corp has 111,300 sq ft of gross floor area, as reported in its 2023 disclosure. The disclosure lists 1965 as its year built. It is classed as manufacturing/industrial plant.

Is Albest Metal Stamping Corp covered by Local Law 84 (LL84)?

Yes — it appears in the 2023 Energy and Water Data Disclosure disclosure, which lists the buildings reporting under Local Law 84 (LL84).

Working with New York City building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Energy and Water Data Disclosure (Local Law 84 (LL84)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Albest Metal Stamping Corp, New York City, New York — 2023 benchmarking disclosure”, https://buildingcensus.com/buildings/new-york-city/albest-metal-stamping-corp-ecce5458 (data as of October 2, 2026).