BuildingCensus
C

RIIS/RIIS II/WALD/BARUCH/BARUCH HOUSES ADDITION CAMPUS

Multifamily Housing in New York City, NY · 152 AVENUE D · 10009

At a glance

RIIS/RIIS II/WALD/BARUCH/BARUCH HOUSES ADDITION CAMPUS is a 5,348,775-square-foot multifamily housing building at 152 AVENUE D in New York City, New York, built in 1949. In its 2023 New York City benchmarking disclosure it reported an ENERGY STAR score of 65 out of 100 (grade C), a site energy-use intensity of 91.3 kBtu/ft² and 31,233 tCO₂e of greenhouse-gas emissions. That score is higher than 45% of the 22,829 scored multifamily housing buildings in New York City.

ENERGY STAR score
65
band C · 2023
Site EUI
91.3
kBtu/ft²
GHG emissions
31,233
tCO₂e
GHG intensity
5.8
kgCO₂e/ft²
Floor area
5,348,775
sq ft
Year built
1949
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

Local Law 84 (LL84) · reporting year 2023

Benchmarking record

FieldValue
ENERGY STAR score65 (band C)
Site EUI91.3 kBtu/ft²
Source EUI125.0 kBtu/ft²
GHG emissions31,233 tCO₂e
GHG intensity5.8 kgCO₂e/ft²
Electricity26,223,673 kWh
Natural gas3,840,516 therms
Water use9,908 kgal
Gross floor area5,348,775 sq ft
Source recordnyc:4474020:2023

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2023latest65+6491.3 kBtu/ft²31,233 tCO₂e
20221253.4 kBtu/ft²79,550 tCO₂e

Compliance context

Local Law 84 (LL84)

Under Local Law 97, buildings over 25,000 sq ft face carbon caps with fines of $268 per metric ton of CO₂e over the limit, phasing in from 2024.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
152 AVENUE D
State
New York
ZIP
10009
Coordinates
40.72508, -73.97501

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in New York City · biggest emitters

How does RIIS/RIIS II/WALD/BARUCH/BARUCH HOUSES ADDITION CAMPUS compare with other multifamily housing buildings in New York City?

The latest disclosures cover 33,022 multifamily housing buildings in New York City, out of 48,310 buildings citywide. RIIS/RIIS II/WALD/BARUCH/BARUCH HOUSES ADDITION CAMPUS's ENERGY STAR score of 65 compares with an average of 63 across the 22,829 that report a score; it scores higher than 45% of them and lower than 54%. Its site EUI of 91.3 kBtu/ft² is about 22% above the average of 74.9 kBtu/ft² — it uses more energy per square foot than the typical building in that group. Its emissions intensity of 5.8 kgCO₂e/ft² is about 12% above the group average of 5.2 kgCO₂e/ft².

At 5,348,775 sq ft, it is about 5198% above the average floor area of 100,951 sq ft for those buildings. It was built in 1949, 3 years earlier than the group's average year built (1952). Across all 24 jurisdictions BuildingCensus covers, the 59,945 multifamily housing buildings average an ENERGY STAR score of 70 and a site EUI of 59.0 kBtu/ft².

How has RIIS/RIIS II/WALD/BARUCH/BARUCH HOUSES ADDITION CAMPUS's energy performance changed over time?

BuildingCensus holds 2 New York City disclosures for RIIS/RIIS II/WALD/BARUCH/BARUCH HOUSES ADDITION CAMPUS, covering report years 2022–2023. Its ENERGY STAR score went from 1 in 2022 to 65 in 2023 (+64 points). Site EUI moved from 253.4 kBtu/ft² (2022) to 91.3 kBtu/ft² (2023), a 64% decrease. Reported emissions went from 79,550 tCO₂e to 31,233 tCO₂e over the same span (down 61%).

What does an ENERGY STAR score of 65 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 65 means the building performs better than about 65% of its national peers. BuildingCensus bands the score into report-card grades; 65 falls in band C — below median (55–69). It sits 10 points below 75, the threshold for ENERGY STAR certification. In New York City, 43% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. RIIS/RIIS II/WALD/BARUCH/BARUCH HOUSES ADDITION CAMPUS's 91.3 kBtu/ft² across 5,348,775 sq ft works out to about 488.3 billion Btu (143,119 MWh-equivalent) in 2023. Its source EUI of 125.0 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 26,223,673 kWh of electricity, 3,840,516 therms of natural gas and 9,908 thousand gallons of water for the year.

Which law requires RIIS/RIIS II/WALD/BARUCH/BARUCH HOUSES ADDITION CAMPUS to report its energy use?

RIIS/RIIS II/WALD/BARUCH/BARUCH HOUSES ADDITION CAMPUS reports under Local Law 84 (LL84), the legal basis of New York City's Energy and Water Data Disclosure program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2023 disclosure (source record nyc:4474020:2023). Under Local Law 97, buildings over 25,000 sq ft face carbon caps with fines of $268 per metric ton of CO₂e over the limit, phasing in from 2024.

More multifamily housing buildings in New York City

Frequently asked questions

What is RIIS/RIIS II/WALD/BARUCH/BARUCH HOUSES ADDITION CAMPUS's energy grade?

RIIS/RIIS II/WALD/BARUCH/BARUCH HOUSES ADDITION CAMPUS scores 65 out of 100 on ENERGY STAR — band C, below median (55–69) — in its 2023 New York City disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does RIIS/RIIS II/WALD/BARUCH/BARUCH HOUSES ADDITION CAMPUS use?

Its 2023 site energy-use intensity was 91.3 kBtu/ft² (125.0 kBtu/ft² source) across 5,348,775 sq ft, including 26,223,673 kWh of electricity and 3,840,516 therms of natural gas.

What are RIIS/RIIS II/WALD/BARUCH/BARUCH HOUSES ADDITION CAMPUS's carbon emissions?

RIIS/RIIS II/WALD/BARUCH/BARUCH HOUSES ADDITION CAMPUS reported 31,233 tCO₂e of greenhouse-gas emissions (5.8 kgCO₂e/ft²) for 2023.

Where is RIIS/RIIS II/WALD/BARUCH/BARUCH HOUSES ADDITION CAMPUS?

RIIS/RIIS II/WALD/BARUCH/BARUCH HOUSES ADDITION CAMPUS is at 152 AVENUE D, in New York City, New York 10009. Its coordinates are 40.72508, -73.97501 (latitude, longitude), as published in the Energy and Water Data Disclosure file.

How big is RIIS/RIIS II/WALD/BARUCH/BARUCH HOUSES ADDITION CAMPUS and when was it built?

RIIS/RIIS II/WALD/BARUCH/BARUCH HOUSES ADDITION CAMPUS has 5,348,775 sq ft of gross floor area, as reported in its 2023 disclosure. The disclosure lists 1949 as its year built. It is classed as multifamily housing.

Is RIIS/RIIS II/WALD/BARUCH/BARUCH HOUSES ADDITION CAMPUS covered by Local Law 84 (LL84)?

Yes — it appears in the 2023 Energy and Water Data Disclosure disclosure, which lists the buildings reporting under Local Law 84 (LL84).

Working with New York City building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Energy and Water Data Disclosure (Local Law 84 (LL84)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “RIIS/RIIS II/WALD/BARUCH/BARUCH HOUSES ADDITION CAMPUS, New York City, New York — 2023 benchmarking disclosure”, https://buildingcensus.com/buildings/new-york-city/riis-riis-ii-wald-baruch-baruch-houses-addition-campus-fc8eafdf (data as of October 2, 2026).