BuildingCensus
–

H+H_4333_Elmhurst Hospital: Parking Garage

Parking in New York City, NY · 78-00 Broadway · 11373

At a glance

H+H_4333_Elmhurst Hospital: Parking Garage is a 191,250-square-foot parking building at 78-00 Broadway in New York City, New York, built in 1993. In its 2024 New York City benchmarking disclosure it reported a site energy-use intensity of 3.7 kBtu/ft² and 82 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2024
Site EUI
3.7
kBtu/ft²
GHG emissions
82
tCO₂e
GHG intensity
0.4
kgCO₂e/ft²
Floor area
191,250
sq ft
Year built
1993
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

Local Law 84 (LL84) · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI3.7 kBtu/ft²
Source EUI10.4 kBtu/ft²
GHG emissions82 tCO₂e
GHG intensity0.4 kgCO₂e/ft²
Electricity208,022 kWh
Gross floor area191,250 sq ft
Source recordnyc:21354623:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest—3.7 kBtu/ft²82 tCO₂e
2023—3.6 kBtu/ft²76 tCO₂e
2022—5.0 kBtu/ft²81 tCO₂e

Compliance context

Local Law 84 (LL84)

Under Local Law 97, buildings over 25,000 sq ft face carbon caps with fines of $268 per metric ton of CO₂e over the limit, phasing in from 2024.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
78-00 Broadway
State
New York
ZIP
11373
Coordinates
40.74500, -73.88749

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in New York City · biggest emitters

How does H+H_4333_Elmhurst Hospital: Parking Garage compare with other parking buildings in New York City?

The latest disclosures cover 301 parking buildings in New York City, out of 48,310 buildings citywide. Its site EUI of 3.7 kBtu/ft² is about 91% below the average of 39.8 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.4 kgCO₂e/ft² is about 88% below the group average of 3.7 kgCO₂e/ft².

At 191,250 sq ft, it is about twice the average floor area of 93,719 sq ft for those buildings. It was built in 1993, 36 years later than the group's average year built (1957). Across all 24 jurisdictions BuildingCensus covers, the 1,071 parking buildings average an ENERGY STAR score of 67 and a site EUI of 40.3 kBtu/ft².

How has H+H_4333_Elmhurst Hospital: Parking Garage's energy performance changed over time?

BuildingCensus holds 3 New York City disclosures for H+H_4333_Elmhurst Hospital: Parking Garage, covering report years 2022–2024. Site EUI moved from 5.0 kBtu/ft² (2022) to 3.7 kBtu/ft² (2024), a 26% decrease. Reported emissions went from 81 tCO₂e to 82 tCO₂e over the same span (up 0%).

What does a site EUI of 3.7 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. H+H_4333_Elmhurst Hospital: Parking Garage's 3.7 kBtu/ft² across 191,250 sq ft works out to about 0.7 billion Btu (207 MWh-equivalent) in 2024. Its source EUI of 10.4 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 208,022 kWh of electricity for the year.

Which law requires H+H_4333_Elmhurst Hospital: Parking Garage to report its energy use?

H+H_4333_Elmhurst Hospital: Parking Garage reports under Local Law 84 (LL84), the legal basis of New York City's Energy and Water Data Disclosure program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record nyc:21354623:2024). Under Local Law 97, buildings over 25,000 sq ft face carbon caps with fines of $268 per metric ton of CO₂e over the limit, phasing in from 2024.

More parking buildings in New York City

Frequently asked questions

What is H+H_4333_Elmhurst Hospital: Parking Garage's energy grade?

H+H_4333_Elmhurst Hospital: Parking Garage did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 3.7 kBtu/ft².

How much energy does H+H_4333_Elmhurst Hospital: Parking Garage use?

Its 2024 site energy-use intensity was 3.7 kBtu/ft² (10.4 kBtu/ft² source) across 191,250 sq ft, including 208,022 kWh of electricity.

What are H+H_4333_Elmhurst Hospital: Parking Garage's carbon emissions?

H+H_4333_Elmhurst Hospital: Parking Garage reported 82 tCO₂e of greenhouse-gas emissions (0.4 kgCO₂e/ft²) for 2024.

Where is H+H_4333_Elmhurst Hospital: Parking Garage?

H+H_4333_Elmhurst Hospital: Parking Garage is at 78-00 Broadway, in New York City, New York 11373. Its coordinates are 40.74500, -73.88749 (latitude, longitude), as published in the Energy and Water Data Disclosure file.

How big is H+H_4333_Elmhurst Hospital: Parking Garage and when was it built?

H+H_4333_Elmhurst Hospital: Parking Garage has 191,250 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1993 as its year built. It is classed as parking.

Is H+H_4333_Elmhurst Hospital: Parking Garage covered by Local Law 84 (LL84)?

Yes — it appears in the 2024 Energy and Water Data Disclosure disclosure, which lists the buildings reporting under Local Law 84 (LL84).

Working with New York City building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Energy and Water Data Disclosure (Local Law 84 (LL84)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “H+H_4333_Elmhurst Hospital: Parking Garage, New York City, New York — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/new-york-city/h-h-4333-elmhurst-hospital-parking-garage-595a6381 (data as of October 2, 2026).