BuildingCensus
D

DEP > BWT_9613_Owl's Head WPCP Campus

Wastewater Treatment Plant in New York City, NY · 6700 Shore Rd · 11220

At a glance

DEP > BWT_9613_Owl's Head WPCP Campus is a 669,680-square-foot wastewater treatment plant at 6700 Shore Rd in New York City, New York, built in 1940. In its 2024 New York City benchmarking disclosure it reported an ENERGY STAR score of 27 out of 100 (grade D), a site energy-use intensity of 196.6 kBtu/ft² and 14,740 tCO₂e of greenhouse-gas emissions. That score is higher than 29% of the 14 scored wastewater treatment plant buildings in New York City.

ENERGY STAR score
27
band D · 2024
Site EUI
196.6
kBtu/ft²
GHG emissions
14,740
tCO₂e
GHG intensity
22.0
kgCO₂e/ft²
Floor area
669,680
sq ft
Year built
1940
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

Local Law 84 (LL84) · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score27 (band D)
Site EUI196.6 kBtu/ft²
Source EUI530.3 kBtu/ft²
GHG emissions14,740 tCO₂e
GHG intensity22.0 kgCO₂e/ft²
Electricity36,350,549 kWh
Natural gas46,401 therms
Water use44,119 kgal
Gross floor area669,680 sq ft
Source recordnyc:21355915:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest27-8196.6 kBtu/ft²14,740 tCO₂e
202335-28197.5 kBtu/ft²13,834 tCO₂e
202263182.2 kBtu/ft²10,244 tCO₂e

Compliance context

Local Law 84 (LL84)

Under Local Law 97, buildings over 25,000 sq ft face carbon caps with fines of $268 per metric ton of CO₂e over the limit, phasing in from 2024.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
6700 Shore Rd
State
New York
ZIP
11220
Coordinates
40.64180, -74.03405

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in New York City · biggest emitters

How does DEP > BWT_9613_Owl's Head WPCP Campus compare with other wastewater treatment plant buildings in New York City?

The latest disclosures cover 14 wastewater treatment plant buildings in New York City, out of 48,310 buildings citywide. DEP > BWT_9613_Owl's Head WPCP Campus's ENERGY STAR score of 27 compares with an average of 38 across the 14 that report a score; it scores higher than 29% of them and lower than 64%. Its site EUI of 196.6 kBtu/ft² is about half of the average of 364.3 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 22.0 kgCO₂e/ft² is about 39% below the group average of 35.8 kgCO₂e/ft².

At 669,680 sq ft, it is roughly in line with the average floor area of 685,694 sq ft for those buildings. It was built in 1940, 12 years earlier than the group's average year built (1952). Across all 24 jurisdictions BuildingCensus covers, the 24 wastewater treatment plant buildings average an ENERGY STAR score of 41 and a site EUI of 373.7 kBtu/ft².

How has DEP > BWT_9613_Owl's Head WPCP Campus's energy performance changed over time?

BuildingCensus holds 3 New York City disclosures for DEP > BWT_9613_Owl's Head WPCP Campus, covering report years 2022–2024. Its ENERGY STAR score went from 63 in 2022 to 27 in 2024 (-36 points); its best year on file was 2022, at 63. Site EUI moved from 182.2 kBtu/ft² (2022) to 196.6 kBtu/ft² (2024), an 8% increase. Reported emissions went from 10,244 tCO₂e to 14,740 tCO₂e over the same span (up 44%).

What does an ENERGY STAR score of 27 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 27 means the building performs better than about 27% of its national peers. BuildingCensus bands the score into report-card grades; 27 falls in band D — lowest band (1–54). It sits 48 points below 75, the threshold for ENERGY STAR certification. In New York City, 43% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. DEP > BWT_9613_Owl's Head WPCP Campus's 196.6 kBtu/ft² across 669,680 sq ft works out to about 131.7 billion Btu (38,585 MWh-equivalent) in 2024. Its source EUI of 530.3 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 36,350,549 kWh of electricity, 46,401 therms of natural gas and 44,119 thousand gallons of water for the year.

Which law requires DEP > BWT_9613_Owl's Head WPCP Campus to report its energy use?

DEP > BWT_9613_Owl's Head WPCP Campus reports under Local Law 84 (LL84), the legal basis of New York City's Energy and Water Data Disclosure program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record nyc:21355915:2024). Under Local Law 97, buildings over 25,000 sq ft face carbon caps with fines of $268 per metric ton of CO₂e over the limit, phasing in from 2024.

More wastewater treatment plant buildings in New York City

Frequently asked questions

What is DEP > BWT_9613_Owl's Head WPCP Campus's energy grade?

DEP > BWT_9613_Owl's Head WPCP Campus scores 27 out of 100 on ENERGY STAR — band D, lowest band (1–54) — in its 2024 New York City disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does DEP > BWT_9613_Owl's Head WPCP Campus use?

Its 2024 site energy-use intensity was 196.6 kBtu/ft² (530.3 kBtu/ft² source) across 669,680 sq ft, including 36,350,549 kWh of electricity and 46,401 therms of natural gas.

What are DEP > BWT_9613_Owl's Head WPCP Campus's carbon emissions?

DEP > BWT_9613_Owl's Head WPCP Campus reported 14,740 tCO₂e of greenhouse-gas emissions (22.0 kgCO₂e/ft²) for 2024.

Where is DEP > BWT_9613_Owl's Head WPCP Campus?

DEP > BWT_9613_Owl's Head WPCP Campus is at 6700 Shore Rd, in New York City, New York 11220. Its coordinates are 40.64180, -74.03405 (latitude, longitude), as published in the Energy and Water Data Disclosure file.

How big is DEP > BWT_9613_Owl's Head WPCP Campus and when was it built?

DEP > BWT_9613_Owl's Head WPCP Campus has 669,680 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1940 as its year built. It is classed as wastewater treatment plant.

Is DEP > BWT_9613_Owl's Head WPCP Campus covered by Local Law 84 (LL84)?

Yes — it appears in the 2024 Energy and Water Data Disclosure disclosure, which lists the buildings reporting under Local Law 84 (LL84).

Working with New York City building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Energy and Water Data Disclosure (Local Law 84 (LL84)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “DEP > BWT_9613_Owl's Head WPCP Campus, New York City, New York — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/new-york-city/dep-bwt-9613-owl-s-head-wpcp-campus-ce112b24 (data as of October 2, 2026).