BuildingCensus
–

Bathgate Site 3

Manufacturing/Industrial Plant in New York City, NY · 1701 Bathgate Ave · 10457

At a glance

Bathgate Site 3 is a 112,350-square-foot manufacturing/industrial plant at 1701 Bathgate Ave in New York City, New York, built in 1981. In its 2024 New York City benchmarking disclosure it reported a site energy-use intensity of 21.9 kBtu/ft² and 283 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2024
Site EUI
21.9
kBtu/ft²
GHG emissions
283
tCO₂e
GHG intensity
2.5
kgCO₂e/ft²
Floor area
112,350
sq ft
Year built
1981
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

Local Law 84 (LL84) · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI21.9 kBtu/ft²
Source EUI61.3 kBtu/ft²
GHG emissions283 tCO₂e
GHG intensity2.5 kgCO₂e/ft²
Electricity720,979 kWh
Natural gas0 therms
Water use132 kgal
Gross floor area112,350 sq ft
Source recordnyc:23985348:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest—21.9 kBtu/ft²283 tCO₂e
2023—18.3 kBtu/ft²224 tCO₂e
2022—58.6 kBtu/ft²419 tCO₂e

Compliance context

Local Law 84 (LL84)

Under Local Law 97, buildings over 25,000 sq ft face carbon caps with fines of $268 per metric ton of CO₂e over the limit, phasing in from 2024.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
1701 Bathgate Ave
State
New York
ZIP
10457
Coordinates
40.84195, -73.89979

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in New York City · biggest emitters

How does Bathgate Site 3 compare with other manufacturing/industrial plant buildings in New York City?

The latest disclosures cover 592 manufacturing/industrial plant buildings in New York City, out of 48,310 buildings citywide. Its site EUI of 21.9 kBtu/ft² is about 79% below the average of 102.7 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 2.5 kgCO₂e/ft² is about 67% below the group average of 7.7 kgCO₂e/ft².

At 112,350 sq ft, it is about 28% above the average floor area of 87,732 sq ft for those buildings. It was built in 1981, 32 years later than the group's average year built (1949). Across all 24 jurisdictions BuildingCensus covers, the 2,372 manufacturing/industrial plant buildings average an ENERGY STAR score of 67 and a site EUI of 126.3 kBtu/ft².

How has Bathgate Site 3's energy performance changed over time?

BuildingCensus holds 3 New York City disclosures for Bathgate Site 3, covering report years 2022–2024. Site EUI moved from 58.6 kBtu/ft² (2022) to 21.9 kBtu/ft² (2024), a 63% decrease. Reported emissions went from 419 tCO₂e to 283 tCO₂e over the same span (down 32%).

What does a site EUI of 21.9 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Bathgate Site 3's 21.9 kBtu/ft² across 112,350 sq ft works out to about 2.5 billion Btu (721 MWh-equivalent) in 2024. Its source EUI of 61.3 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 720,979 kWh of electricity, 0 therms of natural gas and 132 thousand gallons of water for the year.

Which law requires Bathgate Site 3 to report its energy use?

Bathgate Site 3 reports under Local Law 84 (LL84), the legal basis of New York City's Energy and Water Data Disclosure program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record nyc:23985348:2024). Under Local Law 97, buildings over 25,000 sq ft face carbon caps with fines of $268 per metric ton of CO₂e over the limit, phasing in from 2024.

More manufacturing/industrial plant buildings in New York City

Frequently asked questions

What is Bathgate Site 3's energy grade?

Bathgate Site 3 did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 21.9 kBtu/ft².

How much energy does Bathgate Site 3 use?

Its 2024 site energy-use intensity was 21.9 kBtu/ft² (61.3 kBtu/ft² source) across 112,350 sq ft, including 720,979 kWh of electricity and 0 therms of natural gas.

What are Bathgate Site 3's carbon emissions?

Bathgate Site 3 reported 283 tCO₂e of greenhouse-gas emissions (2.5 kgCO₂e/ft²) for 2024.

Where is Bathgate Site 3?

Bathgate Site 3 is at 1701 Bathgate Ave, in New York City, New York 10457. Its coordinates are 40.84195, -73.89979 (latitude, longitude), as published in the Energy and Water Data Disclosure file.

How big is Bathgate Site 3 and when was it built?

Bathgate Site 3 has 112,350 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1981 as its year built. It is classed as manufacturing/industrial plant.

Is Bathgate Site 3 covered by Local Law 84 (LL84)?

Yes — it appears in the 2024 Energy and Water Data Disclosure disclosure, which lists the buildings reporting under Local Law 84 (LL84).

Working with New York City building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Energy and Water Data Disclosure (Local Law 84 (LL84)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Bathgate Site 3, New York City, New York — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/new-york-city/bathgate-site-3-f434635f (data as of October 2, 2026).