BuildingCensus
B

LPC Warehouse

Multifamily Housing in New York City, NY · 105 SOUTH 5 ST · 11249

At a glance

LPC Warehouse is a 68,861-square-foot multifamily housing building at 105 SOUTH 5 ST in New York City, New York, built in 2018. In its 2024 New York City benchmarking disclosure it reported an ENERGY STAR score of 73 out of 100 (grade B), a site energy-use intensity of 66.1 kBtu/ft² and 368 tCO₂e of greenhouse-gas emissions. That score is higher than 54% of the 22,829 scored multifamily housing buildings in New York City.

ENERGY STAR score
73
band B · 2024
Site EUI
66.1
kBtu/ft²
GHG emissions
368
tCO₂e
GHG intensity
5.3
kgCO₂e/ft²
Floor area
68,861
sq ft
Year built
2018
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

Local Law 84 (LL84) · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score73 (band B)
Site EUI66.1 kBtu/ft²
Source EUI121.1 kBtu/ft²
GHG emissions368 tCO₂e
GHG intensity5.3 kgCO₂e/ft²
Electricity596,050 kWh
Natural gas25,201 therms
Water use15,028 kgal
Gross floor area68,861 sq ft
Source recordnyc:6444916:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest7366.1 kBtu/ft²368 tCO₂e
2023———
20227270.4 kBtu/ft²323 tCO₂e

Compliance context

Local Law 84 (LL84)

Under Local Law 97, buildings over 25,000 sq ft face carbon caps with fines of $268 per metric ton of CO₂e over the limit, phasing in from 2024.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
105 SOUTH 5 ST
State
New York
ZIP
11249
Coordinates
40.71148, -73.96425

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in New York City · biggest emitters

How does LPC Warehouse compare with other multifamily housing buildings in New York City?

The latest disclosures cover 33,022 multifamily housing buildings in New York City, out of 48,310 buildings citywide. LPC Warehouse's ENERGY STAR score of 73 compares with an average of 63 across the 22,829 that report a score; it scores higher than 54% of them and lower than 44%. Its site EUI of 66.1 kBtu/ft² is about 12% below the average of 74.9 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 5.3 kgCO₂e/ft² is roughly in line with the group average of 5.2 kgCO₂e/ft².

At 68,861 sq ft, it is about 32% below the average floor area of 100,951 sq ft for those buildings. It was built in 2018, 66 years later than the group's average year built (1952). Across all 24 jurisdictions BuildingCensus covers, the 59,945 multifamily housing buildings average an ENERGY STAR score of 70 and a site EUI of 59.0 kBtu/ft².

How has LPC Warehouse's energy performance changed over time?

BuildingCensus holds 3 New York City disclosures for LPC Warehouse, covering report years 2022–2024. Its ENERGY STAR score went from 72 in 2022 to 73 in 2024 (+1 points). Site EUI moved from 70.4 kBtu/ft² (2022) to 66.1 kBtu/ft² (2024), a 6% decrease. Reported emissions went from 323 tCO₂e to 368 tCO₂e over the same span (up 14%).

What does an ENERGY STAR score of 73 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 73 means the building performs better than about 73% of its national peers. BuildingCensus bands the score into report-card grades; 73 falls in band B — above median (70–84). It sits 2 points below 75, the threshold for ENERGY STAR certification. In New York City, 43% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. LPC Warehouse's 66.1 kBtu/ft² across 68,861 sq ft works out to about 4.6 billion Btu (1,334 MWh-equivalent) in 2024. Its source EUI of 121.1 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 596,050 kWh of electricity, 25,201 therms of natural gas and 15,028 thousand gallons of water for the year.

Which law requires LPC Warehouse to report its energy use?

LPC Warehouse reports under Local Law 84 (LL84), the legal basis of New York City's Energy and Water Data Disclosure program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record nyc:6444916:2024). Under Local Law 97, buildings over 25,000 sq ft face carbon caps with fines of $268 per metric ton of CO₂e over the limit, phasing in from 2024.

More multifamily housing buildings in New York City

Frequently asked questions

What is LPC Warehouse's energy grade?

LPC Warehouse scores 73 out of 100 on ENERGY STAR — band B, above median (70–84) — in its 2024 New York City disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does LPC Warehouse use?

Its 2024 site energy-use intensity was 66.1 kBtu/ft² (121.1 kBtu/ft² source) across 68,861 sq ft, including 596,050 kWh of electricity and 25,201 therms of natural gas.

What are LPC Warehouse's carbon emissions?

LPC Warehouse reported 368 tCO₂e of greenhouse-gas emissions (5.3 kgCO₂e/ft²) for 2024.

Where is LPC Warehouse?

LPC Warehouse is at 105 SOUTH 5 ST, in New York City, New York 11249. Its coordinates are 40.71148, -73.96425 (latitude, longitude), as published in the Energy and Water Data Disclosure file.

How big is LPC Warehouse and when was it built?

LPC Warehouse has 68,861 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 2018 as its year built. It is classed as multifamily housing.

Is LPC Warehouse covered by Local Law 84 (LL84)?

Yes — it appears in the 2024 Energy and Water Data Disclosure disclosure, which lists the buildings reporting under Local Law 84 (LL84).

Working with New York City building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Energy and Water Data Disclosure (Local Law 84 (LL84)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “LPC Warehouse, New York City, New York — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/new-york-city/lpc-warehouse-ea3dc016 (data as of October 2, 2026).